Lubec LPOE Breakroom Renovation
Awarded Award Notice Posted
- Solicitation number
- 47PB0219R0008
- Agency
- Region 1 Public Buildings Service, General Services Administration
- Awarded
- to Michael Melton Contracting LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 47PB0219C0009 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Lubec Land Port of Entry 3 Washington Street Route 189 Lubec, Maine 04652, United States
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Awarded Vendors: Melton, Michael C. Contract Award Dollar Amount: $77,900.00. Contract Award Date: 2019-09-30.
Update #4 ·
Amendment 0002 is to add information from the site visit..
Update #3 ·
This amendment is to change the site visit date and time. It was originally scheduled for Monday, July 1, 2019 at 11:00 AM.
It will now be Tuesday, July 9, 2019 at 11:00 AM.
.
Update #2 ·
This solicitation does authorize the transmittal of offers, modifications, or withdrawals of offers through email. Please email a copy of your proposal to lyska.benitez@gsa.gov with a cc: to kimberly.gelly@gsa.gov to be received no later than Wednesday, July 17, 2019 at 2:00 PM, Eastern Daylight Time. Hard copy submissions are also acceptable, as prescribed by FAR 52.215-1(c)(1). No other means of transmission are acceptable.
.
Update #1 ·
SYNOPSIS
The Contractor will be required to provide all labor, materials, equipment, supervision, management, and oversight for the specified Work elements identified below.
The Project is to include however not limited to the following:
Breakroom Cabinetry and appurtenances including countertop and integral backsplash.
Breakroom Plumbing Fixture to include sink, faucet, and connections.
Breakroom Appliances to include electric range, refrigerator, microwave.
Breakroom Electrical and Mechanical to include new branch wiring to new receptacles, new hydronic panel radiator, and new exhaust fan and wallcap.
Finish Flooring Replacement to include tile, cove base, transition strips.
Interior Finish Painting (gypsum wall surfaces).
Vinyl Asbestos Flooring remediation in certain rooms and spaces to include adhesive mastic (as part of the new flooring replacement work in certain rooms and spaces only).
All administrative requirements as indicated in the Summary of Work and its parts.
The solicitation package will be posted on or about June 19, 2019.
The Estimated Cost is between $25,000 and $100,000.
This award is 100% reserved for small business.
.
Attachments
| File | Type | Posted |
|---|---|---|
| Site_Visit_info.pdf | ||
| Solicitation_Amendment_47PB0219R0008_0002.pdf | ||
| Solicitation_Amendment_47PB0219R0008_0001.pdf | ||
| Wages_2019_06_24.pdf | ||
| Drawings.pdf | ||
| Solicitation.pdf | ||
| Asbestos_&_Lead_Paint_Summary_Report.pdf | ||
| Reps&Certs.pdf | ||
| 47PB0219R0008_SF1442.pdf | ||
| Evaluation_Factor_Checklist.pdf | ||
| CRQ.pdf | ||
| Agreement.pdf | ||
| SOW.pdf |
Show all 13
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity