Lake Cumberland Solar Array Photovoltaic Installation Project

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912P522B0026
Agency
ENDIST Nashville US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
PSC
N059 Installation Of Equipment- Electrical And Electronic Equipment Components

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals to install two photovoltaic solar arrays with backup energy resiliency systems at a U.S. Army Corps of Engineers facility in Somerset, Kentucky. The scope of work includes designing and installing a roof-mounted solar array with optional backup generator for the Lake Cumberland Facility Maintenance Office, as well as a separate ground-mounted solar array with backup generator and new security lighting for the Resource Management Office. Proposals must be submitted in response to the solicitation number provided by August 11, 2022. Evaluation will be based on technical qualifications, past performance, and price. An organized site visit was held on July 19, 2022 to provide more details on requirements.

The set-aside is designated for total small business. The primary NAICS code is 238210 and PSC code R408. The solicitation is being conducted by the Department of the Army Corps of Engineers Engineering District Nashville. The contractor must complete all work within 196 calendar days of award. Historical energy usage data is provided for one building to aid in appropriate system sizing. The total generating capacity required is 90 kW split between the two locations in Somerset, Kentucky.

Notice text

3 versions

Update #3 · Latest ·

The purpose of this amendment is to:

  1. Correct the term RFP to IFB found throughout the Scope of Work.
  2. Provide a copy of the Electrical Usage Data.

*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912P522B0026' to obtain more details.*

Update #2 ·

The contract objectives are to install two (2) solar panel photovoltaic arrays with back-up energy resiliency systems at a U.S. Army Corps of Engineers (USACE) facility. The Statement of Work (SOW) includes all work required to design, provide, and install the following: one complete system for a utility grid-tied ROOF mounted photovoltaic (PV) and propane fueled back-up energy generator (option item) solution for the U.S. Army Corps of Engineers Lake Cumberland Facility Maintenance Office AND one, separate complete system for a utility grid-tied GROUND mounted photovoltaic (PV) and propane fueled back-up energy (option item) solution for the Resource Management Office. Work of this contract includes provision and installation of new LED luminaires with photo motion sensor for security lighting installed underneath the GROUND mounted PV array.An organized site visit has been scheduled for--Tuesday 19 July 2022 at 0830 AM Central TimePOC: Scott MullinsContact Number: 606-679-6337Participants will meet at--Address: 855 Boat Dock Road, Somerset, KY 42501County: PulaskiMeeting Location: FMO Conference RoomPlease complete site visit forms attached and provide them to Kathryn Pascual at Kathryn.H.Pascual@usace.army.mil and Dellaria Martin at dellaria.l.martin@usace.army.mil. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912P522B0026' to obtain more details.*

Update #1 ·

The contract objectives are to install two (2) solar panel photovoltaic arrays with back-up energy resiliency systems at a U.S. Army Corps of Engineers (USACE) facility. The Statement of Work (SOW) includes all work required to design, provide, and install the following: one complete system for a utility grid-tied ROOF mounted photovoltaic (PV) and propane fueled back-up energy generator (option item) solution for the U.S. Army Corps of Engineers Lake Cumberland Facility Maintenance Office AND one, separate complete system for a utility grid-tied GROUND mounted photovoltaic (PV) and propane fueled back-up energy (option item) solution for the Resource Management Office. Work of this contract includes provision and installation of new LED luminaires with photo motion sensor for security lighting installed underneath the GROUND mounted PV array.

An organized site visit has been scheduled for--Tuesday 19 July 2022 at 0830 AM Central Time

POC: Scott Mullins

Contact Number: 606-679-6337

Participants will meet at--Address: 855 Boat Dock Road, Somerset, KY 42501

County: Pulaski

Meeting Location: FMO Conference Room

Please complete site visit forms attached and provide them to Kathryn Pascual at Kathryn.H.Pascual@usace.army.mil and Dellaria Martin at dellaria.l.martin@usace.army.mil.

*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912P522B0026' to obtain more details.*

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Lake Cumberland Solar Array Photovoltaic Installation Project Award Award Notice
Lake Cumberland Solar Array Photovoltaic Installation Project This notice · Latest solicitation Solicitation
Lake Cumberland Solar Arrays Project Original Pre-Solicitation