J041--Joliet VFD Replacement pumps

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C25224Q0455
Agency
Veterans Integrated Service Network 12 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
J041 Maint/Repair/Rebuild Of Equipment- Refrigeration, Air Conditioning, And Air Circulating Equipment
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 12 is seeking a contractor to replace the VFDs, boiler feedwater pumps, and install new condensate pumps at the Joliet VA Community-Based Outpatient Clinic (CBOC). The contractor will be required to provide all necessary equipment, management, labor, safety, travel, tools, materials, and supplies to complete the project. Key requirements include installing 3 condensate pumps, 3 boiler feedwater pumps, and replacing 5 VFDs while adhering to various codes, standards, and certifications. The period of performance is approximately 180 days from the time of award. Quotes are due by May 3, 2024 at 1:00 pm CDT.

This solicitation is not set aside for any specific small business program. There are no incumbent contractors named. The government intends to award a firm-fixed price contract, but no specific budget range or award value is provided. The place of performance is the Joliet VA CBOC.

Notice text

2 versions

Update #2 · Latest ·

Questions for Solicitation 36C25224Q0455 VFD replacements

Question # 01:

Please confirm the scope of work includes the sequencer panel. During site visit it was alluded to that the sequencer panel was already scheduled to be replaced under a separate solicitation.

Answer: The sequencer is not needed and shall not be part of the Scope of Work 2) e).

Question #2:

We need a small clarification on the work package. It s the wording of a para at Statement of Work Chapter which is not making sense.

Please see Para 2 (b) (Scope of Work) at Page 7 of the word file -Â

b)Â Â Â Â Contractor shall flow meters for Makeup Water usage and Condensate Return must remain and be installed in new panel.

Answer: Contractor shall Keep flow meters for Makeup Water usage and Condensate Return must remain and be installed in the new panel.

Update #1 ·

The goal of this project is to provide all the necessary equipment, management, labor, safety, travel, tools, materials, and supplies to replace the existing VFDs, boiler feedwater pumps, and the addition of new condensate pumps at the Joliet VA CBOC

Attachments

Files attached to this notice, newest first
File Type Posted
36C25224Q0455 0001.docx DOCX document
36C25224Q0455_1.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
J041--Joliet VFD Replacement pumps Award Award Notice
J041--Joliet VFD Replacement pumps This notice · Latest solicitation Solicitation
J041--Joliet VFD Replacement pumps Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity