Bid Tabulation.pdf
PDF 491 KB Posted
- Attached to
- NV FLAP CR 196(2), Silver Peak Road Federal contract opportunity
- Solicitation number
- 6982AF19B000014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NV_FLAP_CR_196(2)_Silver_Peak_Bid_Opening_Summary.pdf | ||
| QnA_10_18_19.pdf | ||
| NV_FLAP_CR_196(2)_Silver_Peak_Road_Pavement_Report_Signed.pdf | ||
| 6982AF19B000014.pdf | ||
| NV_FLAP_CR196(2)_Silver_Peak_Road_-_100__PLANS.pdf | ||
| NV_FLAP_CR196(2)_Silver_Peak_Road_-_100__CROSS_SECTIONS.pdf | ||
| NV196(2)_Hydraulics_Memo.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No: NV FLAP CR 196(2)
Project Name: Silver Peak Road
Contractor
Engineer's Estimate
Hat Creek Construction & Materials, Inc.
Herback General Engineering, LLC
Intermountain West Civil Constructors, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc
Trade West Construction, Inc.
Contractor
Engineer's Estimate
Hat Creek Construction & Materials, Inc.
Herback General Engineering, LLC
Intermountain West Civil Constructors, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc
Trade West Construction, Inc.
Responsive?
Responsive?
Tabulation of Bids
Base Schedule A Option: X
$4,988,250.00
$5,131,989.00
$4,943,212.25
$6,834,427.00
$6,273,496.00
$6,721,389.62
$5,300,959.85
Total Base Schedule A and Option(s): X
$5,118,250.00
$5,261,989.00
$5,043,462.25
$6,944,427.00
$6,393,496.00
$6,846,389.62
$5,433,209.85
$130,000.00
$130,000.00
$100,250.00
$110,000.00
$120,000.00
$125,000.00
$132,250.00
Report Date: 11/06/19
1 out of 15
Solcitation No: 6982AF19B000014
Division: Central Federal Lands
State: NV County: Esmeralda
Federal Land: BLM
Tabulation of Bids
Schedule: X
Schedule Type: Options
Opened at: Lakewood,CO
Opened by: Ryan Phillips
Date: 10/24/19
Report Date: 11/06/19
2 out of 15
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
Date:
Contract Awarded to:
Contractor
Herback General Engineering, LLC 2531 Nowlin Road Minden Nevada 89423
Intermountain West Civil Constructors, Inc.
1564 N. Alma School Road, Suite 200 Mesa, AZ, 85201
Qualcon Contractors, Inc.
1645 Esmeralda Ave Minden Nevada 89423
Steve Manning Construction Inc P.O. Box 491660 Redding California 96049
Hat Creek Construction & Materials, Inc.
24339 Highway 89 N.
Burney California 96013
Trade West Construction, Inc.
300 W Hafen Ln Mesquite, NV 89027
Engineer's Estimate
Award Date:
Comment Bid Amount Responsive
$100,250.00
$110,000.00
$120,000.00
$125,000.00
$130,000.00
$132,250.00
$130,000.00
Contract Specialist
Line Item
Number
X0020
Pay Item No.
41801-1000
Tabulation of Bids
Description Quantity
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
Herback General Engineering, LLC Intermountain West Civil Constructors, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Engineer's Estimate 1,000
Total Schedule - All Items
Herback General Engineering, LLC Intermountain West Civil Constructors, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Engineer's Estimate
Schedule: X
Schedule Type: Options
Report Date: 11/06/19
3 out of 15
Unit Unit Price Amount
SQYD
$100.25 $110.00 $120.00 $125.00 $130.00 $132.25 $130.00
$100,250.00 $110,000.00 $120,000.00 $125,000.00 $130,000.00 $132,250.00 $130,000.00
$100,250.00 $110,000.00 $120,000.00 $125,000.00 $130,000.00 $132,250.00 $130,000.00
Solcitation No: 6982AF19B000014
Division: Central Federal Lands
State: NV County: Esmeralda
Federal Land: BLM
Tabulation of Bids
Schedule: A
Schedule Type: Base
Opened at: Lakewood,CO
Opened by: Ryan Phillips
Date: 10/24/19
Report Date: 11/06/19
4 out of 15
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
Date:
Contract Awarded to:
Contractor
Herback General Engineering, LLC 2531 Nowlin Road Minden Nevada 89423
Hat Creek Construction & Materials, Inc.
24339 Highway 89 N.
Burney California 96013
Trade West Construction, Inc.
300 W Hafen Ln Mesquite, NV 89027
Qualcon Contractors, Inc.
1645 Esmeralda Ave Minden Nevada 89423
Steve Manning Construction Inc P.O. Box 491660 Redding California 96049
Intermountain West Civil Constructors, Inc.
1564 N. Alma School Road, Suite 200 Mesa, AZ, 85201
Engineer's Estimate
Award Date:
Comment Bid Amount Responsive
$4,943,212.24
$5,131,989.00
$5,300,959.85
$6,273,496.00
$6,721,389.62
$6,834,427.00
$4,988,250.00
Line Item
Number
A0020
A0040
A0060
A0080
A0I00
Pay Item No.
15101-0000
15206-0000
15215-3000
15216-2000
15301-0000
Tabulation of Bids
Description Quantity
MOBILIZATION
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate ALL
Report Date: 11/06/19
5 out of 15
Schedule: A
Schedule Type: Base
Unit Unit Price
Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum
LPSM Lump Sum
Amount
$503,672.00 $513,000.00 $434,240.00
$1,000,000.00 $600,000.00 $680,000.00 $570,495.40
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
Herback General Engineering, LLC $4,878.00 $11,887.69 Hat Creek Construction & Materials, Inc. $9,191.63 $22,400.00 Trade West Construction, Inc. $9,430.00 $22,980.91 Qualcon Contractors, Inc. $10,000.00 $24,370.00 Steve Manning Construction Inc $5,420.00 $13,208.54 Intermountain West Civil Constructors, Inc. $13,000.00 $31,681.00 Engineer's Estimate 2.437 MILE $5,000.00 $12,185.00
SURVEY AND STAKING, DRAINAGE STRUCTURE
Herback General Engineering, LLC $1,412.00 $12,708.00 Hat Creek Construction & Materials, Inc. $1,100.00 $9,900.00 Trade West Construction, Inc. $2,645.00 $23,805.00 Qualcon Contractors, Inc. $1,000.00 $9,000.00 Steve Manning Construction Inc $1,010.00 $9,090.00 Intermountain West Civil Constructors, Inc. $3,600.00 $32,400.00 Engineer's Estimate 9 EACH $515.00 $4,635.00
SURVEY AND STAKING, GRADE FINISHING STAKES
Herback General Engineering, LLC $4,769.00 $23,244.11 Hat Creek Construction & Materials, Inc. $3,000.00 $14,622.00 Trade West Construction, Inc. $14,145.00 $68,942.73 Qualcon Contractors, Inc. $5,000.00 $24,370.00 Steve Manning Construction Inc $5,420.00 $26,417.08 Intermountain West Civil Constructors, Inc. $10,000.00 $48,740.00 Engineer's Estimate 4.874 MILE $6,000.00 $29,244.00
CONTRACTOR QUALITY CONTROL
Herback General Engineering, LLC Lump Sum $91,672.00 Hat Creek Construction & Materials, Inc. Lump Sum $260,000.00 Trade West Construction, Inc. Lump Sum $69,000.00 Qualcon Contractors, Inc. Lump Sum $250,000.00 Steve Manning Construction Inc Lump Sum $196,000.00 Intermountain West Civil Constructors, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $55,000.00
Line Item
Number
A0120
A0140
A0160
A0180
A0200
Pay Item No.
15401-0000
15501-0000
15701-0000
15701-0000
15701-0000
Tabulation of Bids
Description Quantity
CONTRACTOR TESTING
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate ALL
CONSTRUCTION SCHEDULE
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate ALL
SOIL EROSION CONTROL (EROSION CONTROL)
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate ALL
Report Date: 11/06/19
6 out of 15
Schedule: A
Schedule Type: Base
Unit Unit Price
Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum
LPSM Lump Sum
Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum
LPSM Lump Sum
Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum
LPSM Lump Sum
Amount
$142,568.00 $241,552.00 $34,500.00
$100,000.00 $195,000.00 $175,000.00 $110,000.00
$15,920.00 $5,000.00
$34,500.00 $15,000.00 $14,500.00 $50,000.00 $30,000.00
$18,932.00 $10,000.00 $34,500.00 $10,000.00
$100,000.00 $35,000.00 $22,500.00
SOIL EROSION CONTROL (NON-STORMWATER CONTROL)
Herback General Engineering, LLC Lump Sum $2,235.00 Hat Creek Construction & Materials, Inc. Lump Sum $12,500.00 Trade West Construction, Inc. Lump Sum $34,500.00 Qualcon Contractors, Inc. Lump Sum $10,000.00 Steve Manning Construction Inc Lump Sum $25,000.00 Intermountain West Civil Constructors, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $22,500.00
SOIL EROSION CONTROL (SEDIMENT CONTROL)
Herback General Engineering, LLC Lump Sum $17,935.00 Hat Creek Construction & Materials, Inc. Lump Sum $53,000.00 Trade West Construction, Inc. Lump Sum $34,500.00 Qualcon Contractors, Inc. Lump Sum $35,000.00 Steve Manning Construction Inc Lump Sum $75,000.00 Intermountain West Civil Constructors, Inc. Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $45,000.00
Line Item
Number
A0220
A0240
A0260
A0280
A0300
Pay Item No.
15720-0000
15802-0000
20304-1000
20420-0000
25101-0200
Tabulation of Bids
Description Quantity
STORM WATER POLLUTION PREVENTION PLAN
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate ALL
WATERING FOR DUST CONTROL
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate ALL
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate ALL
EMBANKMENT CONSTRUCTION
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 48,000
PLACED RIPRAP, METHOD A, CLASS 2
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 250
Report Date: 11/06/19
7 out of 15
Schedule: A
Schedule Type: Base
Unit Unit Price
Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum
LPSM Lump Sum
Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum
LPSM Lump Sum
Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum
LPSM Lump Sum
$12.14 $18.00 $15.87 $19.00 $25.00 $24.00
CUYD $22.00
$116.00 $140.00 $230.00 $180.00 $230.00 $250.00
CUYD $170.00
Amount
$8,354.00 $21,000.00 $23,000.00 $15,000.00 $7,500.00
$25,000.00 $22,500.00
$101,930.00 $52,000.00
$287,500.00 $275,000.00 $62,500.00
$300,000.00 $33,000.00
$6,344.00 $15,000.00 $34,500.00 $35,000.00 $40,000.00 $65,000.00 $11,500.00
$582,720.00 $864,000.00 $761,760.00 $912,000.00
$1,200,000.00 $1,152,000.00 $1,056,000.00
$29,000.00 $35,000.00 $57,500.00 $45,000.00 $57,500.00 $62,500.00 $42,500.00
Line Item
Number
A0340
A0360
A0380
A0400
A0420
Pay Item No.
30101-0000
40301-0100
40601-0000
41102-1000
41105-0000
Tabulation of Bids
Description Quantity
AGGREGATE BASE
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 9,400
ASPHALT CONCRETE PAVEMENT, TYPE 1
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 6,500
FOG SEAL
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 16.430
PRIME COAT, METHOD I
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 39,000
BLOTTER
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 60
Schedule: A
Schedule Type: Base
Report Date: 11/06/19
8 out of 15
Unit Unit Price Amount
$41.70 $391,980.00 $40.00 $376,000.00 $63.25 $594,550.00 $41.00 $385,400.00 $43.00 $404,200.00 $51.00 $479,400.00
TON $25.00 $235,000.00
$207.77 $1,350,505.00 $152.00 $988,000.00 $167.90 $1,091,350.00 $168.00 $1,092,000.00 $189.00 $1,228,500.00 $215.00 $1,397,500.00
TON $130.00 $845,000.00
$845.00 $13,883.35 $1,000.00 $16,430.00
$10.93 $179.58 $1,200.00 $19,716.00
$900.00 $14,787.00 $1,700.00 $27,931.00
TON $420.00 $6,900.60
$0.80 $31,200.00 $1.30 $50,700.00 $1.15 $44,850.00 $1.00 $39,000.00 $1.20 $46,800.00 $1.25 $48,750.00
SQYD $0.60 $23,400.00
$73.00 $4,380.00 $85.00 $5,100.00
$109.25 $6,555.00 $180.00 $10,800.00 $60.00 $3,600.00 $60.00 $3,600.00
TON $30.00 $1,800.00
Line Item
Number
A0440
A0460
A0480
A0500
A0520
Pay Item No.
41201-0000
60101-0000
60101-0000
60101-0000
60101-0000
Tabulation of Bids
Description Quantity
TACKCOAT
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 16.960
Schedule: A
Schedule Type: Base
Report Date: 11/06/19
9 out of 15
Unit Unit Price Amount
$1,460.00 $24,761.60 $1,350.00 $22,896.00 $1,092.50 $18,528.80 $1,500.00 $25,440.00 $1,200.00 $20,352.00 $2,500.00 $42,400.00
TON $500.00 $8,480.00
CONCRETE (HEADWALL AND WINGWALLS FOR 8'x8' BOX CULVERT)
Herback General Engineering, LLC $1,492.00 $434,172.00 Hat Creek Construction & Materials, Inc. $2,000.00 $582,000.00 Trade West Construction, Inc. $793.50 $230,908.50 Qualcon Contractors, Inc. $2,100.00 $611,100.00 Steve Manning Construction Inc $3,000.00 $873,000.00 Intermountain West Civil Constructors, Inc. $1,900.00 $552,900.00 Engineer's Estimate 291 CUYD $1,500.00 $436,500.00
CONCRETE (HEADWALL FOR 36-INCH PIPE CUL VERT)
Herback General Engineering, LLC $7,245.00 $86,940.00 Hat Creek Construction & Materials, Inc. $1,800.00 $21,600.00 Trade West Construction, Inc. $1,150.00 $13,800.00 Qualcon Contractors, Inc. $2,100.00 $25,200.00 Steve Manning Construction Inc $3,000.00 $36,000.00 Intermountain West Civil Constructors, Inc. $1,500.00 $18,000.00 Engineer's Estimate 12 CUYD $1,500.00 $18,000.00
CONCRETE (HEADWALL FOR 42-INCH PIPE CUL VERT)
Herback General Engineering, LLC $5,504.00 $44,032.00 Hat Creek Construction & Materials, Inc. $2,400.00 $19,200.00 Trade West Construction, Inc. $1,150.00 $9,200.00 Qualcon Contractors, Inc. $2,100.00 $16,800.00 Steve Manning Construction Inc $3,000.00 $24,000.00 Intermountain West Civil Constructors, Inc. $1,600.00 $12,800.00 Engineer's Estimate 8 CUYD $1,500.00 $12,000.00
CONCRETE (HEADWALL FOR 48-INCH PIPE CUL VERT)
Herback General Engineering, LLC $4,412.00 $97,064.00 Hat Creek Construction & Materials, Inc. $2,400.00 $52,800.00 Trade West Construction, Inc. $1,150.00 $25,300.00 Qualcon Contractors, Inc. $2,100.00 $46,200.00 Steve Manning Construction Inc $3,000.00 $66,000.00 Intermountain West Civil Constructors, Inc. $1,600.00 $35,200.00 Engineer's Estimate 22 CUYD $1,500.00 $33,000.00
Line Item
Number
A0540
A0560
A0580
A0600
A0620
Pay Item No.
60201-1000
60201-1100
60201-1200
60220-2000
60907-1000
Tabulation of Bids
Description Quantity
36-INCH PIPE CUL VERT (HOPE)
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 120
42-INCH PIPE CUL VERT (HDPE)
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 70
48-INCH PIPE CUL VERT (HOPE)
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 130
Schedule: A
Schedule Type: Base
Report Date: 11/06/19
10 out of 15
Unit Unit Price Amount
$248.00 $29,760.00 $160.00 $19,200.00 $258.75 $31,050.00 $320.00 $38,400.00 $280.00 $33,600.00 $300.00 $36,000.00
LNFT $150.00 $18,000.00
$268.00 $18,760.00 $165.00 $11,550.00 $361.10 $25,277.00 $350.00 $24,500.00 $300.00 $21,000.00 $325.00 $22,750.00
LNFT $175.00 $12,250.00
$325.00 $42,250.00 $175.00 $22,750.00 $460.00 $59,800.00 $400.00 $52,000.00 $320.00 $41,600.00 $355.00 $46,150.00
LNFT $200.00 $26,000.00
8 FEET SPAN, 8 FEET RISE PRECAST REINFORCED CONCRETE BOX CUL VERT
Herback General Engineering, LLC $1,430.00 $286,000.00 Hat Creek Construction & Materials, Inc. $1,505.00 $301,000.00 Trade West Construction, Inc. $2,875.00 $575,000.00 Qualcon Contractors, Inc. $1,700.00 $340,000.00 Steve Manning Construction Inc $2,900.00 $580,000.00 Intermountain West Civil Constructors, Inc. $2,800.00 $560,000.00 Engineer's Estimate 200 LNFT $2,500.00 $500,000.00
PAVED DITCH, ASPHALT
Herback General Engineering, LLC $22.00 $121,000.00 Hat Creek Construction & Materials, Inc. $29.00 $159,500.00 Trade West Construction, Inc. $29.90 $164,450.00 Qualcon Contractors, Inc. $32.00 $176,000.00 Steve Manning Construction Inc $40.00 $220,000.00 Intermountain West Civil Constructors, Inc. $40.00 $220,000.00 Engineer's Estimate 5,500 LNFT $35.00 $192,500.00
Line Item
Number
A0640
A0660
A0680
A0700
A0720
Pay Item No.
62201-0200
62201-1000
62201-2050
62201-2850
62201-3000
Tabulation of Bids
Description Quantity
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 40
Schedule: A
Schedule Type: Base
Report Date: 11/06/19
11outof15
Unit Unit Price Amount
$155.00 $6,200.00 $125.00 $5,000.00 $230.00 $9,200.00 $160.00 $6,400.00 $180.00 $7,200.00 $150.00 $6,000.00
HOUR $145.00 $5,800.00
WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
Herback General Engineering, LLC $250.00 $10,000.00 Hat Creek Construction & Materials, Inc. $180.00 $7,200.00 Trade West Construction, Inc. $287.50 $11,500.00 Qualcon Contractors, Inc. $180.00 $7,200.00 Steve Manning Construction Inc $220.00 $8,800.00 Intermountain West Civil Constructors, Inc. $150.00 $6,000.00 Engineer's Estimate 40 HOUR $220.00 $8,800.00
ROLLER
Herback General Engineering, LLC $200.00 $8,000.00 Hat Creek Construction & Materials, Inc. $150.00 $6,000.00 Trade West Construction, Inc. $230.00 $9,200.00 Qualcon Contractors, Inc. $165.00 $6,600.00 Steve Manning Construction Inc $180.00 $7,200.00 Intermountain West Civil Constructors, Inc. $140.00 $5,600.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00
MOTOR GRADER, 12 FOOT MINIMUM BLADE
Herback General Engineering, LLC $250.00 $10,000.00 Hat Creek Construction & Materials, Inc. $200.00 $8,000.00 Trade West Construction, Inc. $287.50 $11,500.00 Qualcon Contractors, Inc. $180.00 $7,200.00 Steve Manning Construction Inc $250.00 $10,000.00 Intermountain West Civil Constructors, Inc. $220.00 $8,800.00 Engineer's Estimate 40 HOUR $215.00 $8,600.00
HYDRAULIC EXCAVATOR
Herback General Engineering, LLC $250.00 $10,000.00 Hat Creek Construction & Materials, Inc. $165.00 $6,600.00 Trade West Construction, Inc. $287.50 $11,500.00 Qualcon Contractors, Inc. $200.00 $8,000.00 Steve Manning Construction Inc $250.00 $10,000.00 Intermountain West Civil Constructors, Inc. $220.00 $8,800.00 Engineer's Estimate 40 HOUR $225.00 $9,000.00
Line Item
Number
A0740
A0760
A0780
A0800
A0820
Pay Item No.
62301-0000
62302-1000
62302-1100
62510-2000
62515-2000
Tabulation of Bids
Description Quantity
GENERAL LABOR
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 40
SPECIAL LABOR, HIRED TECHNICAL SERVICES
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 20
SPECIAL LABOR, HIRED SURVEY SERVICES
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 20
SEEDING, HYDRAULIC METHOD
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 23.0
MULCHING, HYDRAULIC METHOD
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 23.0
Schedule: A
Schedule Type: Base
Report Date: 11/06/19
12 out of 15
Unit Unit Price Amount
$98.00 $3,920.00 $65.00 $2,600.00
$172.50 $6,900.00 $80.00 $3,200.00 $80.00 $3,200.00 $80.00 $3,200.00
HOUR $105.00 $4,200.00
$250.00 $5,000.00 $175.00 $3,500.00 $172.50 $3,450.00 $175.00 $3,500.00 $150.00 $3,000.00 $400.00 $8,000.00
HOUR $185.00 $3,700.00
$250.00 $5,000.00 $175.00 $3,500.00 $172.50 $3,450.00 $220.00 $4,400.00 $250.00 $5,000.00 $310.00 $6,200.00
HOUR $210.00 $4,200.00
$1,685.00 $38,755.00 $1,370.00 $31,510.00 $1,506.50 $34,649.50 $1,500.00 $34,500.00 $1,960.00 $45,080.00 $1,800.00 $41,400.00
ACRE $1,100.00 $25,300.00
$1,844.00 $42,412.00 $1,513.00 $34,799.00 $1,506.50 $34,649.50 $1,700.00 $39,100.00 $2,130.00 $48,990.00 $1,800.00 $41,400.00
ACRE $1,300.00 $29,900.00
Line Item
Number
A0840
A0860
A0880
A0900
A0920
Pay Item No.
63301-0000
63308-3000
63314-0000
63402-0300
63402-0400
Tabulation of Bids
Description Quantity
SIGN SYSTEM
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 11
OBJECT MARKER, TYPE 3
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 18
RUMBLE STRIP
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 2.4
PAVEMENT MARKINGS, TYPE B, SOLID
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 10.0
PAVEMENT MARKINGS, TYPE B, BROKEN
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 5.0
Schedule: A
Schedule Type: Base
Report Date: 11/06/19
13 out of 15
Unit Unit Price Amount
$425.00 $4,675.00 $350.00 $3,850.00 $575.00 $6,325.00
$1,000.00 $11,000.00 $500.00 $5,500.00
$1,000.00 $11,000.00
EACH $500.00 $5,500.00
$140.00 $2,520.00 $150.00 $2,700.00 $575.00 $10,350.00 $300.00 $5,400.00 $150.00 $2,700.00 $400.00 $7,200.00
EACH $115.00 $2,070.00
$4,275.00 $10,260.00 $2,500.00 $6,000.00 $9,582.95 $22,999.08 $9,000.00 $21,600.00 $4,000.00 $9,600.00 $1,000.00 $2,400.00
MILE $1,500.00 $3,600.00
$758.00 $7,580.00 $1,150.00 $11,500.00 $1,150.00 $11,500.00 $1,000.00 $10,000.00 $1,100.00 $11,000.00 $1,800.00 $18,000.00
MILE $1,750.00 $17,500.00
$201.00 $1,005.00 $550.00 $2,750.00
$2,300.00 $11,500.00 $500.00 $2,500.00 $200.00 $1,000.00 $525.00 $2,625.00
MILE $1,700.00 $8,500.00
Line Item
Number
A0940
A0960
A0980
AIOO0
Al020
Pay Item No.
63502-0600
63502-1300
63503-0700
63504-1000
63506-0500
Tabulation of Bids
Description Quantity
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 4
TEMPORARY TRAFFIC CONTROL, DRUM
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 70
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 30,000
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 157
TEMPORARY TRAFFIC CONTROL, FLAGGER
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 1,500
Schedule: A
Schedule Type: Base
Report Date: 11/06/19
14 out of 15
Unit Unit Price Amount
$1,170.00 $4,680.00 $200.00 $800.00
$1,437.50 $5,750.00 $600.00 $2,400.00 $100.00 $400.00 $300.00 $1,200.00
EACH $250.00 $1,000.00
$209.00 $14,630.00 $60.00 $4,200.00
$821.20 $57,484.00 $200.00 $14,000.00 $100.00 $7,000.00 $225.00 $15,750.00
EACH $65.00 $4,550.00
$0.15 $4,500.00 $1.00 $30,000.00 $0.38 $11,400.00 $0.20 $6,000.00 $0.35 $10,500.00 $0.25 $7,500.00
LNFT $0.20 $6,000.00
$31.50 $4,945.50 $40.00 $6,280.00 $73.25 $11,500.25
$100.00 $15,700.00 $45.00 $7,065.00
$200.00 $31,400.00
SQFT $20.00 $3,140.00
$99.00 $148,500.00 $75.00 $112,500.00 $57.50 $86,250.00
$120.00 $180,000.00 $80.00 $120,000.00 $75.00 $112,500.00
HOUR $80.00 $120,000.00
Line Item
Number
Al040
Al060
Pay Item No.
63506-0600
65001-1000
Tabulation of Bids
Description Quantity
TEMPORARY TRAFFIC CONTROL, PILOT CAR
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate 150
CONSTRUCT AND MAINTAIN DIVERSION
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate ALL
Total Schedule - All Items
Herback General Engineering, LLC Hat Creek Construction & Materials, Inc.
Trade West Construction, Inc.
Qualcon Contractors, Inc.
Steve Manning Construction Inc Intermountain West Civil Constructors, Inc.
Engineer's Estimate
Report Date: 11/06/19
15 out of 15
Schedule: A
Schedule Type: Base
Unit Unit Price
$95.00 $100.00 $172.50 $150.00 $120.00 $125.00
HOUR $100.00
Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum
LPSM Lump Sum
Amount
$14,250.00 $15,000.00 $25,875.00 $22,500.00 $18,000.00 $18,750.00 $15,000.00
$40,570.00 $50,000.00 $57,500.00
$200,000.00 $145,000.00 $45,000.00
$260,000.00
$4,943,212.24 $5,131,989.00 $5,300,959.85 $6,273,496.00 $6,721,389.62 $6,834,427.00 $4,988,250.00