Crab Creek Road Bridge Construction
Awarded Award Notice Posted
- Solicitation number
- AG-9AB5-S-16-0015
- Agency
- Region 5 - Pacific Southwest Region Forest Service, Department of Agriculture
- Awarded
- to DRP Construction Company
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-9AB5-C-16-0025 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- San Bernardino National Forest San Bernardino, California 92408, United States
Notice details come from SAM.gov. Updated .
Notice text
8 versions
Update #8 · Latest ·
Added: Feb 04, 2016 1:39 pm
Modified: May 10, 2016 12:40 pmTrack Changes
Update 05/10/2016
Amendment 5 has been uploaded with change to Schedule of Items page. A second Q&A document has been added. The closing date is extended to 5/12/2016. Reminder - emailed proposals will be accepted at mecantrell@fs.fed.us. However, emailed bid bonds will not be accepted.
Update 05/06/2016:
This is a clarification regarding the solicitation number. The correct solicitation number is AG-9AB5-S-16-0015. There was a "typo" with the incorrect number on Amendments 1 & 2.
Update 05/03/2016
Amendment 3 has bee issued to extend the bid closing date to 05/11/2016 by 1:00 pm (pacific time).
Update 04/26/2016
Amendment 3 has been uploaded. The bid closing date has been changed to 05/05/2016 by 1:00 p.m. (Pacific Time). Emailed bids will be accepted (however, emailed bid bonds will NOT be accepted) See Amendment 3 for details.
Update 03/31/2016
THE MANDATORY SITE VISIT HAS BEEN RESCHEDULED. THE NEW DATE/TIME IS FRIDAY, APRIL 22, 2016 AT 10:00 am. THE OFFER DUE DATE HAS BEEN EXTENDED TO MONDAY, MAY 2, 2016. SEE AMENDMENT 2 FOR DETAILS.
Update 03/29/2016:
THE MANDATORY SITE VISIT HAS BEEN RESCHEDULED. THE NEW DATE/TIME IS WEDNESDAY, APRIL 6, 2016 AT 9:30 am.
Participants shall meet at the junction of Forest Road 3N16 (also known as Holcomb Valley Road) and Green Valley Lake Road (coordinates 34.233456°, -117.089378°), then caravan to the job site.l Contact Damon Romero (909) 382-2615 or Joshua Direen (909) 382-2609 for directions and to verify weather conditions prior to the visit.
The Contract shall install a bridge over Crab Creek on Holcomb Valley Road (Forest Service Road 3N16) in San Bernardino County, California. The project also includes removal and replacement of the existing asphalt approaches and removal of parts of an existing concrete structure in the creek near the proposed bridge. The Government's estimate for this project is between $250,000 and $500,000. The project work is estimated to begin on September 1, 2016 and has been alloted 61 calendar days for completion.
The complete plans and specifications are available for download at www.fbo.gov
The bid closing date has been changed to 04/11/2016 by 1:00 p.m. (Pacific time)
Update #7 ·
Added: Feb 04, 2016 1:39 pm
Modified: May 06, 2016 1:16 pmTrack Changes
Update 05/06/2016:
This is a clarification regarding the solicitation number. The correct solicitation number is AG-9AB5-S-16-0015. There was a "typo" with the incorrect number on Amendments 1 & 2.
Update 05/03/2016
Amendment 3 has bee issued to extend the bid closing date to 05/11/2016 by 1:00 pm (pacific time).
Update 04/26/2016
Amendment 3 has been uploaded. The bid closing date has been changed to 05/05/2016 by 1:00 p.m. (Pacific Time). Emailed bids will be accepted (however, emailed bid bonds will NOT be accepted) See Amendment 3 for details.
Update 03/31/2016
THE MANDATORY SITE VISIT HAS BEEN RESCHEDULED. THE NEW DATE/TIME IS FRIDAY, APRIL 22, 2016 AT 10:00 am. THE OFFER DUE DATE HAS BEEN EXTENDED TO MONDAY, MAY 2, 2016. SEE AMENDMENT 2 FOR DETAILS.
Update 03/29/2016:
THE MANDATORY SITE VISIT HAS BEEN RESCHEDULED. THE NEW DATE/TIME IS WEDNESDAY, APRIL 6, 2016 AT 9:30 am.
Participants shall meet at the junction of Forest Road 3N16 (also known as Holcomb Valley Road) and Green Valley Lake Road (coordinates 34.233456°, -117.089378°), then caravan to the job site.l Contact Damon Romero (909) 382-2615 or Joshua Direen (909) 382-2609 for directions and to verify weather conditions prior to the visit.
The Contract shall install a bridge over Crab Creek on Holcomb Valley Road (Forest Service Road 3N16) in San Bernardino County, California. The project also includes removal and replacement of the existing asphalt approaches and removal of parts of an existing concrete structure in the creek near the proposed bridge. The Government's estimate for this project is between $250,000 and $500,000. The project work is estimated to begin on September 1, 2016 and has been alloted 61 calendar days for completion.
The complete plans and specifications are available for download at www.fbo.gov
The bid closing date has been changed to 04/11/2016 by 1:00 p.m. (Pacific time)
Update #6 ·
Added: Feb 04, 2016 1:39 pm
Modified: May 03, 2016 3:01 pmTrack Changes
Update 05/03/2016
Amendment 3 has bee issued to extend the bid closing date to 05/11/2016 by 1:00 pm (pacific time).
Update 04/26/2016
Amendment 3 has been uploaded. The bid closing date has been changed to 05/05/2016 by 1:00 p.m. (Pacific Time). Emailed bids will be accepted (however, emailed bid bonds will NOT be accepted) See Amendment 3 for details.
Update 03/31/2016
THE MANDATORY SITE VISIT HAS BEEN RESCHEDULED. THE NEW DATE/TIME IS FRIDAY, APRIL 22, 2016 AT 10:00 am. THE OFFER DUE DATE HAS BEEN EXTENDED TO MONDAY, MAY 2, 2016. SEE AMENDMENT 2 FOR DETAILS.
Update 03/29/2016:
THE MANDATORY SITE VISIT HAS BEEN RESCHEDULED. THE NEW DATE/TIME IS WEDNESDAY, APRIL 6, 2016 AT 9:30 am.
Participants shall meet at the junction of Forest Road 3N16 (also known as Holcomb Valley Road) and Green Valley Lake Road (coordinates 34.233456°, -117.089378°), then caravan to the job site.l Contact Damon Romero (909) 382-2615 or Joshua Direen (909) 382-2609 for directions and to verify weather conditions prior to the visit.
The Contract shall install a bridge over Crab Creek on Holcomb Valley Road (Forest Service Road 3N16) in San Bernardino County, California. The project also includes removal and replacement of the existing asphalt approaches and removal of parts of an existing concrete structure in the creek near the proposed bridge. The Government's estimate for this project is between $250,000 and $500,000. The project work is estimated to begin on September 1, 2016 and has been alloted 61 calendar days for completion.
The complete plans and specifications are available for download at www.fbo.gov
The bid closing date has been changed to 04/11/2016 by 1:00 p.m. (Pacific time)
Update #5 ·
Added: Feb 04, 2016 1:39 pm
Modified: Apr 26, 2016 3:56 pmTrack Changes
Update 04/26/2016
Amendment 3 has been uploaded. The bid closing date has been changed to 05/05/2016 by 1:00 p.m. (Pacific Time). Emailed bids will be accepted (however, emailed bid bonds will NOT be accepted) See Amendment 3 for details.
Update 03/31/2016
THE MANDATORY SITE VISIT HAS BEEN RESCHEDULED. THE NEW DATE/TIME IS FRIDAY, APRIL 22, 2016 AT 10:00 am. THE OFFER DUE DATE HAS BEEN EXTENDED TO MONDAY, MAY 2, 2016. SEE AMENDMENT 2 FOR DETAILS.
Update 03/29/2016:
THE MANDATORY SITE VISIT HAS BEEN RESCHEDULED. THE NEW DATE/TIME IS WEDNESDAY, APRIL 6, 2016 AT 9:30 am.
Participants shall meet at the junction of Forest Road 3N16 (also known as Holcomb Valley Road) and Green Valley Lake Road (coordinates 34.233456°, -117.089378°), then caravan to the job site.l Contact Damon Romero (909) 382-2615 or Joshua Direen (909) 382-2609 for directions and to verify weather conditions prior to the visit.
The Contract shall install a bridge over Crab Creek on Holcomb Valley Road (Forest Service Road 3N16) in San Bernardino County, California. The project also includes removal and replacement of the existing asphalt approaches and removal of parts of an existing concrete structure in the creek near the proposed bridge. The Government's estimate for this project is between $250,000 and $500,000. The project work is estimated to begin on September 1, 2016 and has been alloted 61 calendar days for completion.
The complete plans and specifications are available for download at www.fbo.gov
The bid closing date has been changed to 04/11/2016 by 1:00 p.m. (Pacific time)
Update #4 ·
Added: Feb 04, 2016 1:39 pm
Modified: Mar 31, 2016 2:04 pmTrack Changes
Update 03/31/2016
THE MANDATORY SITE VISIT HAS BEEN RESCHEDULED. THE NEW DATE/TIME IS FRIDAY, APRIL 22, 2016 AT 10:00 am. THE OFFER DUE DATE HAS BEEN EXTENDED TO MONDAY, MAY 2, 2016. SEE AMENDMENT 2 FOR DETAILS.
Update 03/29/2016:
THE MANDATORY SITE VISIT HAS BEEN RESCHEDULED. THE NEW DATE/TIME IS WEDNESDAY, APRIL 6, 2016 AT 9:30 am.
Participants shall meet at the junction of Forest Road 3N16 (also known as Holcomb Valley Road) and Green Valley Lake Road (coordinates 34.233456°, -117.089378°), then caravan to the job site.l Contact Damon Romero (909) 382-2615 or Joshua Direen (909) 382-2609 for directions and to verify weather conditions prior to the visit.
The Contract shall install a bridge over Crab Creek on Holcomb Valley Road (Forest Service Road 3N16) in San Bernardino County, California. The project also includes removal and replacement of the existing asphalt approaches and removal of parts of an existing concrete structure in the creek near the proposed bridge. The Government's estimate for this project is between $250,000 and $500,000. The project work is estimated to begin on September 1, 2016 and has been alloted 61 calendar days for completion.
The complete plans and specifications are available for download at www.fbo.gov
The bid closing date has been changed to 04/11/2016 by 1:00 p.m. (Pacific time)
Update #3 ·
Added: Feb 04, 2016 1:39 pm
Modified: Mar 29, 2016 11:56 amTrack Changes
Update 03/29/2016:
THE MANDATORY SITE VISIT HAS BEEN RESCHEDULED. THE NEW DATE/TIME IS WEDNESDAY, APRIL 6, 2016 AT 9:30 am.
Participants shall meet at the junction of Forest Road 3N16 (also known as Holcomb Valley Road) and Green Valley Lake Road (coordinates 34.233456°, -117.089378°), then caravan to the job site.l Contact Damon Romero (909) 382-2615 or Joshua Direen (909) 382-2609 for directions and to verify weather conditions prior to the visit.
The Contract shall install a bridge over Crab Creek on Holcomb Valley Road (Forest Service Road 3N16) in San Bernardino County, California. The project also includes removal and replacement of the existing asphalt approaches and removal of parts of an existing concrete structure in the creek near the proposed bridge. The Government's estimate for this project is between $250,000 and $500,000. The project work is estimated to begin on September 1, 2016 and has been alloted 61 calendar days for completion.
The complete plans and specifications are available for download at www.fbo.gov
The bid closing date has been changed to 04/11/2016 by 1:00 p.m. (Pacific time)
Update #2 ·
Added: Feb 04, 2016 1:39 pm
Modified: Mar 10, 2016 2:18 pmTrack Changes
The Contract shall install a bridge over Crab Creek on Holcomb Valley Road (Forest Service Road 3N16) in San Bernardino County, California. The project also includes removal and replacement of the existing asphalt approaches and removal of parts of an existing concrete structure in the creek near the proposed bridge. The Government's estimate for this project is between $250,000 and $500,000. The project work is estimated to begin on September 1, 2016 and has been alloted 61 calendar days for completion.
A MANDATORY SITE VISIT HAS BEEN SCHEDULED. See attachments for details
The complete plans and specifications are available for download at www.fbo.gov
The bid closing date has been changed to 04/11/2016 by 1:00 p.m. (Pacific time)
Update #1 ·
Added: Feb 04, 2016 1:39 pm
The Contract shall install a bridge over Crab Creek on Holcomb Valley Road (Forest Service Road 3N16) in San Bernardino County, California. The project also includes removal and replacement of the existing asphalt approaches and removal of parts of an existing concrete structure in the creek near the proposed bridge. The Government's estimate for this project is between $250,000 and $500,000. The project work is estimated to begin on September 1, 2016 and has been alloted 61 calendar days for completion.
No formal site visit will be scheduled. Contractors are urged to inspect the site on their own. Directions to the site: From the intersection of CA-210 and CA-330, travel northeast on CA-330 approximately 14.94 miles (CA-330 becomes CA-18), travel 2.64 miles more, then turn left onto Green Valley Lake Road. Travel 2.68 miles and turn left onto Crab Flats Road (FS 3N16). Travel 3.76 miles to the project site where Crab Creek crosses the road.
The complete plans and specifications will be available for download at www.fbo.gov when they are available. Please do not call asking for copies of plans and specifications.
Attachments
| File | Type | Posted |
|---|---|---|
| AmendmentFive.pdf | ||
| Crab_Creek_Road_Bridge_QAs_2.pdf | ||
| AmendmentFour.pdf | ||
| Crab_Creek_Prebid_Site_Visit_Attendance_Sheet_04-22-2016.pdf | ||
| AmendmentThree.pdf | ||
| Q As.pdf | ||
| AmendmentTwo.pdf | ||
| SF-30.pdf | ||
| RFP_AG9AB5S160015.pdf | ||
| Attach5_Wage_Rate.pdf | ||
| Attach1_Crab_Creek_Bridge_FS_Supplemental_Specs_FP03.pdf | ||
| Attach3_CrabCk_Planset_1-11-16.pdf | ||
| Attach2_CASQA_Specs.pdf | ||
| Attach4_Fire_Plan.pdf |