Barkley Spillway Emergency Maintenance Bulkhead
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912P522Q0036
- Agency
- ENDIST Nashville US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 332312 Fabricated Structural Metal Manufacturing
- Place of performance
- Grand Rivers, Kentucky, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation from the Nashville District of the U.S. Army Corps of Engineers seeks the fabrication and delivery of one new 58-foot long hydraulic steel bulkhead section for use in the Barkley Dam spillway in Grand Rivers, Kentucky. The contractor must provide all necessary equipment, labor, and materials to fabricate the approximately 60,000 pound structure from ASTM A709 Grade 50 steel. The completed bulkhead must be blasted to white metal and coated with a five-coat moisture cure urethane paint system before delivery. Bidders are required to have specific American Institute of Steel Construction certifications and employ American Welding Society qualified welders, with all welding and testing to comply with stated standards. Quotes are due by August 16, 2022.
The opportunity is set aside 100% for total small businesses. The NAICS code is 332312 for Fabricated Structural Metal Manufacturing with a size standard of 500 employees. The PSC code is J054. Coating must be applied by a qualified SSPC or AISC certified painting contractor. The bulkhead is to be delivered to Barkley Dam in Grand Rivers, Kentucky within 550 calendar days of award. An amendment extended the period of performance and provided question and answer responses.
Notice text
2 versions
Update #2 · Latest ·
Solicitation Number:
W912P522Q0036
Notice Type:
Solicitation
NAICS CODE AND SBA SIZE STANDARD: 332312, Fabricated Structural Metal Manufacturing, with a size standard of 500 employees (PSC: J054)
TYPE OF SET-ASIDE: 100% Total Small Business Set-aside
PROJECT DESCRIPTION: The Nashville District Contracting Division has a requirement that will include the contractor providing all necessary equipment, labor, and materials for the fabrication and delivery of a hydraulic steel structure called a bulkhead (or stoplog), which are stackable structures used to create temporary damming surfaces across the dam spillways. The contract requires fabrication of one (1) new section, approximately 58’-0” long, 8’-0” tall, and weighing approximately 60,000 pounds. This section will be used with existing sections to create the full damming surface. After fabrication, the structures are required to be blasted to white metal (SSPC SP 5) and painted with the 5-E-Z moisture cure urethane paint system. The contract USACE will have with the Contractor is a “supply” contract; they will only be required to fabricate, paint, and deliver the bulkhead section. The fabricator will deliver the stoplogs to Barkley Dam located in Grand Rivers, KY. The project drawings and reference documents will be included with the solicitation.
- The fabricator is required to have one of the following AISC certifications at the time of bidding and throughout the contract period of performance:
- AISC Certified Metal Hydraulic Fabricator (HYD)
- AISC Certified Bridge Fabricator – Simple (SBR)
- AISC Certified Bridge Fabricator – Intermediate (IBR)
- Additionally, the fabricator is required to have the AISC Fracture Critical Endorsement (FC) at the time of bidding and throughout the contract period of performance.
- Additionally, the welding is required to be performed in accordance with the American Welding Society requirements specified in AWS D1.5.
- Welders and welding operators shall be qualified appropriately.
- Welding Procedure Specifications shall be qualified and adhered to.
- A Fracture Control Plan shall be developed and adhered to.
- A weld tracking log shall be developed and adhered to.
- Inspection and Testing shall be performed by appropriately qualified individuals.
- Additionally, the structures are required to be coated by a qualified painting contractor possessing the appropriate SSPC Certification (QP1, QP2, QP3) or AISC Certification for Sophisticated Paint Endorsement (SP1, SP2, SP3). Qualified paint applicators are also required.
The full solicitation with all drawings and specifications is attached.
Please register in PIEE to see the updates to the Solicitation. We have changed the process of how we received Quotes. Please register -
INSTRUCTIONS TO FOLLOW ON THE PIEE WEBSITE:
For instructions on how to post a bid, please refer to the Posting Offer demo:
https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.
An amendment 0001 has been uploaded and attached to this solicitation.
Update #1 ·
Solicitation Number:
W912P522Q0036
Notice Type:
Solicitation
NAICS CODE AND SBA SIZE STANDARD: 332312, Fabricated Structural Metal Manufacturing, with a size standard of 500 employees (PSC: J054)
TYPE OF SET-ASIDE: 100% Total Small Business Set-aside
PROJECT DESCRIPTION: The Nashville District Contracting Division has a requirement that will include the contractor providing all necessary equipment, labor, and materials for the fabrication and delivery of a hydraulic steel structure called a bulkhead (or stoplog), which are stackable structures used to create temporary damming surfaces across the dam spillways. The contract requires fabrication of one (1) new section, approximately 58’-0” long, 8’-0” tall, and weighing approximately 60,000 pounds. This section will be used with existing sections to create the full damming surface. After fabrication, the structures are required to be blasted to white metal (SSPC SP 5) and painted with the 5-E-Z moisture cure urethane paint system. The contract USACE will have with the Contractor is a “supply” contract; they will only be required to fabricate, paint, and deliver the bulkhead section. The fabricator will deliver the stoplogs to Barkley Dam located in Grand Rivers, KY. The project drawings and reference documents will be included with the solicitation.
- The fabricator is required to have one of the following AISC certifications at the time of bidding and throughout the contract period of performance:
- AISC Certified Metal Hydraulic Fabricator (HYD)
- AISC Certified Bridge Fabricator – Simple (SBR)
- AISC Certified Bridge Fabricator – Intermediate (IBR)
- Additionally, the fabricator is required to have the AISC Fracture Critical Endorsement (FC) at the time of bidding and throughout the contract period of performance.
- Additionally, the welding is required to be performed in accordance with the American Welding Society requirements specified in AWS D1.5.
- Welders and welding operators shall be qualified appropriately.
- Welding Procedure Specifications shall be qualified and adhered to.
- A Fracture Control Plan shall be developed and adhered to.
- A weld tracking log shall be developed and adhered to.
- Inspection and Testing shall be performed by appropriately qualified individuals.
- Additionally, the structures are required to be coated by a qualified painting contractor possessing the appropriate SSPC Certification (QP1, QP2, QP3) or AISC Certification for Sophisticated Paint Endorsement (SP1, SP2, SP3). Qualified paint applicators are also required.
The full solicitation with all drawings and specifications is attached.
Please register in PIEE to see the updates to the Solicitation. We have changed the process of how we received Quotes. Please register -
INSTRUCTIONS TO FOLLOW ON THE PIEE WEBSITE:
For instructions on how to post a bid, please refer to the Posting Offer demo:
https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.
Attachments
| File | Type | Posted |
|---|---|---|
| W912P522Q0036 Amendment_0001 Final.pdf | ||
| TSpecs_W912P522Q0036_BAR Spillway Bulkhead_RTA.pdf | ||
| 07_BAR New Spillway Bulkhead Section - RTA Dwgs.pdf | ||
| W912P522Q0036 Final Solicitation.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Barkley Spillway Emergency Maintenance Bulkhead | Award Notice | |
| Barkley Spillway Emergency Maintenance Bulkhead | Solicitation | |
| Barkley Spillway Emergency Maintenance Bulkhead | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity