Hammil Meadows Restoration Project

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
129JGP18Q0098
Agency
Region 5 - Pacific Southwest Region Forest Service, Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

Contract number
129JGP18C0078 Federal contract award
NAICS code
115310 Support Activities for Forestry
PSC
Not on record
Place of performance
#1Pincrest Lake Road Pinecrest, California 95364, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Added: Jun 27, 2018 5:43 pm Modified: Jul 17, 2018 6:45 pmTrack Changes ADD Solicitation, attachments and exhibits 6/27/2018
Extend July 17, 2018.  New response date 7/23/2018 4:00 p.m.

Update #2 ·

Added: Jun 27, 2018 5:43 pm ADD Solicitation, attachments and exhibits 6/27/2018

Update #1 ·

Added: Jun 22, 2018 1:28 pm

The Stanislaus National Forest, Summit Ranger District, intends to award a firm fixed price contract for services to stabilize and/or restore hydrologic function in five meadows.

Description of Work: The hydrologic function of these meadows, Bloomer Lake, Bluff, Groundhog, Middle Three, and Upper Three Meadows, is either degraded by headcuts and gullying or threatened by headcuts. Stabilization of headcuts involves placing boulders, cobbles, gravels, and soil in the headcut to prevent future erosion. Treatment of gullying involves: (1) filling gullied sections of stream channels with soil to raise the stream bed, reshaping the stream channel and placing rock in certain locations along stream channel for stability, (2) complete filling of gullied sections of stream channel with soil and rerouting flow to previously abandoned stream channels, or (3) sloping back stream banks to a stable angle. Associated restoration tasks include collection of rock and fill materials, collection and replanting of vegetation, spreading wood straw in disturbed areas, dewatering of stream channels to protect water quality during construction activities, and temporary access route restoration.

Location: The project is located on Stanislaus National Forest, Summit Ranger District.

Starting from Sonora, drive east on Highway 108. Turn right (east) onto Herring Creek Road (4N12). Continue 6.8 miles until Herring Creek Road forks. Turn right (southeast). Bluff Meadow is located on the right 3.5 miles past the fork. At 4.5 miles past the fork, turn right onto FS road 5N67 to access Middle and Upper Three Meadows. These meadows are located on the right 0.4 and 0.5 miles, respectively, up FS road 5N67. To reach Groundhog Meadow, continue on Herring Creek Road 1.5 miles past the intersection with 5N67 and turn right (east) onto FS motorized trail 19DC189. Bloomer Lake can be accessed by FS road 4N12L near the intersection of FS road 4N12. This intersection is located 1 mile past Groundhog Meadow.

Site visit is schedule for July 12, 2018, 9:00p.m., at Summit Ranger Station.  #1 Pinecrest Lake Road, Pinecrest, CA.

Total Small Business Set Aside
Estimated Start date is Aug 15, 2018
Estimated date for solicitation posting is 6/26/2018.

Attachments

Files attached to this notice, newest first
File Type Posted
Amendment_3.pdf PDF
Amendment_1.pdf PDF
Exhibit_D.pdf PDF
Exhibit_E.pdf PDF
Hammil_Medows_Restoration_Project_Solicitation.pdf PDF
Exhibit_B.pdf PDF
Exhibit_A.pdf PDF
Exhibit_C.pdf PDF
Exhibit_F.pdf PDF
Exhibit_G.pdf PDF
Attachment_3.pdf PDF
Attachment_2.pdf PDF
Show all 12

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Hammil Meadows Restoration Project Award Award Notice
Hammil Meadows Restoration Project This notice · Latest pre-solicitation Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity