1.0 INTRODUCTION

The St. Louis VA Medical Center (John Cochran) requires services to perform maintenance on the fire pump and fire sprinkler system as required by the NFPA 25 standard.

Service work to the fire pump and sprinkler system must be completed in accordance with the following:

NFPA 25; Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems

NFPA 13; Installation of Sprinkler Systems

NFPA 20; Installation of Stationary Pumps for Fire Protection

The John Cochran, located at 915North, Grand Blvd. St. Louis MO, is protected by an existing fire sprinkler system with a fire pump. The sprinkler system includes a 500 gpm pump details below. This quote should be for a Base plus 4 years.

2.0 OBJECTIVES

The purpose of this scope of work is to define the requirements for the maintenance tasks associated with the wet fire protection system. The intent of this Task Order is to fully service and maintain operation of the John Cochran sprinkler system. Work shall be done in accordance with the project SOW, specifications and be compliant with referenced codes.

Let Pipe Shop know when work is completed so electric shop can restore full monitoring of fire sprinkler functions at fire detection/alarm panel.

The serviced fire sprinkler system shall operate in accordance with NFPA 13, 25 and 20 as well as the original design intent at installation.

3.0 GENERAL REQUIREMENTS

The Contractor shall provide all repair services necessary to meet objectives shown in 2.0 above.

All flow tests are to be performed at system designated test points/valves.

SPRINKLER/STANDPIPE SYSTEM MAINTENANCE REQUIREMENT CHART:

Device Monthly Semi-annual Annual 5 Year Test

All fire system valves including hydrants & yard sectional valves

Exercise

Exercise

GPM Flow Test on Hydrants

Done in April

Main Drain Gauges in stairwells

Inspect

5.3.2.1 Gauges shall be replaced every 5 years or tested every

5 years by comparison with a calibrated gauge.

Sprinkler heads

Inspect

Main Drain: control assembly or valve

Flow Test; record static and residual Pressures and time for recovery. Give reports

Done in April

Backflow Preventer Testing

Test Backflow Devices and give reports

Done in October

Standpipe hose valves

13.5.6.2.1* Class I and Class III standpipe system hose valves

shall be tested annually by fully opening and closing the valves. Record pressure and document

Done in April

Antifreeze solution systems

Specific gravity

The specific gravity of

each solution shall be checked using

a hydrometer with a

suitable scale or a refractometer

having a scale calibrated

for the antifreeze solution.

Give reports

Done in October

Device Monthly Semi-annual Annual 5 Year Test

Fire Department Connections

The piping from the fire department connection to

the fire department check valve shall be hydrostatically tested

at 150 psi (10 bar) for 2 hours at least once every 5 years

Riser Flow Test

6.3.1 Flow Tests.

6.3.1.1* A flow test shall be conducted every 5 years on all Class

I and Class III standpipe systems to verify that the required

flow and pressure are available at the hydraulically most remote

hose valve outlet(s) while flowing the standpipe system

demand.

Last test done Sept 3 2015

There are two Hydrants on station located behind building one.

Main Drain Standpipe risers are located in eleven stairwells.

There are ten Fire Suppression Backflow preventers located throughout facility.

Seventy nine Standpipe Hose valves located throughout stairwells.

Antifreeze solution systems on station.

There are six Fire Dept. Connections on station.

ELECTRIC FIRE PUMP MAINTENANCE REQUIREMENT CHART:

Device Annual

Fire Pump (pressure start)

Flow Test, Plot Curve Points

Coupling alignment

Inspect

Lubricate pump bearings

X

Operate manual start

Flow Test

Start on

emergency power

Exercise

Start/stop pressure setting

Inspect

Gauges on Fire Pump

Inspect(replace

or recalibrate when

5% out of

calibration)

The Contractor shall provide all tools necessary to perform the work as specified in this SOW

The contractor shall be responsible for removal and replacement of all ceiling tiles affected by the work. Contractor shall dispose of any unused pipe, excess materials or other construction debris.

Qualified Mechanic. Contractor personnel conducting sprinkler and fire alarm system work and/or testing shall be qualified and experienced in accordance with Section 4.3.3 of NFPA 25; Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems.

Acceptance of Work. The Contractor shall provide all documentation of required testing of work was approved and accepted by the POC John Cochran Medical Center. The contractor must submit validation that work was completed satisfactorily with request for payment.

The Contractor shall coordinate all work and testing of systems with the Pipe Shop Foreman at Medical Center.

SPECIFIC REQUIREMENTS

4.1 System Checks:

No visible water leaks or standing water (clogged drains).

Record all test data, static pressures, residual pressures

Fire pump test shall not activate general alarm (denotes system pressure problems).

Jockey pump stop pressure shall be equal to or higher than fire pump churn (zero flow) pressure. Jockey pump run cycles should be no more than 10 runs within a 24hr period.

Required Timing of Tests / Inspections

5.1

Tests / Inspections

Complete By

Allowance

Contract Year

Main Drain Riser Test

4/13/2022

+ or 14 Days

Base

Fire Pump Test

4/13/2022

+ or 14 Days

Base

Hydrant Flow Test

4/13/2022

+ or 14 Days

Base

Fire Department Connections

4/13/2022

+ or 14 Days

Base

Main Drain Gauges in stairwells

4/13/2022

+ or 14 Days

Base

Replace Main Drain Gauges (5 Year)

4/13/2022

+ or 14 Days

Base

Close Cycle Valves

4/28/2022

+ or 14 Days

Base

Fire Department Connection / Hydrostatic Test (5 year)

4/28/2022

+ or 14 Days

Base

FS Backflows

10/3/2022

+ or 14 Days

Base

Antifreeze Systems

10/3/2022

+ or 14 Days

Base

Main Drain Riser Test

4/2023

+ or 14 Days

Option Year 1

Fire Pump Test

4/2023

+ or 14 Days

Option Year 1

Hydrant Flow Test

4/2023

+ or 14 Days

Option Year 1

Fire Department Connections

4/2023

+ or 14 Days

Option Year 1

Main Drain Gauges in stairwells

4/2023

+ or 14 Days

Option Year 1

Close Cycle Valves

4/2023

+ or 14 Days

Option Year 1

FS Backflows

10/2023

+ or 14 Days

Option Year 1

Antifreeze Systems

10/2023

+ or 14 Days

Option Year 1

Main Drain Riser Test

4/2024

+ or 14 Days

Option Year 2

Fire Pump Test

4/2024

+ or 14 Days

Option Year 2

Hydrant Flow Test

4/2024

+ or 14 Days

Option Year 2

Fire Department Connections

4/2024

+ or 14 Days

Option Year 2

Main Drain Gauges in stairwells

4/2024

+ or 14 Days

Option Year 2

Close Cycle Valves

4/2024

+ or 14 Days

Option Year 2

FS Backflows

10/2024

+ or 14 Days

Option Year 2

Antifreeze Systems

10/2024

+ or 14 Days

Option Year 2

Main Drain Riser Test

4/2025

+ or 14 Days

Option Year 3

Fire Pump Test

4/2025

+ or 14 Days

Option Year 3

Hydrant Flow Test

4/2025

+ or 14 Days

Option Year 3

Fire Department Connections

4/2025

+ or 14 Days

Option Year 3

Main Drain Gauges in stairwells

4/2025

+ or 14 Days

Option Year 3

Close Cycle Valves

4/2025

+ or 14 Days

Option Year 3

5 Year Riser Flow Test ( 5 Year)

9/3/2025

+ or 14 Days

Option Year 3

FS Backflows

10/2025

+ or 14 Days

Option Year 3

Antifreeze Systems

10/2025

+ or 14 Days

Option Year 3

Main Drain Riser Test

4/2026

+ or 14 Days

Option Year 4

Fire Pump Test

4/2026

+ or 14 Days

Option Year 4

Hydrant Flow Test

4/2026

+ or 14 Days

Option Year 4

Fire Department Connections

4/2026

+ or 14 Days

Option Year 4

Main Drain Gauges in stairwells

4/2026

+ or 14 Days

Option Year 4

Close Cycle Valves

4/2026

+ or 14 Days

Option Year 4

FS Backflows

10/2026

+ or 14 Days

Option Year 4

Antifreeze Systems

10/2026

+ or 14 Days

Option Year 4

6.0 COR at Location

All questions concerning the scope and requirements of the VA Medical Center, shall be directed to the COR (see below):

COR

Michael Stogsdill

michael.stogsdill1@va.gov

Tel: 314-289-6450

Cell: 314-858-0269

The Pipe Shop Foreman (COR) will be the contractor s contact at the John Cochran VA Medical Center. The POC will assist and direct the contractor when scheduling inspections. All questions concerning coordination of installation activities while at medical center shall be directed to the Pipe Shop Foreman.

END OF STATEMENT OF WORK

Attachments

Files attached to this notice, newest first
File Type Posted
36C25521Q0556.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
H112--Fire Suppression Testing, STL This notice · Latest solicitation Solicitation
H112--Fire Suppression Testing, STL Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity