Façade Stabilization, TMFJB, Wash DC

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
AOCACB23R0005
Agency
Architect of the Capitol
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2JZ Repair Or Alteration Of Miscellaneous Buildings
Place of performance
Washington, District of Columbia 20544, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Publishing Pre-Proposal Site Visit Attendee List

AMENDMENT 01 (02/02/2023) - Pre-proposal site visit details (see attached amendment 01 for details)

The following work is the primary focus of the project and will be performed across the entire buildings stone panel

façade assembly.

Remove and replace all sealant in joints that have granite façade panels as a substrate (i.e., stone-to-stone joints

and stone to window joints) and remove and replace weeps at existing through-wall flashing locations, in

conjunction with the sealant work. Joints between granite facade panels and the atrium skylight framing are

excluded from the scope of this project.

Address existing frontside granite panel damage to maintain and provide a consistent watertight enclosure across

the stone panel façade.

Remove and replace existing façade stabilization netting to enable sealant joint replacement and the other façade

work of this project and maintain or replace existing netting anchors.

The Contractor shall provide all supervision, plant, labor, materials, tools, and equipment, to carry out all work and

operations as necessary. All work shall be completed in accordance with all federal, state, District and local laws

and regulations.

Update #2 ·

AMENDMENT 01 (02/02/2023) - Pre-proposal site visit details (see attached amendment 01 for details)

The following work is the primary focus of the project and will be performed across the entire buildings stone panel

façade assembly.

Remove and replace all sealant in joints that have granite façade panels as a substrate (i.e., stone-to-stone joints

and stone to window joints) and remove and replace weeps at existing through-wall flashing locations, in

conjunction with the sealant work. Joints between granite facade panels and the atrium skylight framing are

excluded from the scope of this project.

Address existing frontside granite panel damage to maintain and provide a consistent watertight enclosure across

the stone panel façade.

Remove and replace existing façade stabilization netting to enable sealant joint replacement and the other façade

work of this project and maintain or replace existing netting anchors.

The Contractor shall provide all supervision, plant, labor, materials, tools, and equipment, to carry out all work and

operations as necessary. All work shall be completed in accordance with all federal, state, District and local laws

and regulations.

Update #1 ·

The following work is the primary focus of the project and will be performed across the entire buildings stone panel

façade assembly.

Remove and replace all sealant in joints that have granite façade panels as a substrate (i.e., stone-to-stone joints

and stone to window joints) and remove and replace weeps at existing through-wall flashing locations, in

conjunction with the sealant work. Joints between granite facade panels and the atrium skylight framing are

excluded from the scope of this project.

Address existing frontside granite panel damage to maintain and provide a consistent watertight enclosure across

the stone panel façade.

Remove and replace existing façade stabilization netting to enable sealant joint replacement and the other façade

work of this project and maintain or replace existing netting anchors.

The Contractor shall provide all supervision, plant, labor, materials, tools, and equipment, to carry out all work and

operations as necessary. All work shall be completed in accordance with all federal, state, District and local laws

and regulations.

Attachments

Files attached to this notice, newest first
File Type Posted
Pre-Proposal Site Visit Attendee List.pdf PDF
Amd01 AOCACB23R0005 preproposal site visit details.pdf PDF
AOCACB23R0005 Facade Stabilization TMFJB.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
AOCACB23R0005 Facade Stabilization, TMFJB, Wash DC Award Award Notice
Façade Stabilization, TMFJB, Wash DC This notice · Latest solicitation Solicitation
Façade Stabilization, TMFJB, Wash DC Pre-Solicitation
Façade Stabilization, TMFJB, Wash DC Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity