F108 Module 14 Low Pressure Turbine Assembly Navy Requirement
Awarded Award Notice Posted
- Solicitation number
- FA812216R0018
- Agency
- AFLCMC Tinker AFB Lifecycle Management Center, Department of Defense
- Awarded
- to Chromalloy Component Services Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- FA8122-17-D-0010 Federal IDV award
- NAICS code
- 336412 Aircraft Engine and Engine Parts Manufacturing
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
8 versions
Update #8 · Latest ·
Added: Jul 11, 2017 1:50 pm
The purpose of this amendment is to answer questions concerning solicitation FA8122-16-R-0018, Amendment 0003, amend the CLIN structure, correct page 4 line 3 of original solicitation FA8122-16-R-0018 and extend the closing date of the solicitation.
FIRST: Questions and Answers for FA8122-16-R-0018-0003 Navy Module 14
Q1. Does the Government still anticipate modifying the solicitation Statement of Work (SOW) to address industry concerns about an unrealistic 21 day TAT.
A1. No. If in the course of attempting to meet the 21 day TAT, it becomes clear that the vendor cannot meet this TAT, then the vendor can request an extension. The 13/15 is allowed a 60 day TAT because it is more complex and requires far more work.
Q2. Does the Government anticipate the use of commercial Used Serviceable Material (USM)? As previously discussed, a 60 day TAT would be consistent with Mod 13/15 contract requirement. Also, the use of commercial Used Serviceable Material (USM) would provide considerable cost savings without impact to engine performance (as was allowed by the Mod 13/15 SOW).
A2. No. Used Serviceable Material (USM) is NOT allowed in repair of these modules. See SOW 3.1.
Q3 Does the Government require the replacement of #4 bearing during Level 1 Repair?
A3. Incoming #4 bearing P/Ns 305-355-718-0, 340-167-902-0, 335-352-303-0, 305-355-717-0 and 335-352-302-0, may be reused provided they pass all PWS/SOW stipulated inspection requirements. All other older configuration bearings must be replaced with new (ref SB 72-0507R01).
Q4. For clarity, all SB part numbers are viable - correct? We are not limited to the 3 each part numbers per the USAF requirements?
A4. See A3
Q5. Because of the way that Mod 14 mates up with Mod 13/15, will the US Navy consider amending SOW paragraph 3.1 to allow first run commercial USM if available?
A5. No.
Q6. Do we need to submit a hard copy of the Mod 14 proposal?
A6. Yes.
The response to Q3 raises a couple more questions.
Q7. Since we will not have access to engine records, would the US Navy allow for CLIN0001 to be modified to exclude the #4 BRG replacement since there is no way of knowing if this will be required 100% of the time?
A7. No.
Q8. Would it be possible to add another CLIN that covers the #4 BRG replacement (which would be consistent the CLINs for replacement of expensive Life Limited Parts where we also have no data or build history)?
A8. Yes. See CLIN structure in section B of solicitation amendment 0006 to reflect providing pricing for including replacement of #4 bearing. Example CLIN 0001AA is the repair price for Level I repair. CLIN 0001AB is for repair price for Level I repair including the price to replace #4 bearing. There is a separate price for Level I repair without #4 bearing being replaced and a separate price for Level I repair with #4 bearing being replaced.
SECOND: Amend CLIN structure see below in Section B.
Note: Ignore all previous CLIN structures.
THIRD: Solicitation FA8122-16-R-0018, page 4 line 3 is hereby corrected as follows:
FROM READ: The monthly quantity is 3/12, which is approximately .25 each. For option term of three (3) months the BEQ would be approximately .75 each or 1 each.
TO READ: The monthly quantity is 3/12, which is approximately .25 each. For option term of six (6) months the BEQ would be approximately 1.50 each or 1 each.
FOURTH: The closing date for proposals is hereby extended as follows:
FROM: 14 July 2017 at 3:00PM local time TO: 21 July 2017 at 3:00PM local time
FIFTH: All other tems and conditions remain unchanged.
Update #7 ·
Added: Jul 06, 2017 8:40 am
The purpose of this amendment is to extend the solicitation closing date due to receipt of offeror questions.
FIRST: The Government has received questions and needs the appropriate time to respond to each of them; as such the solicitation closing date is hereby extended as follows:
FROM: 7 July 2017 at 3:00PM local time TO: 14 July 2017 at 3:00PM local time.
SECOND: When the Government responds to the questions, the solicitation closing date will be re-adjusted based upon the actual posting of the amendment to reflect a new closing date of 5 business workdays beyond the posting of the new amendment.
All other terms and conditions remain unchanged.
Update #6 ·
Added: Jun 28, 2017 5:06 pm
The purpose of this amendment is to extend the solicitation closing date due to receipt of offeror questions.
FIRST: The Government has received questions and needs the appropriate time to respond to each of them; as such the solicitation closing date is hereby extended as follows:
FROM: 30 June 2017 at 3:00PM local time TO: 7 July 2017 at 3:00PM local time
SECOND: When the Government responds to the questions, the solicitation closing date will be re-adjusted based upon the actual posting of the amendment to reflect a new closing date of 5 business workdays beyond the posting of the new amendment.
All other terms and conditions remain unchanged.
Update #5 ·
Added: Jun 22, 2017 10:15 am
This amendment is to answer questions concerning solicitation FA8122-16-R-0018 and extend the closing date of the solicitation.
FIRST: Questions and Answers for FA8122-16-R-0018 Navy Module 14
Q1. Does the Government still anticipate modifying the solicitation Statement of Work (SOW) to address industry concerns about an unrealistic 21 day TAT.
A1. No. If in the course of attempting to meet the 21 day TAT, it becomes clear that the vendor cannot meet this TAT, then the vendor can request an extension. The 13/15 is allowed a 60 day TAT because it is more complex and requires far more work.
Q2. Does the Government anticipate the use of commercial Used Serviceable Material (USM)? As previously discussed, a 60 day TAT would be consistent with Mod 13/15 contract requirement. Also, the use of commercial Used Serviceable Material (USM) would provide considerable cost savings without impact to engine performance (as was allowed by the Mod 13/15 SOW).
A2. No. Used Serviceable Material (USM) is NOT allowed in repair of these modules. See SOW 3.1.
Q3 Does the Government require the replacement of #4 bearing during Level 1
Repair?
A3. Incoming #4 bearing P/Ns 305-355-718-0, 340-167-902-0, 335-352-303-0, 305-355-717-0 and 335-352-302-0, may be reused provided they pass all PWS/SOW stipulated inspection requirements. All other older configuration bearings must be replaced with new (ref SB 72-0507R01).
Q4. For clarity, all SB part numbers are viable - correct? We are not limited to the 3 each part numbers per the USAF requirements?
A4. See A3
Q5. Because of the way that Mod 14 mates up with Mod 13/15, will the US Navy consider amending SOW paragraph 3.1 to allow first run commercial USM if available?
A5. No.
Q6. Do we need to submit a hard copy of the Mod 14 proposal?
A6. Yes.
SECOND: The closing date for proposals has been extended to 30 June 2017 at 3:00PM Local Time
THIRD: All other terms and conditions remain unchanged.
Update #4 ·
Added: Jun 15, 2017 9:04 am
This amendment is to extend the solicitation closing date due to receipt of offeror questions and to correct item no. 0001, 1001 and 2001.
FIRST: The Government has received questions and needs the appropriate time to respond to each of them; as such the solicitation closing date is extended as follows:
FROM 16 June 2017, 3:00PM Local Time TO 23 June 2017, 3:00PM Local Time
SECOND: When the Government responds to the questions, the solicitation closing date will be re-adjusted based upon the actual posting of the amendment to reflect a new closing date of 5 business workdays beyond the posting of the new amendment.
THIRD: Item No. 0001, 1001 and 2001 are corrected as follows:
FROM READ: Level I Repair IAW PWS consist of Level I compliance and replacement of #4 bearing.
TO READ: Level I Repair IAW PWS consist of Level I compliance.
FOURTH: All other terms and conditions remain unchanged.
Update #3 ·
Added: May 26, 2017 1:45 pm
This amendment is to extend the solicitation closing date due to the receipt of offeror questions.
FIRST: The Government has received questions and needs the appropriate time to respond to each of them; as such the solicitation closing date is extended as follows:
FROM: 7 June 2017, 3:00PM Central Time TO: 16 June 2017, 3:00PM Central Time
SECOND: When the Government responds to the questions, the solicitation closing date will be re-adjusted based upon the actual posting of the Amendment to reflect a new closing date of 5 busines workdays beyond the posting of the new amendment.
All other terms and conditions remain unchanged.
Update #2 ·
Added: May 10, 2017 1:20 pm This is to make sure that solicitation FA8122-16-R-0018 is posted along with attachments to FedBizOps, due to system issues. This is also to identify the the closing date for proposals is 3PM local time 9 June 2017.
Update #1 ·
Added: Feb 07, 2017 9:50 am
This requirement is for the overhaul/repair of F108 Module 14 Low Pressure Turbine Assembly. The Government plans to award a 3-Year Indefinite Delivery/Indefinite Quantity type contract 1-One Year Basic Period and 2 One-Year Options. Award will be made only if the offeror, the product/service or the manufacturer meets qualification requirements in accordance with FAR 52.209-1. The qualification requirements is sited in each individual solicitation.
Attachments
| File | Type | Posted |
|---|---|---|
| GFP.pdf | ||
| FA812216R0018.pdf | ||
| CDRLREPORT.pdf | ||
| DataItemDescriptionCAVAF.pdf | ||
| PWS.pdf | ||
| PackagingRequirements.pdf | ||
| DataItemDescriptionDMR.pdf | ||
| DD13481A.pdf | ||
| DataItemDescriptionDR.pdf | ||
| TRNSPDATAREPORT.pdf | ||
| DataItemDescriptionSPD.pdf | ||
| TechnicalData.PDF | ||
| 2875SAAR.pdf | ||
| DataItemDescriptionCEMS.pdf |