Barry Point Suppression Fence Construction and Maintenance
Awarded Award Notice Posted
- Solicitation number
- AG-04N7-S-13-0020
- Agency
- Region 6 - Pacific Northwest Region Forest Service, Department of Agriculture
- Awarded
- to Cougar Mountain Farm LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-04N7-C-13-0018 Federal contract award
- NAICS code
- 238990 All Other Specialty Trade Contractors
- PSC
- Not on record
- Place of performance
- Lakeview Ranger District 18049 Highway 395 Lakeview, Oregon 97630, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Apr 11, 2013 6:52 pm Modified: Apr 30, 2013 1:50 pmTrack Changes
The project includes all labor, materials (except Government furnished main fencing materials), equipment, supplies, supervision and incidentals necessary for the
removal of existing fire damaged fence, right of way clearing and construction of new barbed wire fence (Total of six fences -approximatly 7 miles of fence).
This project is located on the Lakeview Ranger District of the Fremont-Winema National Forest, Lake County, Oregon. The Government estimate is between $25,000 and $100,000. A payment bond (100 percent) will be required after award (applicable if contract exceeds $30,000). Estimated start work is June 3, 2013.
The full solicitation will be available for download from FedBizOpps website at http://www.fbo.gov on or about 05/03/2013.
Note: All prospective awardee shall be registered in the System for Awards Management (SAM) data base prior to award. Information on registration may be obtained via the internet at: https://www.sam.gov/portal/public/SAM/
Update #1 ·
Added: Apr 11, 2013 6:52 pm
The project includes all labor, materials (except Government furnished main fencing materials), equipment, supplies, supervision and incidentals necessary for the
removal of existing fire damaged fence, right of way clearing and construction of new barbed wire fence (Total of six fences -approximatly 7 miles of fence).
This project is located on the Lakeview Ranger District of the Fremont-Winema National Forest, Lake County, Oregon. The Government estimate is between $25,000 and $100,000. A payment bond (100 percent) and a performance bond (100 percent) will be required after award. Estimated start work is June 3, 2013.
The full solicitation will be available for download from FedBizOpps website at http://www.fbo.gov on or about 04/26/2013.
Note: All prospective awardee shall be registered in the System for Awards Management (SAM) data base prior to award. Information on registration may be obtained via the internet at: https://www.sam.gov/portal/public/SAM/
Attachments
| File | Type | Posted |
|---|---|---|
| RFQConstruction.pdf | ||
| Specifications.pdf | ||
| ReturnPacket.docx | DOCX document | |
| Maps.pdf | ||
| Exhibits.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity