ORCA_2017_Performance_Work_Statement.docx
DOCX document 18 KB Posted
- Attached to
- 103rd WMD-CST Collective Training Event "ORCA 2017" Federal contract opportunity
- Solicitation number
- W91ZRU-17-T-0099
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A_Solicitation_W91ZRU-17-T-0099-ORCA_2017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement For 103rd WMD-CST Collective Training Event: “ORCA 2017”
1.0 Objective: The objective of this task is to facilitate and execute a 24-36 hour, full scale, multi-agency, all-hazards collective training exercise in Anchorage, Alaska from 1-5 May 2017. Exercise will create an environment to exercise the mission essential tasks outlined in the current Combined Arms Training Strategies, CBRN: WMD – Civil Support Team (WMD-CST) (TDA) (0300627-35). This exercise involves the 103rd (AK), 94th (GU), 81st (ND), 72nd (NE), 13th (RI) WMD-CSTs, and Federal, State, and Local First Responders.
2.0 Specific Tasks: The contractor will provide the necessary personnel, labor, materials, supplies, and equipment as indicated below to perform the tasks outlined:
2.1 Scenario Development: This event is intended to reinforce interagency cooperation, communications, Transfer of Authority (RIP/TOA) procedures, and aid in the development of Techniques, Tactics, and Procedures (TTP’s). The scenarios must address the full spectrum of Chemical, Biological, Radiological, Nuclear (CBRN) hazards as well as force protection threats such as Improvised Explosive Devices (IEDs), in a realistic Defense Support to Civil Authorities (DSCA) operating environment. The scenarios should be designed to stress the team’s performance of its Mission Essential Tasks. It must also provide an environment ready for on-the-fly injects as necessary to ensure all of the CATS WMD-CST Mission Essential Tasks are exercised. The scenario must provide the complexity and realism to represent an actual Weapons of Mass Destruction (WMD) event. Contractor provides realistic training aids, devices, and simulators that properly stimulate current WMD-CST detection and analytical equipment, enabling the WMD-CST to make sophisticated assessments and decisions. Realism and technical exactitude are crucial for all training aids, devices, simulators, and venues. The full scenario should provide one complete, continuous, and demanding training event not to exceed 36 hours.
2.2 Scenario Staffing: The contractor will provide staff that is sufficiently experienced and certified to meet the annual hazardous material first responder refresher training requirements per 29 CFR 1910.120 (q)(7), in order to create target sites that replicate chemical and biological laboratory production, radiological and explosive device manufacturing, CBRN device deployment, and be prepared to act as role players in the scenario. Roles played may include Incident Commander (IC), FBI or local law enforcement officers, Explosive Ordinance Disposal (EOD), ICS Safety Officer, ICS Staging Officer, technical medical point of contact, and technical laboratory point of contact. All staff must have a full understanding of the Incident Command System (ICS), and their role in a WMD event. Since staff may be playing the roles of trained hazardous materials (HAZMAT) professionals and reacting to the decisions of the WMD-CST, they should be fully trained in HAZMAT operations to at least the Technician level in accordance with National Fire Protection Association (NFPA) standards. All staff must be well versed in WMD-CST operations and all governing regulations to supplement the training and reinforcement of standard WMD-CST operational principles during the exercises. As these exercises are to assist in SOG construction and implementation, as well as reinforce Training and Evaluation Tasks enforced at a national certification level, prior contractor participation in at least (3) national level training exercises to include having executed at least (5) CST External Evaluations (EXEVAL) is vital to plenary understanding of the training requirements. The contractor will have a licensed heavy equipment operator available for target site adjustments (see 3.1 and 3.2, below). Contractor will establish a “Simulation Cell” of technical/subject matter experts to facilitate/adjudicate the synchronization and facilitation of all exercises as required.
2.3 Scenario role players: The contractor will provide role players for injury simulation; minimum of 5 and no more than 10. The contractor shall also provide means to transport the casualty role players from the scene of the incident to the hospitals.
3.0 Place of Performance: The contractor locates and identifies target venues in the Anchorage community area, and possibly Palmer and Wasilla, to meet the requirements for target locations, vehicle footprint, communications equipment, egress, and functioning utilities (electricity, water supply) in accordance with the CATS WMD-CST Mission Essential Tasks, ATP 3-11.46, and unit Standard Operating Guidelines (SOG).
3.1 Target Site: The contractor will prepare the target sites as necessary to enhance the realism of the scenario. All heavy equipment, furniture, decorations, props, etc. will be provided by the contractor.
3.2 Site Adjustments: Any necessary adjustments to the site (to include major building construction, inoperable vehicle placement, demolition, fabrications) will be made by the contractor. In addition, if any adjustments are deemed necessary by the Exercise Director, the contractor shall make the changes. At the conclusion of the exercise, the contractor will return the site to its previous state. All site clean-up will be performed by the contractor. The contractor will provide portable toilets, at all major target sites. Contractor shall provide at a minimum five (5) target sites.
4.0 Period of Performance: It is estimated that ten (10) days will be needed to complete the task, with seven (7) days for preparation, two (2) days for execution, and one (1) day for clean-up.
5.0 Reporting Requirements and Deliverables: Contractor will provide the following deliverables:
5.1 Refined Scenario Summary: The contractor will provide copies of refined scenario summaries for each exercise to the Exercise Director, Raymond Toves, 196th IN BDE, no later than 10 days prior to exercise execution.
5.2 Master Scenario Events List (MSEL): The contractor will provide the Exercise Director a draft of the MSEL no later than 5 days prior to exercise execution. As revisions are made, updated copies will be provided to the Exercise Director.
5.3 Task Deliverable Schedule Table:
| Deliverable |
| Req. Ref. |
| Due Date |
| Exercise Scenario Summary |
| 5.1 |
| 10 days prior to exercise execution |
| MSEL |
| 5.2 |
| 5 days prior to exercise execution |
6.0 Government Furnished Information/Equipment:
6.1 The Government will provide all training facilities/classrooms required outside of the scenario
7.0 Contractor Manpower Reporting Statement
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following address: https://contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative; (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including sub-contractor); (7) Total payments (including subcontractor); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different; (9) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (10) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest City, Country when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language, and; (13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). As part of its submission the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year.
8.0 Special Provisions
8.1 Quality Control. The Exercise Director will oversee conduct of training and skills test to ensure effective and appropriate training is being conducted.
8.2 Hours of Operation: Normal Duty Hours. The contractor will prepare the target sites from 0800-1600 daily for seven (7) days and facilitate the exercise for no more than 36 continuous hours.
8.3 Contractor Employees. The contractor will determine the suitable number of employees needed to prepare all target sites and facilitate the 36 hour exercise.
8.4 Special Qualifications. The contractor must have qualifications that enable them to construct a plausible WMD target site(s) and assess teams in accordance with CATS WMD-CST Mission Essential Tasks, and possess qualifications and experience sufficient to meet the hazardous materials emergency responder annual refresher training requirements per 29 CFR 1910.120 (q)(7) (see 2.0, 2.1, 2.2 above).
8.5 Security Requirements. Contractor personnel will not be required to obtain security clearances. However, all personnel involved must be able to obtain installation pass or be signed on by another member.
8.6 Identification of Employees. Identification of employees will be at the discretion of the contractor.
8.7 Utilities. N/A.
9.0 Applicable Documents. N/A.
File details come from the government source that posted it. Updated .