Chips Creek Trail Bridge/Trail

Awarded Award Notice Posted

Solicitation number
129AC718R0002
Agency
Region 5 - Pacific Southwest Region Forest Service, Department of Agriculture
Awarded
to Ridge2River Construction LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
129AC718C0022 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
The project is located on the Almanor Ranger District (Plumas County) in the Lassen National Forest at Township 25N, Range 6E in Section 8 Latitude 40.03237N, Longitude 121.3599W Butte Meadows, California, United States

Notice details come from SAM.gov. Updated .

Notice text

9 versions

Update #9 · Latest ·

Added: Feb 06, 2018 12:19 pm Modified: Jul 30, 2018 12:16 pmTrack Changes QUESTIONS & ANSWERS

Additional Q&A have been posted along with additional photos of the site.


AMENDMENT NOTICE

Amendment 0005 to extend the Response Date, update the applicable wage determination, post photos taken at the site visit and provide Q&A has been posted.


AMENDMENT NOTICE / SITE VISIT DATE

Amendment 0004 to extend the Response Date, update the Project Plans and provide Q&A's has been posted.  The pre-bid meeting is currently scheduled for July 12, 2018 meeting at Chester Airport (Rogers Field), Highway 36, Chester California at 0700. It is expected to take all day. Those planning to attend should wear comfortable clothes, bring plenty of water and snacks/lunch as you see necessary. High clearance vehicles are necessary to reach the parking area. The job site is approximately a 5 mile hike from the parking area with an elevation difference of 1,600 feet. Some portions of the trail are lined with Poison Oak, are narrow and may be rocky/uneven.  PLEASE CONFIRM YOUR ATTENDANCE TO THE SITE VISIT SO WE KNOW HOW MANY TO EXPECT.  THIS WILL ALLOW US TO KNOW WHEN ALL PARTIES ARE AT THE MEETING LOCATION SO WE DO CAN ENSURE WE ALL STAY TOGETHER.


AMENDMENT NOTICE

Amendment 0003 to extend the Response Date and update the applicable wage determination has been posted. Due to limited access to the site NO site visit has been scheduled to date. We are continually monitoring the area. Once safe access to the site is available, a site visit will be schedule. Once scheduled, the date will be posted here.


AMENDMENT NOTICE

Amendment 0002 to extend the Response Date and update the applicable wage determination has been posted.  Due to current weather creating limited access to the site NO site visit has been scheduled to date.  We are continually monitoring the area.  Once safe access to the site is available, a site visit will be schedule.  Once scheduled, the date will be posted here.


PLANNING INFORMATION REQUESTED

In preparation for the site vist, which has not yet been scheduled, the government is trying to gather some information from prospective offers who plan to attend the site visit once scheduled.  Because of the location of the work, limited parking and the likely need for 4X4 access we want to ensure we are able to accommodate everyone who wishes to attend.  To that end, we are seeking information on the number in your group that plan to attend, type of vechile and if you do have a 4X4, if you have room for any additional passengers.  This information will help us determine if we need to alter the meeting point or perhaps have additional government vehicles available.  Please provide this information by email to tmarino@fs.fed.us.


AMENDMENT NOTICE

Amendment 0001 has been posted.  Due to current weather creating limited access to the site NO site visit has been scheduled to date.  It is anticipated to be sometime toward the end of April 2018.  Once the exact date has been determined it will be posted here.


SOLICITATION NOTICE

Solicitation and all attachments are now posted.  Site visit date is TBD based on weather/access to the site.  Updated site visit information will be posted to this notice.


PRE SOLICITATION NOTICE

Requirement: Furnish all labor, equipment and materials to design, fabricate, deliver and install a new prefabricated bridge across Chips Creek along the Pacific Crest Trail in accordance with contract plans and specifications. The Pacific Crest Trail route will be modified as part of this project such that in order to approach the new bridge, it will require that approximately 20 feet of new trail tread west of the bridge and approximately 600 feet of new trail tread east of the bridge be constructed, thus relocating the existing trail away from the existing stream ford crossing that will be abandoned. New signs consisting of route markers and manufactured blazers will be installed at the beginning and end of the new trail segment. The existing trail to be abandoned will be rehabilitated as well as approximately 100 feet of streambank on both sides of the creek at the existing stream ford. The bridge and all needed materials to perform the work shall be transported to the project site by helicopter. It is expected the use of explosives will be required to prepare the bridge footings and access trail.

The project is located on the Almanor Ranger District (Plumas County) in the Lassen National Forest at Township 25N, Range 6E in Section 8; Latitude 40.03237N, Longitude 121.3599W

Estimated Magnitude (Price Range): Between $250,000 and $500,000

Contract Time: It is estimated the project will start at time of award and be completed by the end of June 2019

Set Asides: This procurement is being solicited as a small business set-aside. The North American Industry Classification System (NAICS) Code is 237990. The related small business size standard is $36.5M.

Solicitation Info: Solicitation is being conducted under FAR Part 15. All responsible sources may submit a response, which shall be considered. The anticipated posting of this solicitation is on or about February 22, 2018.

Site Visit/Pre-proposal Conference: A site visit/pre-proposal conference will be held for this project tentatively scheduled for early March 2018. Exact date, time and location will be available in the solicitation when it becomes available.

Bonds: A Bid guarantee is required with the offer. Performance and Payment Bonds in the amount of 100% of the contract price will be required of the successful contractor within 10 days of award.

Inquiries: Any prospective contractor with contractual or technical questions of the solicitation, drawings, specifications, etc., must request it in writing from the Contracting Officer soon enough to allow a reply to reach all prospective contractors before the solicitation closing date. Oral explanations or instructions given before the award of a contract will not be binding.

Notifications: In accordance with FAR 5.102(d), the government is limiting the availability of the solicitation to electronic medium through this posting to FBO.gov. Notification of any postponements and any amendments to this solicitation will be posted on this website. It is the sole responsibility of the offeror to continually view this website for any amendments made to this solicitation. Award notifications will be made to this notice. Early notification will not be made to any offeror except Awarded Contractor.

Update #8 ·

Added: Feb 06, 2018 12:19 pm Modified: Jul 24, 2018 12:16 pmTrack Changes AMENDMENT NOTICE

Amendment 0005 to extend the Response Date, update the applicable wage determination, post photos taken at the site visit and provide Q&A has been posted.


AMENDMENT NOTICE / SITE VISIT DATE

Amendment 0004 to extend the Response Date, update the Project Plans and provide Q&A's has been posted.  The pre-bid meeting is currently scheduled for July 12, 2018 meeting at Chester Airport (Rogers Field), Highway 36, Chester California at 0700. It is expected to take all day. Those planning to attend should wear comfortable clothes, bring plenty of water and snacks/lunch as you see necessary. High clearance vehicles are necessary to reach the parking area. The job site is approximately a 5 mile hike from the parking area with an elevation difference of 1,600 feet. Some portions of the trail are lined with Poison Oak, are narrow and may be rocky/uneven.  PLEASE CONFIRM YOUR ATTENDANCE TO THE SITE VISIT SO WE KNOW HOW MANY TO EXPECT.  THIS WILL ALLOW US TO KNOW WHEN ALL PARTIES ARE AT THE MEETING LOCATION SO WE DO CAN ENSURE WE ALL STAY TOGETHER.


AMENDMENT NOTICE

Amendment 0003 to extend the Response Date and update the applicable wage determination has been posted. Due to limited access to the site NO site visit has been scheduled to date. We are continually monitoring the area. Once safe access to the site is available, a site visit will be schedule. Once scheduled, the date will be posted here.


AMENDMENT NOTICE

Amendment 0002 to extend the Response Date and update the applicable wage determination has been posted.  Due to current weather creating limited access to the site NO site visit has been scheduled to date.  We are continually monitoring the area.  Once safe access to the site is available, a site visit will be schedule.  Once scheduled, the date will be posted here.


PLANNING INFORMATION REQUESTED

In preparation for the site vist, which has not yet been scheduled, the government is trying to gather some information from prospective offers who plan to attend the site visit once scheduled.  Because of the location of the work, limited parking and the likely need for 4X4 access we want to ensure we are able to accommodate everyone who wishes to attend.  To that end, we are seeking information on the number in your group that plan to attend, type of vechile and if you do have a 4X4, if you have room for any additional passengers.  This information will help us determine if we need to alter the meeting point or perhaps have additional government vehicles available.  Please provide this information by email to tmarino@fs.fed.us.


AMENDMENT NOTICE

Amendment 0001 has been posted.  Due to current weather creating limited access to the site NO site visit has been scheduled to date.  It is anticipated to be sometime toward the end of April 2018.  Once the exact date has been determined it will be posted here.


SOLICITATION NOTICE

Solicitation and all attachments are now posted.  Site visit date is TBD based on weather/access to the site.  Updated site visit information will be posted to this notice.


PRE SOLICITATION NOTICE

Requirement: Furnish all labor, equipment and materials to design, fabricate, deliver and install a new prefabricated bridge across Chips Creek along the Pacific Crest Trail in accordance with contract plans and specifications. The Pacific Crest Trail route will be modified as part of this project such that in order to approach the new bridge, it will require that approximately 20 feet of new trail tread west of the bridge and approximately 600 feet of new trail tread east of the bridge be constructed, thus relocating the existing trail away from the existing stream ford crossing that will be abandoned. New signs consisting of route markers and manufactured blazers will be installed at the beginning and end of the new trail segment. The existing trail to be abandoned will be rehabilitated as well as approximately 100 feet of streambank on both sides of the creek at the existing stream ford. The bridge and all needed materials to perform the work shall be transported to the project site by helicopter. It is expected the use of explosives will be required to prepare the bridge footings and access trail.

The project is located on the Almanor Ranger District (Plumas County) in the Lassen National Forest at Township 25N, Range 6E in Section 8; Latitude 40.03237N, Longitude 121.3599W

Estimated Magnitude (Price Range): Between $250,000 and $500,000

Contract Time: It is estimated the project will start at time of award and be completed by the end of June 2019

Set Asides: This procurement is being solicited as a small business set-aside. The North American Industry Classification System (NAICS) Code is 237990. The related small business size standard is $36.5M.

Solicitation Info: Solicitation is being conducted under FAR Part 15. All responsible sources may submit a response, which shall be considered. The anticipated posting of this solicitation is on or about February 22, 2018.

Site Visit/Pre-proposal Conference: A site visit/pre-proposal conference will be held for this project tentatively scheduled for early March 2018. Exact date, time and location will be available in the solicitation when it becomes available.

Bonds: A Bid guarantee is required with the offer. Performance and Payment Bonds in the amount of 100% of the contract price will be required of the successful contractor within 10 days of award.

Inquiries: Any prospective contractor with contractual or technical questions of the solicitation, drawings, specifications, etc., must request it in writing from the Contracting Officer soon enough to allow a reply to reach all prospective contractors before the solicitation closing date. Oral explanations or instructions given before the award of a contract will not be binding.

Notifications: In accordance with FAR 5.102(d), the government is limiting the availability of the solicitation to electronic medium through this posting to FBO.gov. Notification of any postponements and any amendments to this solicitation will be posted on this website. It is the sole responsibility of the offeror to continually view this website for any amendments made to this solicitation. Award notifications will be made to this notice. Early notification will not be made to any offeror except Awarded Contractor.

Update #7 ·

Added: Feb 06, 2018 12:19 pm Modified: Jun 27, 2018 3:51 pmTrack Changes AMENDMENT NOTICE / SITE VISIT DATE

Amendment 0004 to extend the Response Date, update the Project Plans and provide Q&A's has been posted.  The pre-bid meeting is currently scheduled for July 12, 2018 meeting at Chester Airport (Rogers Field), Highway 36, Chester California at 0700. It is expected to take all day. Those planning to attend should wear comfortable clothes, bring plenty of water and snacks/lunch as you see necessary. High clearance vehicles are necessary to reach the parking area. The job site is approximately a 5 mile hike from the parking area with an elevation difference of 1,600 feet. Some portions of the trail are lined with Poison Oak, are narrow and may be rocky/uneven.  PLEASE CONFIRM YOUR ATTENDANCE TO THE SITE VISIT SO WE KNOW HOW MANY TO EXPECT.  THIS WILL ALLOW US TO KNOW WHEN ALL PARTIES ARE AT THE MEETING LOCATION SO WE DO CAN ENSURE WE ALL STAY TOGETHER.


AMENDMENT NOTICE

Amendment 0003 to extend the Response Date and update the applicable wage determination has been posted. Due to limited access to the site NO site visit has been scheduled to date. We are continually monitoring the area. Once safe access to the site is available, a site visit will be schedule. Once scheduled, the date will be posted here.


AMENDMENT NOTICE

Amendment 0002 to extend the Response Date and update the applicable wage determination has been posted.  Due to current weather creating limited access to the site NO site visit has been scheduled to date.  We are continually monitoring the area.  Once safe access to the site is available, a site visit will be schedule.  Once scheduled, the date will be posted here.


PLANNING INFORMATION REQUESTED

In preparation for the site vist, which has not yet been scheduled, the government is trying to gather some information from prospective offers who plan to attend the site visit once scheduled.  Because of the location of the work, limited parking and the likely need for 4X4 access we want to ensure we are able to accommodate everyone who wishes to attend.  To that end, we are seeking information on the number in your group that plan to attend, type of vechile and if you do have a 4X4, if you have room for any additional passengers.  This information will help us determine if we need to alter the meeting point or perhaps have additional government vehicles available.  Please provide this information by email to tmarino@fs.fed.us.


AMENDMENT NOTICE

Amendment 0001 has been posted.  Due to current weather creating limited access to the site NO site visit has been scheduled to date.  It is anticipated to be sometime toward the end of April 2018.  Once the exact date has been determined it will be posted here.


SOLICITATION NOTICE

Solicitation and all attachments are now posted.  Site visit date is TBD based on weather/access to the site.  Updated site visit information will be posted to this notice.


PRE SOLICITATION NOTICE

Requirement: Furnish all labor, equipment and materials to design, fabricate, deliver and install a new prefabricated bridge across Chips Creek along the Pacific Crest Trail in accordance with contract plans and specifications. The Pacific Crest Trail route will be modified as part of this project such that in order to approach the new bridge, it will require that approximately 20 feet of new trail tread west of the bridge and approximately 600 feet of new trail tread east of the bridge be constructed, thus relocating the existing trail away from the existing stream ford crossing that will be abandoned. New signs consisting of route markers and manufactured blazers will be installed at the beginning and end of the new trail segment. The existing trail to be abandoned will be rehabilitated as well as approximately 100 feet of streambank on both sides of the creek at the existing stream ford. The bridge and all needed materials to perform the work shall be transported to the project site by helicopter. It is expected the use of explosives will be required to prepare the bridge footings and access trail.

The project is located on the Almanor Ranger District (Plumas County) in the Lassen National Forest at Township 25N, Range 6E in Section 8; Latitude 40.03237N, Longitude 121.3599W

Estimated Magnitude (Price Range): Between $250,000 and $500,000

Contract Time: It is estimated the project will start at time of award and be completed by the end of June 2019

Set Asides: This procurement is being solicited as a small business set-aside. The North American Industry Classification System (NAICS) Code is 237990. The related small business size standard is $36.5M.

Solicitation Info: Solicitation is being conducted under FAR Part 15. All responsible sources may submit a response, which shall be considered. The anticipated posting of this solicitation is on or about February 22, 2018.

Site Visit/Pre-proposal Conference: A site visit/pre-proposal conference will be held for this project tentatively scheduled for early March 2018. Exact date, time and location will be available in the solicitation when it becomes available.

Bonds: A Bid guarantee is required with the offer. Performance and Payment Bonds in the amount of 100% of the contract price will be required of the successful contractor within 10 days of award.

Inquiries: Any prospective contractor with contractual or technical questions of the solicitation, drawings, specifications, etc., must request it in writing from the Contracting Officer soon enough to allow a reply to reach all prospective contractors before the solicitation closing date. Oral explanations or instructions given before the award of a contract will not be binding.

Notifications: In accordance with FAR 5.102(d), the government is limiting the availability of the solicitation to electronic medium through this posting to FBO.gov. Notification of any postponements and any amendments to this solicitation will be posted on this website. It is the sole responsibility of the offeror to continually view this website for any amendments made to this solicitation. Award notifications will be made to this notice. Early notification will not be made to any offeror except Awarded Contractor.

Update #6 ·

Added: Feb 06, 2018 12:19 pm Modified: Jun 06, 2018 6:35 pmTrack Changes AMENDMENT NOTICE

Amendment 0003 to extend the Response Date and update the applicable wage determination has been posted. Due to limited access to the site NO site visit has been scheduled to date. We are continually monitoring the area. Once safe access to the site is available, a site visit will be schedule. Once scheduled, the date will be posted here.


AMENDMENT NOTICE

Amendment 0002 to extend the Response Date and update the applicable wage determination has been posted.  Due to current weather creating limited access to the site NO site visit has been scheduled to date.  We are continually monitoring the area.  Once safe access to the site is available, a site visit will be schedule.  Once scheduled, the date will be posted here.


PLANNING INFORMATION REQUESTED

In preparation for the site vist, which has not yet been scheduled, the government is trying to gather some information from prospective offers who plan to attend the site visit once scheduled.  Because of the location of the work, limited parking and the likely need for 4X4 access we want to ensure we are able to accommodate everyone who wishes to attend.  To that end, we are seeking information on the number in your group that plan to attend, type of vechile and if you do have a 4X4, if you have room for any additional passengers.  This information will help us determine if we need to alter the meeting point or perhaps have additional government vehicles available.  Please provide this information by email to tmarino@fs.fed.us.


AMENDMENT NOTICE

Amendment 0001 has been posted.  Due to current weather creating limited access to the site NO site visit has been scheduled to date.  It is anticipated to be sometime toward the end of April 2018.  Once the exact date has been determined it will be posted here.


SOLICITATION NOTICE

Solicitation and all attachments are now posted.  Site visit date is TBD based on weather/access to the site.  Updated site visit information will be posted to this notice.


PRE SOLICITATION NOTICE

Requirement: Furnish all labor, equipment and materials to design, fabricate, deliver and install a new prefabricated bridge across Chips Creek along the Pacific Crest Trail in accordance with contract plans and specifications. The Pacific Crest Trail route will be modified as part of this project such that in order to approach the new bridge, it will require that approximately 20 feet of new trail tread west of the bridge and approximately 600 feet of new trail tread east of the bridge be constructed, thus relocating the existing trail away from the existing stream ford crossing that will be abandoned. New signs consisting of route markers and manufactured blazers will be installed at the beginning and end of the new trail segment. The existing trail to be abandoned will be rehabilitated as well as approximately 100 feet of streambank on both sides of the creek at the existing stream ford. The bridge and all needed materials to perform the work shall be transported to the project site by helicopter. It is expected the use of explosives will be required to prepare the bridge footings and access trail.

The project is located on the Almanor Ranger District (Plumas County) in the Lassen National Forest at Township 25N, Range 6E in Section 8; Latitude 40.03237N, Longitude 121.3599W

Estimated Magnitude (Price Range): Between $250,000 and $500,000

Contract Time: It is estimated the project will start in April 2018 and be completed by the end of June 2018

Set Asides: This procurement is being solicited as a small business set-aside. The North American Industry Classification System (NAICS) Code is 237990. The related small business size standard is $36.5M.

Solicitation Info: Solicitation is being conducted under FAR Part 15. All responsible sources may submit a response, which shall be considered. The anticipated posting of this solicitation is on or about February 22, 2018.

Site Visit/Pre-proposal Conference: A site visit/pre-proposal conference will be held for this project tentatively scheduled for early March 2018. Exact date, time and location will be available in the solicitation when it becomes available.

Bonds: A Bid guarantee is required with the offer. Performance and Payment Bonds in the amount of 100% of the contract price will be required of the successful contractor within 10 days of award.

Inquiries: Any prospective contractor with contractual or technical questions of the solicitation, drawings, specifications, etc., must request it in writing from the Contracting Officer soon enough to allow a reply to reach all prospective contractors before the solicitation closing date. Oral explanations or instructions given before the award of a contract will not be binding.

Notifications: In accordance with FAR 5.102(d), the government is limiting the availability of the solicitation to electronic medium through this posting to FBO.gov. Notification of any postponements and any amendments to this solicitation will be posted on this website. It is the sole responsibility of the offeror to continually view this website for any amendments made to this solicitation. Award notifications will be made to this notice. Early notification will not be made to any offeror except Awarded Contractor.

Update #5 ·

Added: Feb 06, 2018 12:19 pm Modified: May 03, 2018 9:27 amTrack Changes AMENDMENT NOTICE

Amendment 0002 to extend the Response Date and update the applicable wage determination has been posted.  Due to current weather creating limited access to the site NO site visit has been scheduled to date.  We are continually monitoring the area.  Once safe access to the site is available, a site visit will be schedule.  Once scheduled, the date will be posted here.


PLANNING INFORMATION REQUESTED

In preparation for the site vist, which has not yet been scheduled, the government is trying to gather some information from prospective offers who plan to attend the site visit once scheduled.  Because of the location of the work, limited parking and the likely need for 4X4 access we want to ensure we are able to accommodate everyone who wishes to attend.  To that end, we are seeking information on the number in your group that plan to attend, type of vechile and if you do have a 4X4, if you have room for any additional passengers.  This information will help us determine if we need to alter the meeting point or perhaps have additional government vehicles available.  Please provide this information by email to tmarino@fs.fed.us.


AMENDMENT NOTICE

Amendment 0001 has been posted.  Due to current weather creating limited access to the site NO site visit has been scheduled to date.  It is anticipated to be sometime toward the end of April 2018.  Once the exact date has been determined it will be posted here.


SOLICITATION NOTICE

Solicitation and all attachments are now posted.  Site visit date is TBD based on weather/access to the site.  Updated site visit information will be posted to this notice.


PRE SOLICITATION NOTICE

Requirement: Furnish all labor, equipment and materials to design, fabricate, deliver and install a new prefabricated bridge across Chips Creek along the Pacific Crest Trail in accordance with contract plans and specifications. The Pacific Crest Trail route will be modified as part of this project such that in order to approach the new bridge, it will require that approximately 20 feet of new trail tread west of the bridge and approximately 600 feet of new trail tread east of the bridge be constructed, thus relocating the existing trail away from the existing stream ford crossing that will be abandoned. New signs consisting of route markers and manufactured blazers will be installed at the beginning and end of the new trail segment. The existing trail to be abandoned will be rehabilitated as well as approximately 100 feet of streambank on both sides of the creek at the existing stream ford. The bridge and all needed materials to perform the work shall be transported to the project site by helicopter. It is expected the use of explosives will be required to prepare the bridge footings and access trail.

The project is located on the Almanor Ranger District (Plumas County) in the Lassen National Forest at Township 25N, Range 6E in Section 8; Latitude 40.03237N, Longitude 121.3599W

Estimated Magnitude (Price Range): Between $250,000 and $500,000

Contract Time: It is estimated the project will start in April 2018 and be completed by the end of June 2018

Set Asides: This procurement is being solicited as a small business set-aside. The North American Industry Classification System (NAICS) Code is 237990. The related small business size standard is $36.5M.

Solicitation Info: Solicitation is being conducted under FAR Part 15. All responsible sources may submit a response, which shall be considered. The anticipated posting of this solicitation is on or about February 22, 2018.

Site Visit/Pre-proposal Conference: A site visit/pre-proposal conference will be held for this project tentatively scheduled for early March 2018. Exact date, time and location will be available in the solicitation when it becomes available.

Bonds: A Bid guarantee is required with the offer. Performance and Payment Bonds in the amount of 100% of the contract price will be required of the successful contractor within 10 days of award.

Inquiries: Any prospective contractor with contractual or technical questions of the solicitation, drawings, specifications, etc., must request it in writing from the Contracting Officer soon enough to allow a reply to reach all prospective contractors before the solicitation closing date. Oral explanations or instructions given before the award of a contract will not be binding.

Notifications: In accordance with FAR 5.102(d), the government is limiting the availability of the solicitation to electronic medium through this posting to FBO.gov. Notification of any postponements and any amendments to this solicitation will be posted on this website. It is the sole responsibility of the offeror to continually view this website for any amendments made to this solicitation. Award notifications will be made to this notice. Early notification will not be made to any offeror except Awarded Contractor.

Update #4 ·

Added: Feb 06, 2018 12:19 pm Modified: Apr 10, 2018 4:53 pmTrack Changes PLANNING INFORMATION REQUESTED

In preparation for the site vist, which has not yet been scheduled, the government is trying to gather some information from prospective offers who plan to attend the site visit once scheduled.  Because of the location of the work, limited parking and the likely need for 4X4 access we want to ensure we are able to accommodate everyone who wishes to attend.  To that end, we are seeking information on the number in your group that plan to attend, type of vechile and if you do have a 4X4, if you have room for any additional passengers.  This information will help us determine if we need to alter the meeting point or perhaps have additional government vehicles available.  Please provide this information by email to tmarino@fs.fed.us.


AMENDMENT NOTICE

Amendment 0001 has been posted.  Due to current weather creating limited access to the site NO site visit has been scheduled to date.  It is anticipated to be sometime toward the end of April 2018.  Once the exact date has been determined it will be posted here.


SOLICITATION NOTICE

Solicitation and all attachments are now posted.  Site visit date is TBD based on weather/access to the site.  Updated site visit information will be posted to this notice.


PRE SOLICITATION NOTICE

Requirement: Furnish all labor, equipment and materials to design, fabricate, deliver and install a new prefabricated bridge across Chips Creek along the Pacific Crest Trail in accordance with contract plans and specifications. The Pacific Crest Trail route will be modified as part of this project such that in order to approach the new bridge, it will require that approximately 20 feet of new trail tread west of the bridge and approximately 600 feet of new trail tread east of the bridge be constructed, thus relocating the existing trail away from the existing stream ford crossing that will be abandoned. New signs consisting of route markers and manufactured blazers will be installed at the beginning and end of the new trail segment. The existing trail to be abandoned will be rehabilitated as well as approximately 100 feet of streambank on both sides of the creek at the existing stream ford. The bridge and all needed materials to perform the work shall be transported to the project site by helicopter. It is expected the use of explosives will be required to prepare the bridge footings and access trail.

The project is located on the Almanor Ranger District (Plumas County) in the Lassen National Forest at Township 25N, Range 6E in Section 8; Latitude 40.03237N, Longitude 121.3599W

Estimated Magnitude (Price Range): Between $250,000 and $500,000

Contract Time: It is estimated the project will start in April 2018 and be completed by the end of June 2018

Set Asides: This procurement is being solicited as a small business set-aside. The North American Industry Classification System (NAICS) Code is 237990. The related small business size standard is $36.5M.

Solicitation Info: Solicitation is being conducted under FAR Part 15. All responsible sources may submit a response, which shall be considered. The anticipated posting of this solicitation is on or about February 22, 2018.

Site Visit/Pre-proposal Conference: A site visit/pre-proposal conference will be held for this project tentatively scheduled for early March 2018. Exact date, time and location will be available in the solicitation when it becomes available.

Bonds: A Bid guarantee is required with the offer. Performance and Payment Bonds in the amount of 100% of the contract price will be required of the successful contractor within 10 days of award.

Inquiries: Any prospective contractor with contractual or technical questions of the solicitation, drawings, specifications, etc., must request it in writing from the Contracting Officer soon enough to allow a reply to reach all prospective contractors before the solicitation closing date. Oral explanations or instructions given before the award of a contract will not be binding.

Notifications: In accordance with FAR 5.102(d), the government is limiting the availability of the solicitation to electronic medium through this posting to FBO.gov. Notification of any postponements and any amendments to this solicitation will be posted on this website. It is the sole responsibility of the offeror to continually view this website for any amendments made to this solicitation. Award notifications will be made to this notice. Early notification will not be made to any offeror except Awarded Contractor.

Update #3 ·

Added: Feb 06, 2018 12:19 pm Modified: Mar 19, 2018 4:07 pmTrack Changes AMENDMENT NOTICE

Amendment 0001 has been posted.  Due to current weather creating limited access to the site NO site visit has been scheduled to date.  It is anticipated to be sometime toward the end of April 2018.  Once the exact date has been determined it will be posted here.


SOLICITATION NOTICE

Solicitation and all attachments are now posted.  Site visit date is TBD based on weather/access to the site.  Updated site visit information will be posted to this notice.


PRE SOLICITATION NOTICE

Requirement: Furnish all labor, equipment and materials to design, fabricate, deliver and install a new prefabricated bridge across Chips Creek along the Pacific Crest Trail in accordance with contract plans and specifications. The Pacific Crest Trail route will be modified as part of this project such that in order to approach the new bridge, it will require that approximately 20 feet of new trail tread west of the bridge and approximately 600 feet of new trail tread east of the bridge be constructed, thus relocating the existing trail away from the existing stream ford crossing that will be abandoned. New signs consisting of route markers and manufactured blazers will be installed at the beginning and end of the new trail segment. The existing trail to be abandoned will be rehabilitated as well as approximately 100 feet of streambank on both sides of the creek at the existing stream ford. The bridge and all needed materials to perform the work shall be transported to the project site by helicopter. It is expected the use of explosives will be required to prepare the bridge footings and access trail.

The project is located on the Almanor Ranger District (Plumas County) in the Lassen National Forest at Township 25N, Range 6E in Section 8; Latitude 40.03237N, Longitude 121.3599W

Estimated Magnitude (Price Range): Between $250,000 and $500,000

Contract Time: It is estimated the project will start in April 2018 and be completed by the end of June 2018

Set Asides: This procurement is being solicited as a small business set-aside. The North American Industry Classification System (NAICS) Code is 237990. The related small business size standard is $36.5M.

Solicitation Info: Solicitation is being conducted under FAR Part 15. All responsible sources may submit a response, which shall be considered. The anticipated posting of this solicitation is on or about February 22, 2018.

Site Visit/Pre-proposal Conference: A site visit/pre-proposal conference will be held for this project tentatively scheduled for early March 2018. Exact date, time and location will be available in the solicitation when it becomes available.

Bonds: A Bid guarantee is required with the offer. Performance and Payment Bonds in the amount of 100% of the contract price will be required of the successful contractor within 10 days of award.

Inquiries: Any prospective contractor with contractual or technical questions of the solicitation, drawings, specifications, etc., must request it in writing from the Contracting Officer soon enough to allow a reply to reach all prospective contractors before the solicitation closing date. Oral explanations or instructions given before the award of a contract will not be binding.

Notifications: In accordance with FAR 5.102(d), the government is limiting the availability of the solicitation to electronic medium through this posting to FBO.gov. Notification of any postponements and any amendments to this solicitation will be posted on this website. It is the sole responsibility of the offeror to continually view this website for any amendments made to this solicitation. Award notifications will be made to this notice. Early notification will not be made to any offeror except Awarded Contractor.

Update #2 ·

Added: Feb 06, 2018 12:19 pm Modified: Feb 23, 2018 8:40 amTrack Changes SOLICITATION NOTICE

Solicitation and all attachments are now posted.  Site visit date is TBD based on weather/access to the site.  Updated site visit information will be posted to this notice.


PRE SOLICITATION NOTICE

Requirement: Furnish all labor, equipment and materials to design, fabricate, deliver and install a new prefabricated bridge across Chips Creek along the Pacific Crest Trail in accordance with contract plans and specifications. The Pacific Crest Trail route will be modified as part of this project such that in order to approach the new bridge, it will require that approximately 20 feet of new trail tread west of the bridge and approximately 600 feet of new trail tread east of the bridge be constructed, thus relocating the existing trail away from the existing stream ford crossing that will be abandoned. New signs consisting of route markers and manufactured blazers will be installed at the beginning and end of the new trail segment. The existing trail to be abandoned will be rehabilitated as well as approximately 100 feet of streambank on both sides of the creek at the existing stream ford. The bridge and all needed materials to perform the work shall be transported to the project site by helicopter. It is expected the use of explosives will be required to prepare the bridge footings and access trail.

The project is located on the Almanor Ranger District (Plumas County) in the Lassen National Forest at Township 25N, Range 6E in Section 8; Latitude 40.03237N, Longitude 121.3599W

Estimated Magnitude (Price Range): Between $250,000 and $500,000

Contract Time: It is estimated the project will start in April 2018 and be completed by the end of June 2018

Set Asides: This procurement is being solicited as a small business set-aside. The North American Industry Classification System (NAICS) Code is 237990. The related small business size standard is $36.5M.

Solicitation Info: Solicitation is being conducted under FAR Part 15. All responsible sources may submit a response, which shall be considered. The anticipated posting of this solicitation is on or about February 22, 2018.

Site Visit/Pre-proposal Conference: A site visit/pre-proposal conference will be held for this project tentatively scheduled for early March 2018. Exact date, time and location will be available in the solicitation when it becomes available.

Bonds: A Bid guarantee is required with the offer. Performance and Payment Bonds in the amount of 100% of the contract price will be required of the successful contractor within 10 days of award.

Inquiries: Any prospective contractor with contractual or technical questions of the solicitation, drawings, specifications, etc., must request it in writing from the Contracting Officer soon enough to allow a reply to reach all prospective contractors before the solicitation closing date. Oral explanations or instructions given before the award of a contract will not be binding.

Notifications: In accordance with FAR 5.102(d), the government is limiting the availability of the solicitation to electronic medium through this posting to FBO.gov. Notification of any postponements and any amendments to this solicitation will be posted on this website. It is the sole responsibility of the offeror to continually view this website for any amendments made to this solicitation. Award notifications will be made to this notice. Early notification will not be made to any offeror except Awarded Contractor.

Update #1 ·

Added: Feb 06, 2018 12:19 pm PRE SOLICITATION NOTICE

Requirement: Furnish all labor, equipment and materials to design, fabricate, deliver and install a new prefabricated bridge across Chips Creek along the Pacific Crest Trail in accordance with contract plans and specifications. The Pacific Crest Trail route will be modified as part of this project such that in order to approach the new bridge, it will require that approximately 20 feet of new trail tread west of the bridge and approximately 600 feet of new trail tread east of the bridge be constructed, thus relocating the existing trail away from the existing stream ford crossing that will be abandoned. New signs consisting of route markers and manufactured blazers will be installed at the beginning and end of the new trail segment. The existing trail to be abandoned will be rehabilitated as well as approximately 100 feet of streambank on both sides of the creek at the existing stream ford. The bridge and all needed materials to perform the work shall be transported to the project site by helicopter. It is expected the use of explosives will be required to prepare the bridge footings and access trail.

The project is located on the Almanor Ranger District (Plumas County) in the Lassen National Forest at Township 25N, Range 6E in Section 8; Latitude 40.03237N, Longitude 121.3599W

Estimated Magnitude (Price Range): Between $250,000 and $500,000

Contract Time: It is estimated the project will start in April 2018 and be completed by the end of June 2018

Set Asides: This procurement is being solicited as a small business set-aside. The North American Industry Classification System (NAICS) Code is 237990. The related small business size standard is $36.5M.

Solicitation Info: Solicitation is being conducted under FAR Part 15. All responsible sources may submit a response, which shall be considered. The anticipated posting of this solicitation is on or about February 22, 2018.

Site Visit/Pre-proposal Conference: A site visit/pre-proposal conference will be held for this project tentatively scheduled for early March 2018. Exact date, time and location will be available in the solicitation when it becomes available.

Bonds: A Bid guarantee is required with the offer. Performance and Payment Bonds in the amount of 100% of the contract price will be required of the successful contractor within 10 days of award.

Inquiries: Any prospective contractor with contractual or technical questions of the solicitation, drawings, specifications, etc., must request it in writing from the Contracting Officer soon enough to allow a reply to reach all prospective contractors before the solicitation closing date. Oral explanations or instructions given before the award of a contract will not be binding.

Notifications: In accordance with FAR 5.102(d), the government is limiting the availability of the solicitation to electronic medium through this posting to FBO.gov. Notification of any postponements and any amendments to this solicitation will be posted on this website. It is the sole responsibility of the offeror to continually view this website for any amendments made to this solicitation. Award notifications will be made to this notice. Early notification will not be made to any offeror except Awarded Contractor.

Attachments

Files attached to this notice, newest first
File Type Posted
Photo_3_-_Site.jpg JPG image
Photo_7_-_Site.JPG JPG image
Q&A_Version_3.docx DOCX document
Photo_5_-_Site.JPG JPG image
Photo_6_-_Site.JPG JPG image
Photo_8_-_Site.JPG JPG image
Photo_4_-_Site.JPG JPG image
Site_Visit_Attendees.pdf PDF
Q&A_Version_2.docx DOCX document
Photo_1_-_Staging.jpg JPG image
Photo_2_-_Site.jpg JPG image
Attachment_3_-_General_Decision_Number_CA180009,_Modification_14_.pdf PDF
Photo_2_-_Trail.jpg JPG image
Video_1_-_Site.mov MOV file
Photo_1_-_Trail.jpg JPG image
129AC718R0002-0005.pdf PDF
Photo_1_-_Site.jpeg JPEG file
129AC718R0002-0004.pdf PDF
Q&A_Version_1.docx DOCX document
Attachment_2_-_Project_Plans_r1.pdf PDF
Attachment_3_-_General_Decision_Number_CA180009,_Modification_10_.pdf PDF
129AC718R0002-0003.pdf PDF
Attachment_3_-_General_Decision_Number_CA180009,_Modification_7_.pdf PDF
129AC718R0002-0002.pdf PDF
129AC718R0002-0001.pdf PDF
Attachment_3_-_General_Decision_Number_CA180009,_Modification_6_.pdf PDF
Attachment_3_-_General_Decision_Number_CA180009,_Modification_5.pdf PDF
129AC718R0002.pdf PDF
Attachment_2_-_Project_Plans.pdf PDF
Attachment_1_-_Project_Supplemental_Specifications_r1.pdf PDF