J045--emergency chiller repair compressor replacement

Awarded Limited / Sole Source Justification Posted

Solicitation number
36C24524P0721
Agency
Veterans Integrated Service Network 5 Veterans Health Administration, Department of Veterans Affairs
Set-aside
No set-aside

Opportunity facts

Contract number
36C24524P0721-36C24524P0721 Federal contract award
NAICS code
811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
PSC
J045 Maint/Repair/Rebuild Of Equipment- Plumbing, Heating, And Waste Disposal Equipment
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

This Limited / Sole Source Justification Notice is for the replacement of a McQuay compressor in a Core Lab DX unit at the Department of Veterans Affairs, VISN 05, DCVA Medical Center. The medical center's package chiller unit suffered a mechanical failure, shutting down the unit, which is critical for patient care. The contracting officer determined this was a sole source procurement, as the medical center uses a unique package chiller system. The contract was awarded to C.R.W. MECHANICAL, INC. for $25,511.00 on June 25, 2024 to restore the critical lab function.

Notice text

1. Contracting Activity:Â Â Department of Veterans Affairs, VISN 05, DCVA Medical Center.

2. Brief Description of Supplies/ Services required and the intended use/Estimated Amount:Â Â Replace McQuay Compressor in Core Lab DX m/n ACZ0258S/12 FT10 s/n STNU130500046 Cost: $25,511.00

3. Unique characteristics that limit availability to only one source, with the reason no other supplies or services can be used: The Washington DC VA Medical Center uses a package Chiller Unit for the production of Cooling in the CORE Lab. On June 24, 2024, at 0530 the CORE Lab DX Unit suffered a Mechanical failure that shut the unit down.

4. Description of market research conducted and results or statement why it was not conducted:Â Â Lab is critical to the facility when diagnosing illnesses for patient care. At this time the temperature in the space is above the threshold that the machinery cannot operate effectively. Without the Lab in operation it would cause a work stoppage in diagnosing patient illnesses. The VA Medical Center is finalizing a design build project to expand the capacity of the Chiller Plant and all sporting equipment to add redundancy to the existing distribution.

5. Contracting Officer's Certification: Purchase is approved in accordance with FAR13.106 1(b). I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.  Awarded contract 36C24524P0721 to C.R.W. MECHANICAL, INC. for 25511.00000000 on 2024-06-25.

Attachments

Files attached to this notice, newest first
File Type Posted
36C24524P0721_1.docx DOCX document

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity