HVAC Replacement - Redmond Air Center
Awarded Award Notice Posted
- Solicitation number
- 1204T019Q0056
- Agency
- Region 6 - Pacific Northwest Region Forest Service, Department of Agriculture
- Awarded
- to BC Mechanical, LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 1204T019P0035 Federal contract award
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- Not on record
- Place of performance
- Redmond Air Center, Deschutes National Forest Redmond, Oregon 97556, United States
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
Awarded Vendors: BC Mechanical, LLC. Contract Award Dollar Amount: $94,518.90. Contract Award Date: 2019-07-11.
Update #3 ·
06/24/2019 Update: Amendment #1 has been posted .
There is a change in estimated start work date. Additionally, date and time for receipt of offers has been extended.
.
Update #2 ·
June 6, 2019: Uploading all solicitation documents.
.
Update #1 ·
*** THE FULL SOLICITATION ESTIMATED ISSUE DATE: Electronically in Federal Business Opportunities on or about June 10, 2019. ***
The US Forest Service, Region 6, Deschutes National Forest has a requirement to replace the existing HVAC system at the Redmond Air Center (RAC) Air Tanker Base and Paraloft building (Deschutes County, Oregon).
Work includes: (1) the removal and disposal of the existing HVAC system, including, but not limited to: heating and AC units, water piping, ducting, and associated components. Some of the existing HVAC components are to remain to be reintegrated into the new system; (2) the installation of a new HVAC system, including, but not limited to: furnaces, condensing units, exhaust fans, ductwork, gas piping, make up air unit, and controls. Electrical work will be required to complete the installation of the HVAC system.
The Air Tanker Base building is a single story 3,750 square foot building, which is primarily administration and operations space with several small offices, conference room, kitchen, and bunkroom. The building is heated with a LP gas-fired furnace and cooled with central AC units. There are two furnace units, one with 8 zone dampers and the other with 6 zone dampers. This requirement is to replace the 14 zone dampers with 2 zones per unit. The IT room will be removed from the main forced air unit and replaced with a new ductless heat pump system.
Project Location: Redmond Air Center (near the Redmond, OR airport), 1740 SE Ochoco Way, Redmond, OR 97756
The Government's estimate is between $25,000 and $100,000. A payment bond (100 percent) will be required after award. Contract performance time of 45 calendar days is estimated to begin on July 15, 2019. The project is 100% set aside for Small Business concerns.
Note: prospective awardee shall be registered and active in the System for Award Management (SAM) data base prior to award. Information on registration may be obtained via the internet at: http://www.sam.gov All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system.
.
Attachments
| File | Type | Posted |
|---|---|---|
| Amendment1-1204T019Q0056.pdf | ||
| 3_-_HVAC_Specifications_-_1204T019Q0056.pdf | ||
| 4_-_HVAC_Drawing_ATB_-_1204T019Q0056.pdf | ||
| 1_-_Solicitation_Packet_-_1204T019Q0056.pdf | ||
| 6_-_Wage_Determination_-_1204T019Q0056.pdf | ||
| 2_-_Contractor_Return_Packet_-_1204T019Q0056.pdf | ||
| 5_-_HVAC_Drawing_Paraloft_-_1204T019Q0056.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity