NV FLAP CR 196(2), Silver Peak Road

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
6982AF19B000014
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
HUBZone

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Esmeralda County Silver Peak, Nevada, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

NV FLAP CR 196(2), Silver Peak Road

Update #2 ·

PROJECT DETAILS: NV FLAP CR 196(2) Silver Peak Road

 

The Silver Peak Road project is located on County Road 196 near the town of Silver Peak in Esmeralda County, Nevada. The project consists of 2.44 miles of roadway and drainage improvements. Improvements include construction of new paved road which includes earthwork, paving, box culverts, concrete headwalls, wingwalls at drainage structures. The project is a continuation of a previously completed project that paved CR 196 from the intersection with US 95. The project is outside Silver Peak, NV with the nearest town being Tonopah, NV which is 24 miles North from the project limits.

 

The major work elements include roadway embankment, placement of borrow material, aggregate base, asphalt pavement, paved ditch, site repairs, pre-cast box culverts, concrete headwalls and wingwalls, HDPE culverts, and pavement markings.

 

There will be up to 30 minute delays during construction. Weather conditions typically allow construction to begin in early spring.

 

Significant quantities for the overall project include:

 

Line Item                                           Unit                            Est. Quantity                           

 

Embankment Construction                  CUYD                    60,000                                    

 

Aggregate Base                                   TON                         9,500                                            

 

Hot Asphalt Concrete Pavement         TON                     6,500                                 

8’ x 8’ Precast Reinforced Concrete Box Culvert                                                                                             LNFT                       200

 

Anticipated Schedule

 

The Notice to Proceed for on-site activity is anticipated in late Winter/Spring 2020

 

Funding

 

The anticipated cost range is between $4 million and $6 million.

This solicitation will be set-aside for HUBZone small business concerns.  

 

Update #1 ·

THIS IS NOT A INVITATION FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.


PROJECT DETAILS: NV FLAP CR 196(2) Silver Peak Road

 

The Silver Peak Road project is located on County Road 196 near the town of Silver Peak in Esmeralda County, Nevada. The project consists of 2.44 miles of roadway and drainage improvements. Improvements include construction of new paved road which includes earthwork, paving, box culverts, concrete headwalls, wingwalls at drainage structures. The project is a continuation of a previously completed project that paved CR 196 from the intersection with US 95. The project is outside Silver Peak, NV with the nearest town being Tonopah, NV which is 24 miles North from the project limits.

 

The major work elements include roadway embankment, placement of borrow material, aggregate base, asphalt pavement, paved ditch, site repairs, pre-cast box culverts, concrete headwalls and wingwalls, HDPE culverts, and pavement markings.

 

There will be up to 30 minute delays during construction. Weather conditions typically allow construction to begin in early spring.

 

Significant quantities for the overall project include:

 

Line Item                                           Unit                            Est. Quantity                           

 

Embankment Construction                  CUYD                    60,000                                    

 

Aggregate Base                                   TON                         9,500                                            

 

Hot Asphalt Concrete Pavement         TON                     6,500                                 

8’ x 8’ Precast Reinforced Concrete Box Culvert                                                                                             LNFT                       200

 

Anticipated Schedule

 

The Notice to Proceed for on-site activity is anticipated in late Winter/Spring 2020

 

Funding

 

The anticipated cost range is between $4 million and $6 million.

This solicitation will be set-aside for HUBZone small business concerns.  

 

Attachments

Files attached to this notice, newest first
File Type Posted
Bid Tabulation.pdf PDF
NV_FLAP_CR_196(2)_Silver_Peak_Bid_Opening_Summary.pdf PDF
QnA_10_18_19.pdf PDF
6982AF19B000014.pdf PDF
NV196(2)_Hydraulics_Memo.pdf PDF
NV_FLAP_CR_196(2)_Silver_Peak_Road_Pavement_Report_Signed.pdf PDF
NV_FLAP_CR196(2)_Silver_Peak_Road_-_100__PLANS.pdf PDF
NV_FLAP_CR196(2)_Silver_Peak_Road_-_100__CROSS_SECTIONS.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
NV FLAP CR 196(2), Silver Peak Road Award Award Notice
NV FLAP CR 196(2), Silver Peak Road This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity