Grey Eagle Trail Bridge Repairs
Awarded Award Notice Posted
- Solicitation number
- AG-9A63-S-13-0184
- Agency
- Region 5 - Pacific Southwest Region Forest Service, Department of Agriculture
- Awarded
- to Sierra Engineers
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-9A63-C-13-0119 Federal contract award
- NAICS code
- 238110 Poured Concrete Foundation and Structure Contractors
- PSC
- Not on record
- Place of performance
- Beckwourth Ranger District. Plumas NF. The project is located adjacent to the Gold Lake Highway (PC 519). The site is reached by traveling one mile south from Graeagle, CA to Plumas County road 519, then south on PC 519 five miles to the trailhead. An staging area is located two-hundred feet south of the trailhead. GPS Location: 39 44.720' N, 120 38.613' W Blairsden, California 96103, United States
Notice details come from SAM.gov. Updated .
Notice text
Added: Aug 30, 2013 3:51 pm
The Plumas National Forest requires contractors to repair the east foundation of the Grey Eagle Trail Bridge. Work consists of minor excavation, repositioning the wood crib footing, and pouring a reinforced concrete foundation under the existing crib.
The project is located adjacent to the Gold Lake Highway (PC 519). The site is reached by traveling one mile south from Graeagle, CA to Plumas County road 519, then south on PC 519 five miles to the trailhead. An staging area is located two-hundred feet south of the trailhead.
GPS Location: 39° 44.720' N, 120° 38.613' W
This project is estimated at less than $25,000.
Set Aside for Total Small Business
NAICS 238110
RESPONSE DATE: 11 September 2013.
START WORK: 20 September 2013
Site Visit scheduled for 4 September 2013. 10:00 a.m. at site location above
Attachments
| File | Type | Posted |
|---|---|---|
| Amendment_5.doc | DOC document | |
| New_Schedule_B.docx | DOCX document | |
| Diagram_bearing_plate_Amendment_4.pdf | ||
| Amendment_4.doc | DOC document | |
| Amendment_3.doc | DOC document | |
| getb_Q A.pdf | ||
| Amendment_2 1 .doc | DOC document | |
| New_Schedule_B.docx | DOCX document | |
| diagram_of_bearing_plate_and_bridge.pdf | ||
| Amendment_1.doc | DOC document | |
| Solicitation_Gray_Eagle.docx | DOCX document | |
| Attachment_2_Specifications.pdf | ||
| Attachment_5_Fire_Plan_PAL_080212 1 .doc | DOC document | |
| Attachment_3_Drawings_.pdf | ||
| Attachment_4_Wage_Grade_Determination.pdf |
Show all 15
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity