CA BLM 19041(1), Guidotti Bridge

Awarded Award Notice Posted

Solicitation number
DTFH6815B00002
Agency
Federal Highway Administration Department of Transportation
Awarded
to Hoseley Corporation
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6815C00026 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Fort Ord National Monument Monterey County, California 93908, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Jan 29, 2015 12:35 pm Modified: Feb 13, 2015 9:20 amTrack Changes

THIS PROJECT IS ADVERTISED ON A FULL AND OPEN BASIS.
 
Project Details: This project is located in Monterey County, California within Fort Ord National Monument adjacent to State Route 68 (Monterey-Salinas Highway) approximately 6 miles southwest of Salinas. This project consists of the replacement of the existing 125 foot long Guidotti Bridge over El Toro Creek.


The existing Guidotti Bridge is an approximately 125 foot long, single lane, 3 span filled concrete spandrel arch structure. The middle arch was constructed in 1908 and two exterior spans constructed in 1911. The bridge site is on Guidotti Road trail, a single lane gravel road, located approximately ¼ mile from Badger Hill Trail head parking lot adjacent to State Route 68.


Guidotti Road and other roads and trails within Fort Ord National Monument experience high visitor use including pedestrians, bicyclists, and equestrians. The bridge will be closed to all traffic during construction but adjacent trail access will need to be maintained for visitors. Portions of the existing concrete structure, containing the original stamped bridge dates, are required to be sawcut and salvaged for incorporation into an interpretative display.


The proposed single-span bridge superstructure will consist of 4 adjacent prestressed concrete box beams with thin bonded epoxy overlay. The bridge will be founded on eight (8) driven steel H-piles (HP 14x89) extended approximately 50-feet deep into silty sand and sandy silt subsurface materials. A wave-equation analysis completed by an experienced professional engineer will be required prior to approval of pile-driving equipment. During pile driving operations great attention to detail will be required to ensure that the alignment is within ¼ inch per foot and the piles are driven to within 3 inches of the required cutoff location.


This project will require approximately 4,100 LB of reinforcing steel (epoxy coated), 25 CUYD of structural concrete, 380 LNFT of driven steel H-piles, 392 LNFT of precast, prestressed concrete box beam, 200 LNFT of 54 inch high, combination steel and concrete bridge railing, 160 SQYD of thin bonded epoxy overlay, 225 CUYD of earthwork, and 300 CUYD of riprap.


This project is located within a sensitive location on BLM lands with high public visitation. All construction debris will need to be contained and kept out of the active channel at the bridge site and dewatering will be required for all work within the active channel. Great attention to detail will be required in achieving customer satisfaction in areas of bridge construction, timely completion of work, minimization of impacts to natural resources, and visitor relations.


It is anticipated that this project will be advertised in February 2015 with construction occurring from April through August, 2015. THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE NOT YET AVAILABLE.  The anticipated contract value is between $.5 million and $1 million.

Update #1 ·

Added: Jan 29, 2015 12:35 pm THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE NOT YET AVAILABLE.

This project will be advertised on a Full and Open basis. The tentative advertisement date is on or around February 13, 2015. Plans and specifications will be available at that time.

Project Details: This project is located in Monterey County, California within Fort Ord National Monument adjacent to State Route 68 (Monterey-Salinas Highway) approximately 6 miles southwest of Salinas. This project consists of the replacement of the existing 125 foot long Guidotti Bridge over El Toro Creek.


The existing Guidotti Bridge is an approximately 125 foot long, single lane, 3 span filled concrete spandrel arch structure. The middle arch was constructed in 1908 and two exterior spans constructed in 1911. The bridge site is on Guidotti Road trail, a single lane gravel road, located approximately ¼ mile from Badger Hill Trail head parking lot adjacent to State Route 68.


Guidotti Road and other roads and trails within Fort Ord National Monument experience high visitor use including pedestrians, bicyclists, and equestrians. The bridge will be closed to all traffic during construction but adjacent trail access will need to be maintained for visitors. Portions of the existing concrete structure, containing the original stamped bridge dates, are required to be sawcut and salvaged for incorporation into an interpretative display.


The proposed single-span bridge superstructure will consist of 4 adjacent prestressed concrete box beams with thin bonded epoxy overlay. The bridge will be founded on eight (8) driven steel H-piles (HP 14x89) extended approximately 50-feet deep into silty sand and sandy silt subsurface materials. A wave-equation analysis completed by an experienced professional engineer will be required prior to approval of pile-driving equipment. During pile driving operations great attention to detail will be required to ensure that the alignment is within ¼ inch per foot and the piles are driven to within 3 inches of the required cutoff location.


This project will require approximately 4,100 LB of reinforcing steel (epoxy coated), 25 CUYD of structural concrete, 380 LNFT of driven steel H-piles, 392 LNFT of precast, prestressed concrete box beam, 200 LNFT of 54 inch high, combination steel and concrete bridge railing, 160 SQYD of thin bonded epoxy overlay, 225 CUYD of earthwork, and 300 CUYD of riprap.


This project is located within a sensitive location on BLM lands with high public visitation. All construction debris will need to be contained and kept out of the active channel at the bridge site and dewatering will be required for all work within the active channel. Great attention to detail will be required in achieving customer satisfaction in areas of bridge construction, timely completion of work, minimization of impacts to natural resources, and visitor relations.


It is anticipated that this project will be advertised in February 2015 with construction occurring from April through August, 2015. THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE NOT YET AVAILABLE.  The anticipated contract value is between $.5 million and $1 million.

Attachments

Files attached to this notice, newest first
File Type Posted
BidTabs.pdf PDF
Bid_Opening_Summary.pdf PDF
Amendment_A002.pdf PDF
Q A.pdf PDF
Q A.pdf PDF
Q A.pdf PDF
Amendment_A001.pdf PDF
FINAL_GEOTECH_RPT_CA_BLM_19041.pdf PDF
Hydraulics_Report.pdf PDF
DTFH6815B00002.pdf PDF
Final_Hydraulics_Recommendations-FortOrd_Aug_2014.pdf PDF
CA-BLM19041(2)-100_plans.pdf PDF
Show all 12

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
CA BLM 19041(2) Guidotti Bridge Latest Award Notice
CA BLM 19041(1), Guidotti Bridge This notice · Original Award Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity