M1 Letts Stormproofing
Awarded Award Notice Posted
- Solicitation number
- AG-9AC7-S-16-0061
- Agency
- Region 5 - Pacific Southwest Region Forest Service, Department of Agriculture
- Awarded
- to Judd Buick Construction, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-9AC7-C-16-0064 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Grindstone Ranger District Mendocino National Forest 825 N. Humboldt Avenue Willows, California 95988, United States
Notice details come from SAM.gov. Updated .
Notice text
Added: Mar 28, 2016 6:13 pm
**PLEASE READ: THIS IS A PRE-SOLICITATION NOTICE. NO OTHER INFORMATION IS AVAILABLE UNTIL THE SOLICITATION IS ISSUED ON THE DATE IDENTIFIED BELOW**
Solicitation Documents: The solicitation will be issued as a Request for Proposal (RFP) requiring both price and technical proposals responding to evaluation criteria described in the solicitation. Documents will only be available electronically to download from this website on or about April 12, 2016.
Description: The purpose for this solicitation is to secure services for the reconditioning a total of 5.0 miles of Forest System Roads. The work will be done in sections of the following roads 17N09, 17N02, and M10 on the Grindstone Ranger District of the Mendocino National Forest. Major items of work include, but are not limited to: grinding or scarifing the entire existing road surface, including exposed rock, down to a 12" minimum depth, and a 3" minus rock size, removal of berms and ditchs where marked on the ground, removal of structures and obstuctions, reconstructing the surface to outslope where marked on the ground, placing cushion or borrow material on surface where marked on the ground, construction of 100 rolling dips, and placing 350 tons of riprap at the outlet of marked rolling dips.
Unless otherwise provided, the Contractor shall furnish all labor, transportation, equipment, tools, supervision, materials and any necessary incidentals to accomplish work on this project.
Location: The project is located on the Grindstone Ranger District of the Mendocino National Forest. To reach the project from Willows, California: from the intersection of Interstate 5 and from Willows, Ca. at the junction of I-5 and State Highway 162: proceed west on State Highway 162 approximately 21 miles to the junction of County Road 306; turn left on Co. Rd. 306 approximately 18 miles to junction with County Road 43A (M10, M.P.0.00) at the Stonyford Work Center; turn right on County Road 43A/M10, drive 12 miles to the end of pavement to beginning of project.
Price Range: $250,000 - $500,000
Contract Time: 45 Calendar Days
Estimated Start Date: June 1, 2016.
Set-Aside: This project is 100% set aside for Small Business.
Bonds: A Bid guarantee is required with the offer. Performance and Payment Bonds in the amount of 100% of the contract price will be required of the successful contractor within 10 days of award.
Response Location: Offers will be accepted at the Northern California Acquisition Service Area, Redding Office, located within the Shasta-Trinity National Forest Headquarters at 3644 Avtech Parkway, Redding, CA 96002 NO LATER than date and time indicated on solicitation.
SAM REGISTRATION REQUIREMENTS: Prospective contractors must be registered in the System for Award Management (SAM) prior to award. SAM is a consolidation of the former Central Contractor Registration (CCR) and On-line Representation and Certification Application (ORCA) databases.
Attachments
| File | Type | Posted |
|---|---|---|
| Amendment_0001_AG-9AC7-S-16-0061.pdf | ||
| 4._CA9 _mod_5_Dated_030416.pdf | ||
| AG-9AC7-S-16-0061_Solicitation.pdf | ||
| SF_24_BID_BOND.pdf | ||
| 2._DRAWINGS_M10-LETTS_STORMPROOFING.pdf | ||
| 1._Project_Specs._final.pdf | ||
| 3._Fire_Plan_080212.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity