Jackson Creek AOP Culvert Replacement
Awarded Award Notice Posted
- Solicitation number
- AG-569R-S-16-0014
- Agency
- Region 9 - Eastern Region Forest Service, Department of Agriculture
- Awarded
- to M Jolma Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-569R-C-16-0012 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Bessemer Ranger District Bessemer, Michigan, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Mar 23, 2016 12:15 pm
Modified: Apr 07, 2016 4:55 pmTrack Changes
The Ottawa National Forest announces an opportunity for the Jackson Creek Culvert Replacement project. In accordance with FAR Part 36.204(b), the estimated magnitude of construction is between $100,000 and $250,000. The applicable North American Industry Classification System (NAICS) Code is 237310. The Small Business Administration size standard is $36.5 million. Contractors are required to be actively registered with the System for Award Management (SAM). No hard copies of the solicitation, supporting documents and applicable amendments, if any will be provided. To receive the entire solicitation package and any applicable amendments, prospective offerors must download them from the FedBizOpps website, www.fbo.gov. The contractor shall provide all management and project administration services, quality control, logistical support, vehicles, labor, equipment and materials to complete the project on time and on schedule. The intent of this contract is to provide for the replacement of the lower and middle Jackson Creek culverts. This will include but is not limited to traffic control monitoring; furnish and install the new culverts; furnish and install backfill for the culverts; furnish all sub-grade material for raising of the road grade; furnish and place aggregate to final road grade; seed and mulch all disturbed areas; and protect Jackson Creek and associated wetlands from siltation and other destructive impacts of construction. No reimbursement will be made for costs associated with providing information in response to this synopsis, the pending solicitation or any follow-up information requests. The full solicitation package will be available on or about April 8, 2016.
Update #1 ·
Added: Mar 23, 2016 12:15 pm
The Ottawa National Forest announces an opportunity for the Jackson Creek Culvert Replacement project. In accordance with FAR Part 36.204(b), the estimated magnitude of construction is between $100,000 and $250,000. The applicable North American Industry Classification System (NAICS) Code is 237310. The Small Business Administration size standard is $36.5 million. Contractors are required to be actively registered with the System for Award Management (SAM). No hard copies of the solicitation, supporting documents and applicable amendments, if any will be provided. To receive the entire solicitation package and any applicable amendments, prospective offerors must download them from the FedBizOpps website, www.fbo.gov. The contractor shall provide all management and project administration services, quality control, logistical support, vehicles, labor, equipment and materials to complete the project on time and on schedule. The intent of this contract is to provide for the replacement of the lower and middle Jackson Creek culverts. This will include but is not limited to traffic control monitoring; furnish and install the new culverts; furnish and install backfill for the culverts; furnish all sub-grade material for raising of the road grade; furnish and place aggregate to final road grade; seed and mulch all disturbed areas; and protect Jackson Creek and associated wetlands from siltation and other destructive impacts of construction. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for costs associated with providing information in response to this synopsis, the pending solicitation or any follow-up information requests. The full solicitation package will be available on or about April 8, 2016.
Attachments
| File | Type | Posted |
|---|---|---|
| SF_30_amend_3.pdf | ||
| Pre-bid_notes.pdf | ||
| SF_30_amend_2.pdf | ||
| Heavy_WD.pdf | ||
| 2015FSSS_amend_1.docx | DOCX document | |
| SF_30_amend_1.pdf | ||
| 100_Percent_Jackson_Creek_Plans_Final_amend_1.pdf | ||
| Solicitation_package.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity