Creek Fire Beasore Road Repairs
Closed Pre-Solicitation Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- 12363N23R4018
- Agency
- Forest Service Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Oakhurst, California, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This Pre-Solicitation Notice is for the Creek Fire Beasore Road Repairs project with the Department of Agriculture Forest Service. The solicitation will be posted on May 15, 2023 for repair work along 5.49 miles of Beasore Road including culvert cleaning and replacement, installation of corrugated metal piping, full depth reclamation, placement of base rock and asphalt paving. The engineering point of contact is Pablo Gonzalez and the project is estimated to begin on July 3, 2023. Bonds, a bid guarantee, and compliance with contract terms, specifications and provisions will be required.
The project is set aside 100% for small business concerns. The NAICS code is 237310 for Highway, Street, and Bridge Construction with a size standard of $45 million. The estimated value is between $5,000,000 to $10,000,000. The work location is in the Sierra National Forest near Oakhurst, California along Beasore Road from mile post 24.14 to 29.63.
Notice text
Synopsis
12363N23R4018
THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT MAY 15, 2023.
PROJECT DESCRIPTION: The Creek Fire Beasore Road Repairs project consists of repairing 5.49 miles of Beasore Road. Work to include, but not limited to; cleaning and reconditioning the culverts along the road, replace 600 linear feet of 36” corrugated metal pipe and install metal end sections, locations will be marked by the COR and the length varies from 40 to 60 feet with an average depth of 6 feet. Part of this contract is the 6 inches full depth reclamation from mile post 24.14 to 29.63, install a geogrid Tensar TriAx TX7 or equivalent (Optional item), grade & compact the pulverized material, import & place base rock to correct lower areas, place rip rap on outlets and ditches, place a 4” layer of hot mix asphalt and paint two coats of a double yellow center line.
Currently Norris Creek Bridge is closed, contractors shall plan to deliver supplies and materials using Beasore road to complete the work west from Norris Creek bridge and use Minarets Road and for the remain work east from Norris Creek Bridge. There is an alternative detour route but only for high clearance vehicles and pickup trucks.
PROJECT LOCATION: This project is located in the Sierra National Forest. From Oakhurst, CA (93644), travel 3.2 miles North on highway 41, turn right onto Road 222/Bass Lake Road, continue South for approximately 2.4 miles, slight left onto Beasore Road, continue for approximately 24.8 miles until reach the beginning of the project (37.49443, -119.40617)
Contractors shall furnish all labor, supervision, equipment, materials, tools, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around July 3, 2023. Engineering point of contact is Pablo Gonzalez, telephone: 559-297-0706 ext. 4961 or email pablo.gonzalez@usda.gov. Both performance and payment bonds will be required for this project as well as a bid guarantee. Estimated project value is between $5,000,000 and $10,000,000. NAICS 237310 with size standard $45 mil. This project is set aside 100% for small business.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Creek Fire Beasore Road Repairs | Solicitation | |
| Creek Fire Beasore Road Repairs | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity