Bid Tabulation.pdf

PDF 491 KB Posted

Attached to
NV FLAP CR 196(2), Silver Peak Road Federal contract opportunity
Solicitation number
6982AF19B000014
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to NV FLAP CR 196(2), Silver Peak Road, newest first.
File Type Posted
NV_FLAP_CR_196(2)_Silver_Peak_Bid_Opening_Summary.pdf PDF
QnA_10_18_19.pdf PDF
NV_FLAP_CR_196(2)_Silver_Peak_Road_Pavement_Report_Signed.pdf PDF
6982AF19B000014.pdf PDF
NV_FLAP_CR196(2)_Silver_Peak_Road_-_100__PLANS.pdf PDF
NV_FLAP_CR196(2)_Silver_Peak_Road_-_100__CROSS_SECTIONS.pdf PDF
NV196(2)_Hydraulics_Memo.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No: NV FLAP CR 196(2)

Project Name: Silver Peak Road

Contractor

Engineer's Estimate

Hat Creek Construction & Materials, Inc.

Herback General Engineering, LLC

Intermountain West Civil Constructors, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc

Trade West Construction, Inc.

Contractor

Engineer's Estimate

Hat Creek Construction & Materials, Inc.

Herback General Engineering, LLC

Intermountain West Civil Constructors, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc

Trade West Construction, Inc.

Responsive?

Responsive?

Tabulation of Bids

Base Schedule A Option: X

$4,988,250.00

$5,131,989.00

$4,943,212.25

$6,834,427.00

$6,273,496.00

$6,721,389.62

$5,300,959.85

Total Base Schedule A and Option(s): X

$5,118,250.00

$5,261,989.00

$5,043,462.25

$6,944,427.00

$6,393,496.00

$6,846,389.62

$5,433,209.85

$130,000.00

$130,000.00

$100,250.00

$110,000.00

$120,000.00

$125,000.00

$132,250.00

Report Date: 11/06/19

1 out of 15

Solcitation No: 6982AF19B000014

Division: Central Federal Lands

State: NV County: Esmeralda

Federal Land: BLM

Tabulation of Bids

Schedule: X

Schedule Type: Options

Opened at: Lakewood,CO

Opened by: Ryan Phillips

Date: 10/24/19

Report Date: 11/06/19

2 out of 15

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date:

Contract Awarded to:

Contractor

Herback General Engineering, LLC 2531 Nowlin Road Minden Nevada 89423

Intermountain West Civil Constructors, Inc.

1564 N. Alma School Road, Suite 200 Mesa, AZ, 85201

Qualcon Contractors, Inc.

1645 Esmeralda Ave Minden Nevada 89423

Steve Manning Construction Inc P.O. Box 491660 Redding California 96049

Hat Creek Construction & Materials, Inc.

24339 Highway 89 N.

Burney California 96013

Trade West Construction, Inc.

300 W Hafen Ln Mesquite, NV 89027

Engineer's Estimate

Award Date:

Comment Bid Amount Responsive

$100,250.00

$110,000.00

$120,000.00

$125,000.00

$130,000.00

$132,250.00

$130,000.00

Contract Specialist

Line Item

Number

X0020

Pay Item No.

41801-1000

Tabulation of Bids

Description Quantity

ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1

Herback General Engineering, LLC Intermountain West Civil Constructors, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Engineer's Estimate 1,000

Total Schedule - All Items

Herback General Engineering, LLC Intermountain West Civil Constructors, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Engineer's Estimate

Schedule: X

Schedule Type: Options

Report Date: 11/06/19

3 out of 15

Unit Unit Price Amount

SQYD

$100.25 $110.00 $120.00 $125.00 $130.00 $132.25 $130.00

$100,250.00 $110,000.00 $120,000.00 $125,000.00 $130,000.00 $132,250.00 $130,000.00

$100,250.00 $110,000.00 $120,000.00 $125,000.00 $130,000.00 $132,250.00 $130,000.00

Solcitation No: 6982AF19B000014

Division: Central Federal Lands

State: NV County: Esmeralda

Federal Land: BLM

Tabulation of Bids

Schedule: A

Schedule Type: Base

Opened at: Lakewood,CO

Opened by: Ryan Phillips

Date: 10/24/19

Report Date: 11/06/19

4 out of 15

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date:

Contract Awarded to:

Contractor

Herback General Engineering, LLC 2531 Nowlin Road Minden Nevada 89423

Hat Creek Construction & Materials, Inc.

24339 Highway 89 N.

Burney California 96013

Trade West Construction, Inc.

300 W Hafen Ln Mesquite, NV 89027

Qualcon Contractors, Inc.

1645 Esmeralda Ave Minden Nevada 89423

Steve Manning Construction Inc P.O. Box 491660 Redding California 96049

Intermountain West Civil Constructors, Inc.

1564 N. Alma School Road, Suite 200 Mesa, AZ, 85201

Engineer's Estimate

Award Date:

Comment Bid Amount Responsive

$4,943,212.24

$5,131,989.00

$5,300,959.85

$6,273,496.00

$6,721,389.62

$6,834,427.00

$4,988,250.00

Line Item

Number

A0020

A0040

A0060

A0080

A0I00

Pay Item No.

15101-0000

15206-0000

15215-3000

15216-2000

15301-0000

Tabulation of Bids

Description Quantity

MOBILIZATION

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate ALL

Report Date: 11/06/19

5 out of 15

Schedule: A

Schedule Type: Base

Unit Unit Price

Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum

LPSM Lump Sum

Amount

$503,672.00 $513,000.00 $434,240.00

$1,000,000.00 $600,000.00 $680,000.00 $570,495.40

SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

Herback General Engineering, LLC $4,878.00 $11,887.69 Hat Creek Construction & Materials, Inc. $9,191.63 $22,400.00 Trade West Construction, Inc. $9,430.00 $22,980.91 Qualcon Contractors, Inc. $10,000.00 $24,370.00 Steve Manning Construction Inc $5,420.00 $13,208.54 Intermountain West Civil Constructors, Inc. $13,000.00 $31,681.00 Engineer's Estimate 2.437 MILE $5,000.00 $12,185.00

SURVEY AND STAKING, DRAINAGE STRUCTURE

Herback General Engineering, LLC $1,412.00 $12,708.00 Hat Creek Construction & Materials, Inc. $1,100.00 $9,900.00 Trade West Construction, Inc. $2,645.00 $23,805.00 Qualcon Contractors, Inc. $1,000.00 $9,000.00 Steve Manning Construction Inc $1,010.00 $9,090.00 Intermountain West Civil Constructors, Inc. $3,600.00 $32,400.00 Engineer's Estimate 9 EACH $515.00 $4,635.00

SURVEY AND STAKING, GRADE FINISHING STAKES

Herback General Engineering, LLC $4,769.00 $23,244.11 Hat Creek Construction & Materials, Inc. $3,000.00 $14,622.00 Trade West Construction, Inc. $14,145.00 $68,942.73 Qualcon Contractors, Inc. $5,000.00 $24,370.00 Steve Manning Construction Inc $5,420.00 $26,417.08 Intermountain West Civil Constructors, Inc. $10,000.00 $48,740.00 Engineer's Estimate 4.874 MILE $6,000.00 $29,244.00

CONTRACTOR QUALITY CONTROL

Herback General Engineering, LLC Lump Sum $91,672.00 Hat Creek Construction & Materials, Inc. Lump Sum $260,000.00 Trade West Construction, Inc. Lump Sum $69,000.00 Qualcon Contractors, Inc. Lump Sum $250,000.00 Steve Manning Construction Inc Lump Sum $196,000.00 Intermountain West Civil Constructors, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $55,000.00

Line Item

Number

A0120

A0140

A0160

A0180

A0200

Pay Item No.

15401-0000

15501-0000

15701-0000

15701-0000

15701-0000

Tabulation of Bids

Description Quantity

CONTRACTOR TESTING

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate ALL

CONSTRUCTION SCHEDULE

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate ALL

SOIL EROSION CONTROL (EROSION CONTROL)

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate ALL

Report Date: 11/06/19

6 out of 15

Schedule: A

Schedule Type: Base

Unit Unit Price

Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum

LPSM Lump Sum

Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum

LPSM Lump Sum

Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum

LPSM Lump Sum

Amount

$142,568.00 $241,552.00 $34,500.00

$100,000.00 $195,000.00 $175,000.00 $110,000.00

$15,920.00 $5,000.00

$34,500.00 $15,000.00 $14,500.00 $50,000.00 $30,000.00

$18,932.00 $10,000.00 $34,500.00 $10,000.00

$100,000.00 $35,000.00 $22,500.00

SOIL EROSION CONTROL (NON-STORMWATER CONTROL)

Herback General Engineering, LLC Lump Sum $2,235.00 Hat Creek Construction & Materials, Inc. Lump Sum $12,500.00 Trade West Construction, Inc. Lump Sum $34,500.00 Qualcon Contractors, Inc. Lump Sum $10,000.00 Steve Manning Construction Inc Lump Sum $25,000.00 Intermountain West Civil Constructors, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $22,500.00

SOIL EROSION CONTROL (SEDIMENT CONTROL)

Herback General Engineering, LLC Lump Sum $17,935.00 Hat Creek Construction & Materials, Inc. Lump Sum $53,000.00 Trade West Construction, Inc. Lump Sum $34,500.00 Qualcon Contractors, Inc. Lump Sum $35,000.00 Steve Manning Construction Inc Lump Sum $75,000.00 Intermountain West Civil Constructors, Inc. Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $45,000.00

Line Item

Number

A0220

A0240

A0260

A0280

A0300

Pay Item No.

15720-0000

15802-0000

20304-1000

20420-0000

25101-0200

Tabulation of Bids

Description Quantity

STORM WATER POLLUTION PREVENTION PLAN

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate ALL

WATERING FOR DUST CONTROL

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate ALL

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate ALL

EMBANKMENT CONSTRUCTION

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 48,000

PLACED RIPRAP, METHOD A, CLASS 2

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 250

Report Date: 11/06/19

7 out of 15

Schedule: A

Schedule Type: Base

Unit Unit Price

Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum

LPSM Lump Sum

Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum

LPSM Lump Sum

Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum

LPSM Lump Sum

$12.14 $18.00 $15.87 $19.00 $25.00 $24.00

CUYD $22.00

$116.00 $140.00 $230.00 $180.00 $230.00 $250.00

CUYD $170.00

Amount

$8,354.00 $21,000.00 $23,000.00 $15,000.00 $7,500.00

$25,000.00 $22,500.00

$101,930.00 $52,000.00

$287,500.00 $275,000.00 $62,500.00

$300,000.00 $33,000.00

$6,344.00 $15,000.00 $34,500.00 $35,000.00 $40,000.00 $65,000.00 $11,500.00

$582,720.00 $864,000.00 $761,760.00 $912,000.00

$1,200,000.00 $1,152,000.00 $1,056,000.00

$29,000.00 $35,000.00 $57,500.00 $45,000.00 $57,500.00 $62,500.00 $42,500.00

Line Item

Number

A0340

A0360

A0380

A0400

A0420

Pay Item No.

30101-0000

40301-0100

40601-0000

41102-1000

41105-0000

Tabulation of Bids

Description Quantity

AGGREGATE BASE

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 9,400

ASPHALT CONCRETE PAVEMENT, TYPE 1

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 6,500

FOG SEAL

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 16.430

PRIME COAT, METHOD I

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 39,000

BLOTTER

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 60

Schedule: A

Schedule Type: Base

Report Date: 11/06/19

8 out of 15

Unit Unit Price Amount

$41.70 $391,980.00 $40.00 $376,000.00 $63.25 $594,550.00 $41.00 $385,400.00 $43.00 $404,200.00 $51.00 $479,400.00

TON $25.00 $235,000.00

$207.77 $1,350,505.00 $152.00 $988,000.00 $167.90 $1,091,350.00 $168.00 $1,092,000.00 $189.00 $1,228,500.00 $215.00 $1,397,500.00

TON $130.00 $845,000.00

$845.00 $13,883.35 $1,000.00 $16,430.00

$10.93 $179.58 $1,200.00 $19,716.00

$900.00 $14,787.00 $1,700.00 $27,931.00

TON $420.00 $6,900.60

$0.80 $31,200.00 $1.30 $50,700.00 $1.15 $44,850.00 $1.00 $39,000.00 $1.20 $46,800.00 $1.25 $48,750.00

SQYD $0.60 $23,400.00

$73.00 $4,380.00 $85.00 $5,100.00

$109.25 $6,555.00 $180.00 $10,800.00 $60.00 $3,600.00 $60.00 $3,600.00

TON $30.00 $1,800.00

Line Item

Number

A0440

A0460

A0480

A0500

A0520

Pay Item No.

41201-0000

60101-0000

60101-0000

60101-0000

60101-0000

Tabulation of Bids

Description Quantity

TACKCOAT

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 16.960

Schedule: A

Schedule Type: Base

Report Date: 11/06/19

9 out of 15

Unit Unit Price Amount

$1,460.00 $24,761.60 $1,350.00 $22,896.00 $1,092.50 $18,528.80 $1,500.00 $25,440.00 $1,200.00 $20,352.00 $2,500.00 $42,400.00

TON $500.00 $8,480.00

CONCRETE (HEADWALL AND WINGWALLS FOR 8'x8' BOX CULVERT)

Herback General Engineering, LLC $1,492.00 $434,172.00 Hat Creek Construction & Materials, Inc. $2,000.00 $582,000.00 Trade West Construction, Inc. $793.50 $230,908.50 Qualcon Contractors, Inc. $2,100.00 $611,100.00 Steve Manning Construction Inc $3,000.00 $873,000.00 Intermountain West Civil Constructors, Inc. $1,900.00 $552,900.00 Engineer's Estimate 291 CUYD $1,500.00 $436,500.00

CONCRETE (HEADWALL FOR 36-INCH PIPE CUL VERT)

Herback General Engineering, LLC $7,245.00 $86,940.00 Hat Creek Construction & Materials, Inc. $1,800.00 $21,600.00 Trade West Construction, Inc. $1,150.00 $13,800.00 Qualcon Contractors, Inc. $2,100.00 $25,200.00 Steve Manning Construction Inc $3,000.00 $36,000.00 Intermountain West Civil Constructors, Inc. $1,500.00 $18,000.00 Engineer's Estimate 12 CUYD $1,500.00 $18,000.00

CONCRETE (HEADWALL FOR 42-INCH PIPE CUL VERT)

Herback General Engineering, LLC $5,504.00 $44,032.00 Hat Creek Construction & Materials, Inc. $2,400.00 $19,200.00 Trade West Construction, Inc. $1,150.00 $9,200.00 Qualcon Contractors, Inc. $2,100.00 $16,800.00 Steve Manning Construction Inc $3,000.00 $24,000.00 Intermountain West Civil Constructors, Inc. $1,600.00 $12,800.00 Engineer's Estimate 8 CUYD $1,500.00 $12,000.00

CONCRETE (HEADWALL FOR 48-INCH PIPE CUL VERT)

Herback General Engineering, LLC $4,412.00 $97,064.00 Hat Creek Construction & Materials, Inc. $2,400.00 $52,800.00 Trade West Construction, Inc. $1,150.00 $25,300.00 Qualcon Contractors, Inc. $2,100.00 $46,200.00 Steve Manning Construction Inc $3,000.00 $66,000.00 Intermountain West Civil Constructors, Inc. $1,600.00 $35,200.00 Engineer's Estimate 22 CUYD $1,500.00 $33,000.00

Line Item

Number

A0540

A0560

A0580

A0600

A0620

Pay Item No.

60201-1000

60201-1100

60201-1200

60220-2000

60907-1000

Tabulation of Bids

Description Quantity

36-INCH PIPE CUL VERT (HOPE)

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 120

42-INCH PIPE CUL VERT (HDPE)

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 70

48-INCH PIPE CUL VERT (HOPE)

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 130

Schedule: A

Schedule Type: Base

Report Date: 11/06/19

10 out of 15

Unit Unit Price Amount

$248.00 $29,760.00 $160.00 $19,200.00 $258.75 $31,050.00 $320.00 $38,400.00 $280.00 $33,600.00 $300.00 $36,000.00

LNFT $150.00 $18,000.00

$268.00 $18,760.00 $165.00 $11,550.00 $361.10 $25,277.00 $350.00 $24,500.00 $300.00 $21,000.00 $325.00 $22,750.00

LNFT $175.00 $12,250.00

$325.00 $42,250.00 $175.00 $22,750.00 $460.00 $59,800.00 $400.00 $52,000.00 $320.00 $41,600.00 $355.00 $46,150.00

LNFT $200.00 $26,000.00

8 FEET SPAN, 8 FEET RISE PRECAST REINFORCED CONCRETE BOX CUL VERT

Herback General Engineering, LLC $1,430.00 $286,000.00 Hat Creek Construction & Materials, Inc. $1,505.00 $301,000.00 Trade West Construction, Inc. $2,875.00 $575,000.00 Qualcon Contractors, Inc. $1,700.00 $340,000.00 Steve Manning Construction Inc $2,900.00 $580,000.00 Intermountain West Civil Constructors, Inc. $2,800.00 $560,000.00 Engineer's Estimate 200 LNFT $2,500.00 $500,000.00

PAVED DITCH, ASPHALT

Herback General Engineering, LLC $22.00 $121,000.00 Hat Creek Construction & Materials, Inc. $29.00 $159,500.00 Trade West Construction, Inc. $29.90 $164,450.00 Qualcon Contractors, Inc. $32.00 $176,000.00 Steve Manning Construction Inc $40.00 $220,000.00 Intermountain West Civil Constructors, Inc. $40.00 $220,000.00 Engineer's Estimate 5,500 LNFT $35.00 $192,500.00

Line Item

Number

A0640

A0660

A0680

A0700

A0720

Pay Item No.

62201-0200

62201-1000

62201-2050

62201-2850

62201-3000

Tabulation of Bids

Description Quantity

DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 40

Schedule: A

Schedule Type: Base

Report Date: 11/06/19

11outof15

Unit Unit Price Amount

$155.00 $6,200.00 $125.00 $5,000.00 $230.00 $9,200.00 $160.00 $6,400.00 $180.00 $7,200.00 $150.00 $6,000.00

HOUR $145.00 $5,800.00

WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY

Herback General Engineering, LLC $250.00 $10,000.00 Hat Creek Construction & Materials, Inc. $180.00 $7,200.00 Trade West Construction, Inc. $287.50 $11,500.00 Qualcon Contractors, Inc. $180.00 $7,200.00 Steve Manning Construction Inc $220.00 $8,800.00 Intermountain West Civil Constructors, Inc. $150.00 $6,000.00 Engineer's Estimate 40 HOUR $220.00 $8,800.00

ROLLER

Herback General Engineering, LLC $200.00 $8,000.00 Hat Creek Construction & Materials, Inc. $150.00 $6,000.00 Trade West Construction, Inc. $230.00 $9,200.00 Qualcon Contractors, Inc. $165.00 $6,600.00 Steve Manning Construction Inc $180.00 $7,200.00 Intermountain West Civil Constructors, Inc. $140.00 $5,600.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00

MOTOR GRADER, 12 FOOT MINIMUM BLADE

Herback General Engineering, LLC $250.00 $10,000.00 Hat Creek Construction & Materials, Inc. $200.00 $8,000.00 Trade West Construction, Inc. $287.50 $11,500.00 Qualcon Contractors, Inc. $180.00 $7,200.00 Steve Manning Construction Inc $250.00 $10,000.00 Intermountain West Civil Constructors, Inc. $220.00 $8,800.00 Engineer's Estimate 40 HOUR $215.00 $8,600.00

HYDRAULIC EXCAVATOR

Herback General Engineering, LLC $250.00 $10,000.00 Hat Creek Construction & Materials, Inc. $165.00 $6,600.00 Trade West Construction, Inc. $287.50 $11,500.00 Qualcon Contractors, Inc. $200.00 $8,000.00 Steve Manning Construction Inc $250.00 $10,000.00 Intermountain West Civil Constructors, Inc. $220.00 $8,800.00 Engineer's Estimate 40 HOUR $225.00 $9,000.00

Line Item

Number

A0740

A0760

A0780

A0800

A0820

Pay Item No.

62301-0000

62302-1000

62302-1100

62510-2000

62515-2000

Tabulation of Bids

Description Quantity

GENERAL LABOR

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 40

SPECIAL LABOR, HIRED TECHNICAL SERVICES

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 20

SPECIAL LABOR, HIRED SURVEY SERVICES

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 20

SEEDING, HYDRAULIC METHOD

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 23.0

MULCHING, HYDRAULIC METHOD

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 23.0

Schedule: A

Schedule Type: Base

Report Date: 11/06/19

12 out of 15

Unit Unit Price Amount

$98.00 $3,920.00 $65.00 $2,600.00

$172.50 $6,900.00 $80.00 $3,200.00 $80.00 $3,200.00 $80.00 $3,200.00

HOUR $105.00 $4,200.00

$250.00 $5,000.00 $175.00 $3,500.00 $172.50 $3,450.00 $175.00 $3,500.00 $150.00 $3,000.00 $400.00 $8,000.00

HOUR $185.00 $3,700.00

$250.00 $5,000.00 $175.00 $3,500.00 $172.50 $3,450.00 $220.00 $4,400.00 $250.00 $5,000.00 $310.00 $6,200.00

HOUR $210.00 $4,200.00

$1,685.00 $38,755.00 $1,370.00 $31,510.00 $1,506.50 $34,649.50 $1,500.00 $34,500.00 $1,960.00 $45,080.00 $1,800.00 $41,400.00

ACRE $1,100.00 $25,300.00

$1,844.00 $42,412.00 $1,513.00 $34,799.00 $1,506.50 $34,649.50 $1,700.00 $39,100.00 $2,130.00 $48,990.00 $1,800.00 $41,400.00

ACRE $1,300.00 $29,900.00

Line Item

Number

A0840

A0860

A0880

A0900

A0920

Pay Item No.

63301-0000

63308-3000

63314-0000

63402-0300

63402-0400

Tabulation of Bids

Description Quantity

SIGN SYSTEM

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 11

OBJECT MARKER, TYPE 3

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 18

RUMBLE STRIP

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 2.4

PAVEMENT MARKINGS, TYPE B, SOLID

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 10.0

PAVEMENT MARKINGS, TYPE B, BROKEN

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 5.0

Schedule: A

Schedule Type: Base

Report Date: 11/06/19

13 out of 15

Unit Unit Price Amount

$425.00 $4,675.00 $350.00 $3,850.00 $575.00 $6,325.00

$1,000.00 $11,000.00 $500.00 $5,500.00

$1,000.00 $11,000.00

EACH $500.00 $5,500.00

$140.00 $2,520.00 $150.00 $2,700.00 $575.00 $10,350.00 $300.00 $5,400.00 $150.00 $2,700.00 $400.00 $7,200.00

EACH $115.00 $2,070.00

$4,275.00 $10,260.00 $2,500.00 $6,000.00 $9,582.95 $22,999.08 $9,000.00 $21,600.00 $4,000.00 $9,600.00 $1,000.00 $2,400.00

MILE $1,500.00 $3,600.00

$758.00 $7,580.00 $1,150.00 $11,500.00 $1,150.00 $11,500.00 $1,000.00 $10,000.00 $1,100.00 $11,000.00 $1,800.00 $18,000.00

MILE $1,750.00 $17,500.00

$201.00 $1,005.00 $550.00 $2,750.00

$2,300.00 $11,500.00 $500.00 $2,500.00 $200.00 $1,000.00 $525.00 $2,625.00

MILE $1,700.00 $8,500.00

Line Item

Number

A0940

A0960

A0980

AIOO0

Al020

Pay Item No.

63502-0600

63502-1300

63503-0700

63504-1000

63506-0500

Tabulation of Bids

Description Quantity

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 4

TEMPORARY TRAFFIC CONTROL, DRUM

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 70

TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 30,000

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 157

TEMPORARY TRAFFIC CONTROL, FLAGGER

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 1,500

Schedule: A

Schedule Type: Base

Report Date: 11/06/19

14 out of 15

Unit Unit Price Amount

$1,170.00 $4,680.00 $200.00 $800.00

$1,437.50 $5,750.00 $600.00 $2,400.00 $100.00 $400.00 $300.00 $1,200.00

EACH $250.00 $1,000.00

$209.00 $14,630.00 $60.00 $4,200.00

$821.20 $57,484.00 $200.00 $14,000.00 $100.00 $7,000.00 $225.00 $15,750.00

EACH $65.00 $4,550.00

$0.15 $4,500.00 $1.00 $30,000.00 $0.38 $11,400.00 $0.20 $6,000.00 $0.35 $10,500.00 $0.25 $7,500.00

LNFT $0.20 $6,000.00

$31.50 $4,945.50 $40.00 $6,280.00 $73.25 $11,500.25

$100.00 $15,700.00 $45.00 $7,065.00

$200.00 $31,400.00

SQFT $20.00 $3,140.00

$99.00 $148,500.00 $75.00 $112,500.00 $57.50 $86,250.00

$120.00 $180,000.00 $80.00 $120,000.00 $75.00 $112,500.00

HOUR $80.00 $120,000.00

Line Item

Number

Al040

Al060

Pay Item No.

63506-0600

65001-1000

Tabulation of Bids

Description Quantity

TEMPORARY TRAFFIC CONTROL, PILOT CAR

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate 150

CONSTRUCT AND MAINTAIN DIVERSION

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate ALL

Total Schedule - All Items

Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.

Trade West Construction, Inc.

Qualcon Contractors, Inc.

Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.

Engineer's Estimate

Report Date: 11/06/19

15 out of 15

Schedule: A

Schedule Type: Base

Unit Unit Price

$95.00 $100.00 $172.50 $150.00 $120.00 $125.00

HOUR $100.00

Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum

LPSM Lump Sum

Amount

$14,250.00 $15,000.00 $25,875.00 $22,500.00 $18,000.00 $18,750.00 $15,000.00

$40,570.00 $50,000.00 $57,500.00

$200,000.00 $145,000.00 $45,000.00

$260,000.00

$4,943,212.24 $5,131,989.00 $5,300,959.85 $6,273,496.00 $6,721,389.62 $6,834,427.00 $4,988,250.00

2019-11-21T11:50:06-0700
JOREY M DEML

File details come from the government source that posted it. Updated .