Instrumentation Equipment Rack System 2020 (IERS 2. 0)
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N68335-20-R-0224
- Agency
- Naval Air Warfare Center Naval Air Systems Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 332313 Plate Work Manufacturing
- PSC
- 6640 Laboratory Equipment And Supplies
- Place of performance
- Lakehurst NJ 08733 USA
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
The Naval Air Systems Command (NAVAIR), Lakehurst, NJ has a requirement to procure three (3) Electo-magnetic-interference (EMI) hardened Instrumentation Equipment Rack Systems 2020 (IERS 2.0) through competition on a Fixed Price basis, in accordance with the attached Statement of Work (SOW). The resultant contract will have a six (6) month delivery from the date of contract. The Government intends to procure the above items through full and open competition.
(i) THIS IS A COMBINED SYNOPSIS/SOLICITATION for Commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) This solicitation number is N68335-20-R-0224 (iii) The solicitation and incorporated provisions and clauses are in effect through Federal Acquisition Circular 2005-95. (iv) This solicitation is open to all businesses. NAICS is 332313. FSC code is 6640 (v) FAR 52.212-1 Instructions to Offerors – Commercial Items, is incorporated. (vi) Offerors shall include a completed copy of the provision at FAR 52.212-3, Offeror Representations and Certifications - Commercial Items with its offer. (vii) FAR 52.212-4, Contract Terms and Conditions - Commercial Items is incorporated. The resulting contract will have a six (6) month delivery date from the date of the contract (viii) FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders –Commercial Items is incorporated in this contract by full text; the following provisions apply: 52.222-50, Combating Trafficking in Persons (Mar 2015). (ix) Additional clauses and provisions and requirements:
52.204-13
System for Award Management Maintenance
OCT 2016
52.227-1
Authorization and Consent
DEC 2007
252.204-7004
System for Award Management
FEB 2014
252.204-7012
Safeguarding Covered Defense Information and Cyber Incident Reporting
OCT 2016
252.225-7001
Buy American And Balance Of Payments Program-- Basic (Dec 2016)
DEC 2016
252.225-7008
Restriction on Acquisition of Specialty Metals
MAR 2013
252.225-7009
Restriction on Acquisition of Certain Articles Containing Specialty Metals
OCT 2014
252.225-7012
Preference For Certain Domestic Commodities
DEC 2016
252.246-7007
Contractor Counterfeit Electronic Part Detection and Avoidance System
AUG 2016
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.211-7003
Item Unique Identification And Valuation
MAR 2016
Additional requirements: Quotes are due by 11:00am EST, 27 November 2020 to Devin Hader at devin.hader@navy.mil . Please see attachments for Submission and Evaluation Instructions, and the Statement of Work (SOW) (x) Name and telephone number of individual to contact for information regarding the solicitation: Devin Hader, 732-323-2741 e-mail: devin.hader@navy.mil. Hard copies of this Combined Synopsis/Solicitation and Amendments will NOT be mailed to the contractors. The Government will accept only electronic proposals.
MODIFICATION P00001- 16 November 2020, 11:15am
The purpose of this modification is to provide the following answers to submitted questions. The Governments responses are below.
1. Initial electro-magnetic effects analysis and modeling show the IERS
1.0 design will not meet the 100dB NSA specification based on the number of
rack penetrations, present cooling implementation and suggested materials
specified in the SOW.
a. Did the IERS 1.0 meet the NSA specification? If so, are there test
results that can be shared or was it "designed-to-meet"?
Response: Due to the time crunch we were under, we had to go with modeling and prior
experience from a specific vendor who had done similar equipment racks
previously and had test data showing they could meet the requirements. The
vendor provided data showing ability to comply and previous experience but
were not required to demonstrate. For example, the SS construction of a
specific gauge, honeycomb filters, proper EMI gaskets at all gaps and
connectors, unfinished surfaces to improve continuity between SS and EMI
gaskets, etc were used and were proven methods.
b. Does the Government expect qualification of IERS 2.0 (with equipment
populated) through testing or is modeling and analyses acceptable?
Response: Modeling and analyses are acceptable as long as the vendor can show previous
experience and test results from previous similar efforts. IERS 1.0 did
prove to be satisfactory and we had no trouble with EMI concerns. It
remains in use today.
2. What is the Government's expected delivery schedule?
Response: June 2021.
3. It is suggested that IERS 2.0 will be installed in a maritime
operational environment. Are there climatic requirements (Salt Fog,
Humidity, Temperature, etc.) beyond electro-magnetic as described in the
SOW?
Response: Vibration, shock and temperature are all nominal as IERS is
installed within the ship. No Salt or humidity issues as space is normally
air conditioned to protect the other gear in that space. The IERS 1.0 is
very heavy and well-built and has held up perfectly. The IERS 2.0 is
basically implementation of things we wish we had done differently (access
doors on the rear, connectors on the top), and not from a ruggedness or EMI
perspective.
4. Can the Government share the parts list (including OEM part number)
for the equipment intended to be installed into IERS 2.0 to properly specify
cooling fan(s), slide mounts and connectors?
Response: Yes. Generally, National Instruments DAQ HW, Precision Filters Signal Conditioning, Agilent
meters, UPS, Network switches, power supplies and PDU.
5. It is assumed that the cable harnesses connecting to IERS 2.0
provide the same level of protection as the rack.
Response: All cabling is ship qualified LS cabling with double shielding. Best practices are used to
build the cables. All connectors are EMI gasket shielded 38999 Series III.
a. Who is responsible for fabricating and providing these cable
harnesses?
Response: Most cables are built in house including fiber which
is built by Navy.
b. If the Contractor is responsible, are there any restrictions to
consider for the cable harnesses (size, weight, color, etc.)
Response: contractor not responsible.
Update #1 ·
The Naval Air Systems Command (NAVAIR), Lakehurst, NJ has a requirement to procure three (3) Electo-magnetic-interference (EMI) hardened Instrumentation Equipment Rack Systems 2020 (IERS 2.0) through competition on a Fixed Price basis, in accordance with the attached Statement of Work (SOW). The resultant contract will have a six (6) month delivery from the date of contract. The Government intends to procure the above items through full and open competition.
(i) THIS IS A COMBINED SYNOPSIS/SOLICITATION for Commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) This solicitation number is N68335-20-R-0224 (iii) The solicitation and incorporated provisions and clauses are in effect through Federal Acquisition Circular 2005-95. (iv) This solicitation is open to all businesses. NAICS is 332313. FSC code is 6640 (v) FAR 52.212-1 Instructions to Offerors – Commercial Items, is incorporated. (vi) Offerors shall include a completed copy of the provision at FAR 52.212-3, Offeror Representations and Certifications - Commercial Items with its offer. (vii) FAR 52.212-4, Contract Terms and Conditions - Commercial Items is incorporated. The resulting contract will have a six (6) month delivery date from the date of the contract (viii) FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders –Commercial Items is incorporated in this contract by full text; the following provisions apply: 52.222-50, Combating Trafficking in Persons (Mar 2015). (ix) Additional clauses and provisions and requirements:
52.204-13
System for Award Management Maintenance
OCT 2016
52.227-1
Authorization and Consent
DEC 2007
252.204-7004
System for Award Management
FEB 2014
252.204-7012
Safeguarding Covered Defense Information and Cyber Incident Reporting
OCT 2016
252.225-7001
Buy American And Balance Of Payments Program-- Basic (Dec 2016)
DEC 2016
252.225-7008
Restriction on Acquisition of Specialty Metals
MAR 2013
252.225-7009
Restriction on Acquisition of Certain Articles Containing Specialty Metals
OCT 2014
252.225-7012
Preference For Certain Domestic Commodities
DEC 2016
252.246-7007
Contractor Counterfeit Electronic Part Detection and Avoidance System
AUG 2016
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.211-7003
Item Unique Identification And Valuation
MAR 2016
Additional requirements: Quotes are due by 11:00am EST, 27 November 2020 to Devin Hader at devin.hader@navy.mil . Please see attachments for Submission and Evaluation Instructions, and the Statement of Work (SOW) (x) Name and telephone number of individual to contact for information regarding the solicitation: Devin Hader, 732-323-2741 e-mail: devin.hader@navy.mil. Hard copies of this Combined Synopsis/Solicitation and Amendments will NOT be mailed to the contractors. The Government will accept only electronic proposals.
Attachments
| File | Type | Posted |
|---|---|---|
| SOW IERS 2020 RFI.pdf | ||
| Submission and Evaluation Instructions.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Instrumentation Equipment Rack System 2020 (IERS 2. 0) | Award Notice | |
| Instrumentation Equipment Rack System 2020 (IERS 2. 0) | Solicitation | |
| Electo-magnetic-interference (EMI) hardened Instrumentation Equipment Rack System 2020 (IERS 2. 0) | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity