Console modernization at Long Beach Airport, CA
Closed Pre-Solicitation Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- 01569_Console_Modernization_Long_Beach_California
- Agency
- Southwestern Region Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238390 Other Building Finishing Contractors
- PSC
- 7110 Office Furniture
- Place of performance
- Long Beach, California, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks proposals for a console modernization project at the Long Beach Airport Traffic Control Tower in Long Beach, California. The soliciting agency, the United States Department of Transportation Federal Aviation Administration Southwestern Region, requires the design and installation of a new slatwall console system for ten air traffic controller positions. Proposers must submit 45%, 70%, and 100% design drawings and plans for review. Additional requirements include demolishing existing consoles, fabricating and installing new perimeter slatwall consoles, replacing electrical, plumbing and lighting systems, installing new carpet, and implementing a transition plan to allow for ongoing tower operations during construction. Proposals are due by June 7, 2022.
No set-aside designation was used for this procurement. The primary NAICS code is 238210 and PSC code R499. The scope of work involves modernizing the air traffic control tower consoles for the single facility at Long Beach Airport. Proposers must demonstrate experience with air traffic control tower projects and designing seismic-rated slatwall systems. The government files did not provide budget details, but the scope indicates this will represent a mid-sized modernization project for the facility.
Notice text
Work includes, but is not limited to:
A. Design of new slatwall console system for ten controller positions in the tower cab. Design must proceed through phases, with 45%, 70%, and 100% Design Submittals and Review
B. Demolition of existing perimeter consoles and center turret.
C. Fabrication and installation of new perimeter slatwall consoles, mounts, miscellaneous accessories, and appliances. All consoles are to be secured per the IBC for seismic design (assume I factor 1.5).
D. Replacement of convenience sink, counters, cubbies, and millwork in cab.
E. Removal of outlets, jacks, and plugmolds that may interfere with slatwall installation (See “Existing Electrical Drawings”). Replace receptacles inside consoles with new twist lock receptacles and provide power strips. Reuse existing conduits to provide power for new consoles where available. Remove outlets and jacks along wooden backsplash and provide new receptacles and jacks along galley/countertop backsplash.
F. Replace and rewire light/dimmer switches in cab.
G. Remove and replace multipoint ground plate in junction level. Connect new metal console busbars to new multipoint ground. Replace current single lug grounding connections with double lug connections.
H. Mount Cab shade pulleys and hardware currently mounted to old consoles to new slat wall locations.
I. Provide temporary power outlets for transition/installation.
J. Provide and install new ESD carpet in Cab.
K. Provide Electronic copies of shop drawings and plans. Drawings and plans must be in DWG format.
L. With the FAA, implement the transition plan provided by the FAA to accomplish said work in such a way that the existing Air Traffic Operations can continue during the towers operational hours in the existing ATCT cab. “LGB Transition Plan & Drawings” is a living document and can be updated throughout the project. Changes to the transition plan will be discussed and implemented during the design and construction process.
Attachments
| File | Type | Posted |
|---|---|---|
| LGB Console Modernization SOW and Specifications.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Console modernization at Long Beach Airport, CA | Solicitation | |
| Console modernization at Long Beach Airport, CA | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity