129AC718R0002-0004.pdf

PDF 192 KB Posted

Attached to
Chips Creek Trail Bridge/Trail Federal contract opportunity
Solicitation number
129AC718R0002
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to Chips Creek Trail Bridge/Trail, newest first.
File Type Posted
Photo_4_-_Site.JPG JPG image
Photo_3_-_Site.jpg JPG image
Photo_7_-_Site.JPG JPG image
Photo_6_-_Site.JPG JPG image
Photo_8_-_Site.JPG JPG image
Q&A_Version_3.docx DOCX document
Photo_5_-_Site.JPG JPG image
Site_Visit_Attendees.pdf PDF
Q&A_Version_2.docx DOCX document
Photo_1_-_Trail.jpg JPG image
129AC718R0002-0005.pdf PDF
Photo_1_-_Site.jpeg JPEG file
Photo_1_-_Staging.jpg JPG image
Photo_2_-_Site.jpg JPG image
Attachment_3_-_General_Decision_Number_CA180009,_Modification_14_.pdf PDF
Photo_2_-_Trail.jpg JPG image
Video_1_-_Site.mov MOV file
Attachment_2_-_Project_Plans_r1.pdf PDF
Q&A_Version_1.docx DOCX document
Attachment_3_-_General_Decision_Number_CA180009,_Modification_10_.pdf PDF
129AC718R0002-0003.pdf PDF
Attachment_3_-_General_Decision_Number_CA180009,_Modification_7_.pdf PDF
129AC718R0002-0002.pdf PDF
Attachment_3_-_General_Decision_Number_CA180009,_Modification_6_.pdf PDF
129AC718R0002-0001.pdf PDF
Attachment_3_-_General_Decision_Number_CA180009,_Modification_5.pdf PDF
Attachment_1_-_Project_Supplemental_Specifications_r1.pdf PDF
129AC718R0002.pdf PDF
Attachment_2_-_Project_Plans.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

129AC718R0002

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

9AC7

SUSANVILLE CA 96130

2550 RIVERSIDE DRIVE ROOM 174

R5 NO-CAL ACQ SERVICE AREA NCASA

USDA FOREST SERVICE

9AC7

REDDING CA 96002

3644 AVTECH PARKWAY SUITE 180

R5 NO-CAL ACQ SERVICE AREA NCASA

USDA FOREST SERVICE

06/26/20180004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/22/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

129AC718R0002, Chips Creek Trail Bridge is amended to:

a. Extend the response due date until 07/30/2018 at 1400 to facilitate a site visit and

Q&As;

b. Update SECTION B - Prices/Costs/Schedule of Items;

c. Update SECTION C - Description/Specifications/Statement of Work;

d. Update clauses 52.211-10 and 52.236-27 - Alternate I; and

e. Replace the existing Attachment 2 - Project Plans with the attached Attachment 2 -

Project Plans r1

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

KIM A. DELEON

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

129AC718R0002/0004

Delivery: 06/30/2019

Delivery Location Code: 9JNE

USDA FOREST SERVICE

SIERRA CASCADE ACQUISITION GROUP

2550 RIVERSIDE DRIVE

SUSANVILLE CA 96130 US

FOB: Destination

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SF 30 BLOCK 14 CONTINUATION SHEET

SUMMARY OF CHANGES

SOLICITATION/CONTRACT FORM

The Offer Due Date/Local Time has changed from 1400 (hour) local time 07/12/2018 (date) to 1400 (hour) local time 07/30/2018 (date)

The following have been revised

SECTION B - PRICES/COSTS SCHEDULE OF ITEMS

ITEM NO.* SUPPLIES/SERVICES QUANTITY** UNIT UNIT PRICE AMOUNT

15101 Mobilization/Demobilization 1 LS $____________ $_____________

20801 Structural Excavation 26 CY $____________ $_____________

20803 Structural Backfill 40 CY $____________ $_____________

55201 Structural Concrete, Class A (AE) 22 CY $____________ $_____________

55401 Reinforcing Steel 2000 LB $____________ $_____________

56401 Elastomeric Bearing Devise 4 EA $____________ $_____________

57101 Prefabricated Bridge Superstructure; 1 LS $____________ $_____________ Design, Fabricate, Deliver and Install

60505 Geocomposite Sheet Drain System 12 SY $____________ $_____________

91310 Construct New Trail 620 LF $____________ $_____________

93520 Stacked Rock Retaining Wall 40 SF $____________ $_____________

98100 Decommission/Rehabilitate Existing 2610027100 SF $____________ $_____________ Trail to be Abandoned, Material Staging Areas, Borrow Area and Streamside Areas at Ford crossing to be Decommissioned

TOTAL $_____________

*Offeror must bid on each ITEM NO. listed to be considered for award **Offers for less than quantities listed may be rejected.

SECTION C - Description/Specifications/Statement of Work

C.1 Scope of Work

This project will design, fabricate, deliver and install a new prefabricated bridge across Chips Creek along the Pacific Crest Trail in the Lassen National Forest. The Pacific Crest Trail route will be modified as part of this project such that in order to approach the new bridge, it will require that approximately 20 feet of new trail tread west of the bridge and approximately 600 feet of new trail tread east of the bridge be constructed, thus relocating the existing trail away from the existing stream ford crossing that will be abandoned. New signs consisting of route markers and manufactured blazers will be installed at the beginning and end of the new trail segment. The existing trail to be abandoned will be rehabilitated as well as approximately 100 feet of stream bank on both sides of the creek at the existing stream ford. It is expected the use of explosives will be required to prepare the bridge footings and access trail. The use of a helicopter to aid in the construction is anticipated. The Contractor shall provide all labor, supervision, transportation, operating supplies and incidentals to perform this project.

C.2 Location of Project

Chips Creek Bridge is located at Township 25N, Range 6E in Section 8; Latitude 40.03237N, Longitude 121.3599W in Plumas County California. Access the site by coming either from Paradise or Butte Meadows to the Humbug Summit Road, Butte Co. Route 91513, then to National Forest System Road 27N17 to the end of road at the intersection of the Pacific Crest Trail near the Poison Springs Campground. Vehicles will be parked at this location and personnel will access the project site via the Pacific Crest Trail from this location. From the intersection of NFS Road 27N17 with the Pacific Crest Trail at about the 6800 foot elevation it is approximately 0.35 miles to the Poison Springs Campsite then approximately another 2.4 miles down to the job site at the bottom of the canyon at about the 5200 foot elevation for 2.75 miles total distance from the designated vehicular parking location and total elevation difference of approximately 1600 feet. Access the site by coming either from Paradise, Butte Meadows or Chester to the Humbug Summit Road, Butte County Route 91513, then to Lassen National Forest Route 25N27 to Philbrook Reservoir then to Lassen National Forest Route 25N05 to the OHV area at Lott's Lake. High clearance vehicles are necessary to reach the parking area. Vehicles will be parked at this location and personnel will access the project site via Lassen National Forest Route 25N05 OHV portion to the Pacific Crest Trail Access Spur then to the PCT from this location. From the parking area at NFS Road 25N05 to the job site is approximately a 5 mile hike, a total elevation difference of approx. 1600 feet.

C.3 Operating Season

There are no seasonal restrictions other than what is noted below.

There may be limited operating periods due to wildlife concerns. These will be identified prior to start of project.

C.4 Other Requirements

It is anticipated that project personnel will need to camp in the general vicinity of the bridge site. The actual location for the Contractor's Campsite has yet to be established and will be approved by the Contracting Officer.

The camp area shall be managed for items such as trash and unattended food that bears can forage on. Best management practices (BMPs) shall be incorporated for recreation, soil, water quality, and aquatic resources. The Contractor may use horses and/or pack mules to porter materials and supplies to the job site as well as a helicopter to aid in the construction and or porterage of supplies and materials. The Contactor's camp area shall be kept in a neat and presentable condition so as to maintain the trail for others to enjoy while work is underway. Campfire permits will be required. It is expected that this work will be accomplished beginning in April not later than June 30, 2019.

SECTION F - Deliveries or Performance

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than June 30, 2019. The time stated for completion shall include final cleanup of the premises.

(End of clause)

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents

52.236- 27 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigation and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for -

Thursday July 12, 2018 at 0700

(c) Participants will meet at -

Chester Airport Highway 36 Chester, CA 96020