CEKT132211_Specifications_dated_15OCT18.pdf

PDF 2 MB Posted

Attached to
CEKT132211 Parking Lot Bldg 24 Federal contract opportunity
Solicitation number
W91ZRS-19-B-5000
Issued by
Department of the Army Connecticut Army National Guard

About this file

CEKT132211 Specifications dated 15OCT2018

View the file

Other files for this federal contract opportunity

Other files attached to CEKT132211 Parking Lot Bldg 24, newest first.
File Type Posted
OF_1419_C-19-5003_20190410_Signed.pdf PDF
W91ZRS19B5000_PP_Conf_CON_Brief.PPTX PPTX presentation
Sign_In_Roster.pdf PDF
W91ZRS-19-B-5000.pdf PDF
CEKT132211_Drawings_dated_27JUL2018.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

for the

BUILDING 24 PARKING LOT

Bradley Air National Guard Base Connecticut ANG 100 Nicholson Road ‐ East Granby, CT

Contract No. W91ZRS‐12‐D‐0031 Project No. CEKT132211

Prepared By:

AMES & WHITAKER ARCHITECTS

31 Liberty Street, Southington, Connecticut

DIVERSIFIED TECHNOLOGY CONSULTANTS

2321 Whitney Avenue, Hamden, Connecticut

VOLUME II – SPECIFICATIONS

Type B‐3 (100%) Submission

15 OCTOBER 2018

Building 24 Parking Lot Project No. CEKT132211 Bradley Air National Guard Base – East Granby, CT Type B‐3 (100%) Submission

SPECIFICATION TABLE OF CONTENTS

i

SECTION NO. TITLE

GENERAL REQUIREMENTS

01 12 00 GENERAL CONDITIONS

EXISTING CONDITIONS

02 41 19 SELECTIVE DEMOLITION

CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

ELECTRICAL

26 01 00 GENERAL REQUIREMENTS FOR ELECTRICAL WORK

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 43 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS

26 05 44 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 09 23 LIGHTING CONTROL DEVICES

26 27 26 WIRING DEVICES

26 56 13 LIGHTING POLES AND STANDARDS

26 56 19 LED EXTERIOR LIGHTING

EARTHWORK

31 1000 SITE CLEARING

31 20 00 EARTH MOVING

EXTERIOR IMPROVEMENTS

32 12 16 ASPHALT PAVING

32 17 23 PAVEMENT MARKINGS

32 92 00 TURF AND GRASSES

32 94 00 TOPSOIL

UTILITIES

33 41 00 STORM UTILITY DRAINAGE PIPING

END OF TABLE OF CONTENTS

Building 24 Parking Lot Bradley Air National Guard Base - East Granby, CT

Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

SECTION 012000 – GENERAL REQUIREMENTS

PART 1 - GENERAL

1.1 SCOPE

A. Project provides for furnishing labor, material and equipment to repair and add to the existing parking lot between buildings 24 and 26 and provide ATFP compliant standoff distance to the adjacent buildings for the Connecticut Air National Guard at Bradley Air National Guard Base, as described herein and shown on the Construction Drawings.

B. The Contractor shall be responsible for all requirements described in the contract documents and all work including that of his Subcontractor(s), if any, shall be performed in accordance with the contract documents. Contractor’s failure to become familiar with these requirements will not relieve the Contractor of responsibility to comply with the Contract requirements.

C. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among Subcontractor(s) or in establishing the extent of the work to be performed by any trade.

1.2 WORK SCHEDULING

A. Normal base work hours for the Contractor will be between the hours of 7:15 AM thru 4:00 PM, excluding Saturdays, Sundays, and Federal Holidays. If the Contractor desires to work during periods other than above, he must notify the Contracting Officer’s Representative (COR) three (3) working days in advance of his intention to work during other periods to allow assignment of additional inspection forces and for notification of fire, security and safety.

When the COR determines that they are reasonably available, he may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the Contract amount.

(Note: If applicable, at time of award this paragraph will be modified to the negotiated schedule for this project).

B. The following Federal Legal Holidays are observed by this Base:

New Year's Day 1 January Martin Luther's King's Birthday Third Monday of January President's Day Third Monday of February Memorial Day Last Monday of May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran's Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

C. NOTE: Any of the above holidays falling on a Saturday will be observed the preceding

Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

Friday, holidays falling on a Sunday will be observed on the following Monday.

D. Prior to commencing work on the job initially, resumption of work after prolonged interruption (7 calendar days or more) commencement of any warranty work, and upon completion of warranty work, the Contractor must notify the Contractor Officer (or his/her COR). When relocating to new sites, returning to sites for follow-up work on a phased work plan, notification to the COR is sufficient. Notification should be by personal contact; however, advance notification may be by telephone, email or in writing, and should be accomplished sufficiently in advance to allow scheduling of inspection forces. The above precautions are to ensure construction inspection and recording of work proceedings.

1.3 ENTRY TO BASE/ACCESS TO SITE

A. Connecticut Air National Guard is a closed Base, pursuant to Sec 21, Internal Security Act of 1950, 50 U.S.C. 797 and, as such, only those persons granted permission may enter. It is, therefore, required that control be exercised over Contractor personnel while working on the Base. To maintain this control, a listing of all Contractor personnel who will be working under the contract, must be submitted to the COR five working days prior to the start of work under the contract. The preferred method of providing this list is via email, to the contract administrator. The listing shall include, but not limited to: contract number, project number, employee name, and the estimated starting and ending date of each employee. Subsequent listings of all additions or deletions will be submitted as employees are hired or released. See Section 01501, Security Procedures for additional requirements.

B. During construction, the Contractor shall permit base personnel access to the facilities within the work area. The Contractor shall provide protection to persons and property throughout the progress of the work.

C. In the event of a declared National Emergency the COR may be required to stop work on this contract for security reasons. Contractor shall ensure the COR has a current “Off Duty” contact name and telephone number at all times to facilitate notification.

D. Contractors and subcontractors shall comply with 103 AWI 31-102.

E. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

F. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

G. AT Level I Training. This standard language is for contractor employees with an area of performance within an Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Ttraining is available at the following website: Caution-http://jko.jten.mil < Caution-http://jko.jten.mil >

H. Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC

PMs/Coordinators will provide OPSEC training or training materials to contract employees within 90 days of employees’ initial assignment to the contract and annually thereafter. General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work.

If required, initial training (OPSE 1301 – OPSEC Fundamentals) are available Caution-www.ioss.gov. Training materials can be obtained from the Wing OPSEC Officer.

1.4 UNAUTHORIZED PERSONNEL

A. The Contractor shall inform all personnel working under his jurisdiction (including sub- contractor and visiting supplier personnel) that access to areas outside of the immediate work area excluding, direct haul and access routes, contracting and Civil Engineering offices and point of supply and storage is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined. See Section 01501, Security Procedures for additional requirements.

1.5 INSPECTION OF SITE

A. The Contractor shall be responsible for the complete coordination and proper relation of the work of all trades. Reference Contract Clauses FAR 52.236-3, “Site Investigation and Conditions Affecting the Work” and FAR 52.236-8, “Other Contracts.”

B. It is recommended that prospective bidders visit the premises and thoroughly familiarize themselves with the details of the work and working conditions. It is the responsibility of all bidders to have compared the premises and the site with the Specifications and Drawings, and to have satisfied themselves as to all conditions of the premises, the existing obstructions, the actual elevations, and any other conditions affecting the execution and completion of the work prior to submission of his proposal. Reference C o n t r a c t C l a u s e FAR 5 2 . 2 3 6 -3, “ Site Investigation and Conditions Affecting the Work”.

C. No allowances or extra construction on behalf of Contractor or any subcontractor will be permitted subsequently by reason of error or oversight on the part of the sub-contractor, or on account of interferences by the activities of the owner or others. Reference Contract Clause FAR 52.236-3, “Site Investigation and Conditions Affecting the Work”.

D. For elements of the project where existing conditions are shown, all dimensions shown on the drawings are based on “as-built” record drawings and, to the extent possible, accurately represent existing conditions; however, there may be some variance between existing conditions and contract drawings. The Contractor is responsible for verifying all dimensions and for reporting to the COR any discrepancies that may affect performance of the work represented by contract drawings and specifications. Reference Contract Clause DFARS

Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

252.236-7001 “Contract Drawings, Maps, and Specifications”.

1.6 CORRELATION OF DRAWINGS, SPECIFICATIONS AND CONTRACTS

A. The specifications, Contract and the accompanying Drawings are intended to describe and provide for a complete, new and usable facility. They are intended to be complimentary and what is called for by one shall be as binding as if called for by all. The Contractor shall understand that the work herein described shall be complete in every detail, not withstanding, every item necessarily involved is not particularly mentioned, and the Contractor shall be held to provide all labor and material for the entire completion of the work intended to be described and shall not avail himself of any manifestly unintentional error or omission, should any exist.

Should any error or inconsistency appear in the Drawings or Specifications, the Contractor, before proceeding with the work, shall make mention of same to the Contracting Officer for proper adjustment, and in no case shall he proceed with the work in uncertainty. Reference Contract Clause DFARS 252.236-7001, “Contract Drawings, Maps and Specifications.” For bidding purposes, the bidder shall be responsible for the higher cost requirement, wherever contradiction in requirements occur in contract documents.

1.7 REPORT OF ERROR AND DISCREPANCIES

A. The Contractor shall be responsible for any and all discrepancies in work due to failure to obtain dimensions and investigate conditions at the building before fabrication and installation.

B. The Contractor shall bear all costs in replacing all materials and labor due to not observing the above paragraph and such replaced materials shall meet the approval of the Contracting Officer.

C. The Contractor shall promptly notify the Contracting Officer in writing of any discrepancies.

D. Reference Contract Clauses FAR 52.236-21, “Specifications and Drawings for Construction”.

FAR 52.246-12 “Inspection of Construction”, and DFARS 252.236-7001, “Contract Drawings, Maps and Specifications.”

E. Any proposed changes to the specifications by the Contractor must be submitted in writing to the Contracting Officer for approval prior to implementation.

F. Where contradictory requirements occur, the contractor shall request clarification of requirements from the Contracting Officer before proceeding with related work. Unless otherwise directed by COR the contractor shall be responsible for the most restrictive and highest cost requirement.

1.8 DIVISION OF WORK

A. The various divisions of the Specifications shall not be considered as negotiations of the material and labor involved. The arrangement and order of these divisions have been made for convenience only, and it is not the intent, nor shall it be so construed, a particular trade or subcontractor must perform that work included in any one division.

B. Any item mentioned under any division heading must be supplied even though it is not specified under the heading for the respective work, but is shown on the Drawings. No claims for extras arising out of real or alleged error in such arrangement or order of the various divisions will be given consideration

Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

C. Reference Contract Clause FAR 52.236-21, “Specifications and Drawings for Construction.”

1.9 METHOD OF CARRYING ON THE WORK

A. All work under the Contract shall be arranged and carried on in such a manner as to complete work in the least possible time. The Contractor shall consult with the Contracting Officer as to methods or sequence of carrying on the work. A definite program of work shall be arranged before starting. Reference Contract Clause FAR 52.236-15, “Schedules for Construction Contracts”.

B. Activities in the vicinity of this project may be kept in full or partial operation during construction. The Contractor shall coordinate with the Contracting Officer and schedule construction activities. Reference Contract Clause FAR 52.236-8, “Other Contracts”.

1.10 STANDARDS OF MANUFACTURE

A. All recognized regulatory/code standards shall be the latest published edition prior to the date of release for bid/proposal of the contract documents.

B. For purpose of establishing the standard of construction and the requirements to be met in the work of all divisions, the drawings and these specifications are based on the use of products hereinafter specified, adapted to the installation as required to meet the condition.

C. Where brand names are shown, these names are intended to describe a quality of product, and in no way are intended to limit products of equal quality. Where a Basis-of-Design product is shown, this name is intended to establish the quality and type/series of product for this project, but is not intended to limit products of equal quality and type. Therefore, products of other manufacturers may be employed for this work provided they are equivalent in the manner described, and equally adaptable to the conditions as approved by the Contracting Officer.

Reference Contract Clause FAR 52.236-5, “Materials and Workmanship”.

D. Contractor will try to meet base standard when practical.

1.11 MEANING OF APPROVED, DIRECTED, ETC.

A. “Approved”, “Directed”, “Required”, “Applicable”, or words of like or similar effect, when used in the specifications shall be interpreted to mean “Approved By”, “Directed By”, etc., the Contracting Officer unless otherwise specifically stipulated.

1.12 MISPLACED MATERIALS

A. Any material that is deposited elsewhere than areas designated as approved by the COR shall be rehandled and deposited where directed. No payment will be made for rehandling such material. The COR will notify Contractor of any noncompliance with the foregoing provisions.

1.13 COMPLIANCE WITH CODES AND REGULATIONS

A. All work shall be performed/accomplished in accordance with the applicable codes and/or ordinances in force at the time of construction. It is the Contractor’s responsibility to ensure that where EPA, CT DEP or other such regulations control the removal, handling, installation or disposal of materials, they shall be strictly adhered to whether or not specifically referenced in

Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

the construction documents.

B. Contractor shall have data sheets available at the site on any materials used to comply with OSHA and EPA. Reference Contract Clause FAR 52.223-3, “Hazardous Material Identification and Material Safety Data”.

1.14 MATERIAL TESTING BY NATIONAL LABORATORIES

A. Electrical materials and equipment shall be new and bear the UL label or be listed in UL

Electrical Construction Materials Directory or Electrical Appliance and Utilization Equipment Directory, wherever standards have been established by the agency.

B. The Contractor shall submit proof that the material or equipment, which he proposes to furnish under this specification, conforms to the standards of Underwriters’ Laboratories. The label of Underwriters Laboratories (UL) shall be accepted as conforming to this requirement.

C. In lieu of the label, the Contractor may submit a written certification from any recognized testing agency, adequately equipped and competent to perform such services, that the material or equipment has been tested and conforms to the standards, including the methods of testing used.

1.15 SUBMITTALS

A. Shop Drawings and Product Data: The Contractor shall furnish submittals in the form of manufacturer’s brochures, pamphlets, or written specifications on all items to be installed unless specifically directed otherwise by these specifications or by the Contracting Officer.

Reference Contract Clause FAR 52.236-5, “Material and Workmanship”, FAR 52.225-5, “Buy American Act-Construction Materials”, FAR 52.223-3, “Hazardous Material Identification and Material Safety Data”, and DFAR 252.227-7033, “Rights in Shop Drawings”.

B. Approval of Materials: Prior to the purchase of material, the Contractor shall submit to the

Contracting Officer, for material approval/disapproval, brochures and technical literature covering, in detail, the materials he proposes to supply. This shall include the specific catalog and model specification number designations. Submittals shall demonstrate that the item conforms to all of the requirements. No unapproved or disapproved materials shall be used.

Submittals shall be made for the items listed on AF Form 66, Schedule of Material Submittals, or equivalent. Reference Contract Clause FAR 52.236-5, “Material and Workmanship”.

1.16 PROGRESS SCHEDULE

A. The Contractor shall prepare a work progress schedule required for completion of each of the various divisions of work. The schedule shall be submitted to the Contracting Officer, in the number of copies as directed prior to start of construction. Reference Contract Clause FAR 52.236-15, “Schedules for Construction Contracts”. Construction Contracts in excess of $1 million will also be submitted on Microsoft Project 2003, electronic and paper. This schedule shall include a line item for rough inspections by government personnel as outlined in the various sections of the specifications or on the plans. A rough inspection is required prior to sealing off all insulation material to be covered by r o o f i n g . The Contractor shall request these inspections, through the COR at least 5 work days prior to the desired inspection date.

1.17 SAFETY ASSURANCE

Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

A. Compliance with Regulations. All work including the handling of hazardous materials or the disturbance or dismantling of structures containing hazardous materials shall comply with the applicable requirements of 29 CFR 1910/1926. Work involving the disturbance or dismantling of asbestos or asbestos-containing materials; the demolition of structures containing asbestos; and/or disposal and removal of asbestos, shall also comply with the requirement of 40 CFR, Part 61, Subparts A and B. ETL 1110-1-118 and DA Circular 40-83-4. All work shall comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable regulations, the most stringent shall apply.

B. Contractor Responsibility. The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work. The Government shall not be held liable for any action on the part of the Contractor, his employees or Subcontractor, which result in illness, injury or death.

C. Where an employee can fall more than 6 feet, a fall protection system must be used; 29 CFR

1926.500 stipulate where this occurs and the different types of fall arrest systems.

D. When the Contractor is working in buildings that are occupied by Government personnel, the Contractor must provide copies of all Material Safety Data Sheets (MSDS) to the COR for processing with Base Hazardous Material Pharmacy (HAZMART) prior to being allowed on the installation for use.

E. All references to protection of the site and adjacent buildings when trenching, shall include protection of all employees also.

F. Inspections, Tests and Reports. The required inspections, tests and reports made by the Contractor, Subcontractor, specially trained technicians, equipment manufacturers and other as required, shall be at the Contractor’s expense.

G. Materials and Equipment. Special facilities, devices, equipment, clothing and similar items used by the Contractor in the execution of work shall comply with applicable regulations.

H. Traffic Control Devices. The Contractor shall comply with the recommendations contained in Part 6 of the U. S. Department of Transportation, Federal Highway Administrations “Manual on Uniform Traffic Control Devices (D6. -1978) to ensure proper warnings to motorists and adequate traffic control. The Contractor shall provide all warning lights, barricades and other traffic control devices and signs.

1.18 INSPECTIONS AND TESTS

A. Inspections and tests are for the sole benefit of the Government and shall not relieve the

Contractor of the responsibility of providing quality control measures to ensure that the work strictly complies with the contract requirements. No inspection or test by the Government shall be construed as constituting or implying acceptance. Reference Contract Clause FAR 52.246- 12, “Inspection of Construction”.

1.19 QUALITY CONTROL/TESTS

A. Where work is specified to be in conformity with Standard Specifications of the American

Society for Testing Materials (ATSM), or with Federal specifications or with specifications of well-known recognized technical and trade organizations, but no tests are specifically stipulated in connection herewith, the Contractor shall furnish and pay for any tests or certifications required by the Contracting Officer to show that the proposed materials

Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

meet with the applicable requirements.

B. The Contractor shall submit a written certification from any recognized testing agency, adequately equipped and competent to perform such services, that the material or equipment has been tested and conforms to the standards, including the methods of testing used.

C. Wherever testing or analysis of material is required, such testing unless otherwise noted will be made at the Contractor’s expense.

D. Subsequent testing of those materials which fail to meet specifications will be accomplished by the Contractor at no cost to the Government.

E. Contractor Quality Control (CQC) Program: The Contractor shall provide and maintain an effective quality control program in accordance with the contract. Within ten (10) days of the award of the contract, the Contractor shall provide three (3) copies of the project CQC plan to the Contracting Officer. This document, as a minimum, shall include name and address of the independent testing agency and the responsible principal with the firm; a summary of QC tests required by the specification and to be provided by the testing agency; and typical daily reports forms to be used for this project. The plan shall also indicate organizational procedures to immediately notify the Contracting Officer or his/her representative of test results in noncompliance with the specification and recommendations on correction. The testing agency must be an independent company and not owned or partially owned by the Contractor or any relation or employee of the Contractor.

F. Samples used for testing shall be selected as specified for the various tests elsewhere in the specifications but in every case the method of selecting samples and the location for selection shall be as approved by the COR.

G. Tests shall be made in accordance with the specified testing procedures and/or methods and otherwise as required to provide compliance with all contract requirements. Tests shall be made by independent, commercial testing laboratories approved in writing by the Contracting Officer.

H. Results of all tests shall be recorded on certified test reports of the commercial testing laboratories. Reports shall include a statement that the materials tested do or do not meet the requirements of the Contract specifications. Six copies of all reports shall be forwarded directly to the Contracting Officer for approval within five (5) days of the actual performance of the test.

The testing agency shall immediately notify (verbally) the Contracting Officer of any tests, which indicate failure to meet the contract requirements.

I. Any item, for which test reports show failure to meet all Contract requirements, shall be retested as often as required to show full compliance with Contract requirements, at the Contractor’s expense.

J. Contractor will provide an emergencies plan, with Contractors to accomplish the repairs in the event of utility and/or communications emergencies.

1.20 WARRANTY

A. In addition to the specific guarantees required by the specifications for certain portions of the work to be performed under this Contract, the Contractor shall furnish a written warranty for all of the work to be performed under this Contract, against defects in materials or workmanship for a period of one (1) year from the date of final acceptance of the completed work by the

Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

Government.

B. All work including workmanship, material, and equipment (other than Government furnished equipment) shall be warranted for the full period of standard manufacturer’s warranty, but in no case shall be warranted for a period of less than one (1) year upon notice from the Contracting Officer of any failure during this warranty period, the part or parts shall be replaced promptly with new parts by and at the expense of the Contractor. Whenever the manufacturer of a piece of equipment supplied by the Contractor customarily provides a warranty covering the equipment, the Contractor shall promptly turn over such to the Contracting Officer.

C. Upon completion, the Contractor shall provide the COR with five (5) bound sets containing maintenance, repair and operating instructions and parts lists for each piece of installed equipment.

D. Reference Contract Clause FAR 52.246-12, “Inspection of Construction” and FAR 52.246-21, “Warranty of Construction”.

1.21 CUTTING AND REPAIRING

A. Unless otherwise specified hereinafter, the Contractor shall do all necessary cutting, drilling, fitting and patching of work and corresponding work that may be required to make several parts come together and fit it to receive, or be received, by work of other trades shown upon, or reasonably implied, by the Drawings and Specifications for the completed project. Reference Contract Clause FAR 52.246-12, “Inspection of Construction”.

B. The Contractor shall be held responsible for all cutting, replacement, and repairing of work that is due to faulty workmanship and which is not specifically covered by specifications for trades which are affected. He will also be held responsible for providing, without extra cost to the Government, any small incidental items which are not specifically mentioned in the specifications, but which are necessary to complete the work in accordance with the drawings, and under the general understanding that the work, when completed, shall be a finished and workmanlike job. Reference Contract Clause FAR 52.236-5, “Material and Workmanship” and FAR 52.246-12, “Inspection of Construction”.

C. See Section titled “Cutting and Patching” for additional requirements.

1.22 SITE CLEAN UP

A. The Contractor shall maintain the construction site in as clean and orderly condition as possible. All refuse and/or salvage material shall be gathered and disposed of periodically to maintain the site in this condition. All roadways, taxiways and ramp areas within the work area, or used by the Contractor, shall be swept and vacuumed daily to assure safe operation of aircraft. The cleaning operation shall be accomplished with self-propelled sweepers equipped with pick-up devices. The method of cleaning and equipment employed shall be subject to the approval of the COR. Reference Contract Clause FAR 52.235-12, “Cleaning Up”.

B. During and after periods of rain, this construction site may have a very high water table and/or areas of standing surface water. Dewatering techniques are a Contractor’s option; however, the COR shall approve the method prior to start of work.

C. Following completion of the work, the Contractor shall clean the entire area from any debris and/or excess of misplaced material due to his operation and obtain COR’s approval of this

Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

finished work. (Reference Contract Clause FAR 52.246-12, entitled “Inspection of Construction” and FAR 52.236-12, “Cleaning Up”.)

D. Prior to acceptance of the facility and at such times as directed by the Contracting Officer, the

Contractor shall thoroughly clean all exposed surfaces of the building where work under this contract was completed.

E. All protective coatings, except lacquers, shall be removed from finish surfaces and the finish surfaces shall be washed and cleaned. Contractor shall be held responsible for all damaged materials, and at completion, shall replace, at his own expense, all such damaged materials.

F. Reference Contract Clause FAR 52.236-21, “Cleaning Up”, and FAR 52.246-12, “Inspection of

Construction”.

1.24 REFUSE AND SALVAGE MATERIALS

A. All refuse, debris, and construction waste shall be legally disposed of off base at the Contractor’s expense. (Reference FAR 52.236-12 “Cleaning Up.”). Accumulations of refuse on the site will not be permitted.

B. All salvage property removed and not reinstalled under this contract shall be returned to the

Government at a place on Base designated by the COR, or properly disposed of when directed by the Government. Materials that can be of consideration to have a market value must be disposed of IAW 103 AWI 32-105.

C. Non-Hazardous Solid Waste must be diverted to recycling, through appropriate means available to the Contractor, if such diversion is less than or equal to the equivalent cost of landfill or incineration.

D. Prior to contract close out the Contractor must supply a report including the following:

1. Amount (in tons) of non-hazardous solid waste, including construction and demolition debris, that is composted, mulched, recycled, reused, donated or otherwise diverted from a disposal facility.

2. Amount (in tons) of solid waste (including construction and demolition debris) transferred to a disposal facility (landfill).

1.25 STORAGE

A. No secure storage space will be provided by the Government. The Government will not be responsible for property belonging to, or under the present control of the Contractor. The Contractor is to protect his materials. An unsecured, open area will be designated by the COR for storage of construction equipment and materials during the period covered by this contract.

Reference Contract Clause FAR 52.236-10, “Operations and Storage Areas”.

B. Contractor shall construct such temporary sheds as he may require for the use of his workmen and as required for tool cribs and storage of all work under this Contract. Temporary sheds shall be confined to the space assigned by the COR. Sheds shall be of approved construction and wood floors, lighting and heat shall be provided in all parts used by workmen. Exterior of sheds shall be painted, all parts maintained in good condition throughout the life of the Contract, and at completion, all parts shall be removed and the premises cleaned up.

Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

Reference Contract Clauses FAR 52.236-10, “Operations and Storage Areas” and FAR 52.236- 12, “Cleaning Up”.

1.26 TEMPORARY FIELD OFFICES

A. As soon as practicable after award of Contract, and until final completion of the work, Contractor shall provide, maintain and later remove a suitable temporary office(s) for his own use. All field offices shall be painted on the exterior, maintained in good repair, provided with adequate heating, lighting and maintained in a clean and sanitary condition at all times.

Reference Contract Clause FAR 52.236-10, “Operations and Storage Areas”.

B. The Contractor shall provide temporary office space for exclusive use of the government inspectors, to include Contracted inspectors. This office shall include, as a minimum, a desk, a suitable chair, and access to a phone line at no additional cost to the Government.

C. The Contractor is reminded that smoking in buildings on a Government facility is prohibited.

Contractors must provide a smoking area for employees away from the main entrance of a building.

1.27 TEMPORARY TOILET FACILITIES

A. Contractor to provide, at his expense, all temporary toilet facilities. All temporary toilet facilities shall meet the requirements of health authorities having jurisdiction and shall be kept clean and in a sanitary condition at all times.

1.28 TELEPHONE AND COMMUNICATIONS SECURITY MONITORING

A. Contractor shall provide telephone services at his field office for his own use and for the use of Subcontractor and the COR. He shall make all arrangements with the telephone company and shall pay all charges for installation, services and removal.

B. All communications with DOD organizations are subject to communications security

(COMSEC) review. Contractor personnel will be aware telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, civilian Contractor personnel are advised any time they place a call to, or receive a call from, an USAF organization, they are subject to COMSEC procedures. The Contractor will assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with DOD information.

1.29 UTILITIES

A. The Contractor is responsible for installing temporary service outlets, as necessary, and charges will be made in accordance with the clause entitled “Availability and Use of Utility Services, FAR Clause 52.236-14 (b). Any expense incurred to gain access to these utilities (temporary tap-ins, etc.,) shall be the responsibility of the Contractor and all utilities shall be returned to their original configurations at the end of the contracts. No alterations to existing utilities shall be accomplished without the written permission of the Contracting Officer.

B. The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting

Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia

1.30 UTILITY INTERRUPTIONS

A. All utility shutdowns require the prior approval of the COR. Request for utility shutdown shall be made in writing at least four (4) weeks prior to the expected date of implementation.

As soon as actual shutdown date is known, the Contractor shall notify the COR in writing requesting approval at least eight (8) work days prior to requested shutdown.

B. The Contractor’s progress schedule shall include preliminary listing of all proposed shutdown dates. Every effort shall be made to make all shutdowns as brief as possible, and as limited in extent as possible.

1.32 COMPRESSED AIR

A. Contractor shall provide all compressed air used for work under this contract including temporary lines and connections. Remove all temporary lines, etc., at the completion of the work.

1.33 WEATHER PROTECTION AND TEMPORARY HEATING

A. The Contractor shall provide and maintain weather protection as may be required to properly protect all parts of the structure from damage during construction.

1.34 BLOCKING OFF BASE STREETS

A. At least two (2) hours prior to the blocking of any street, the Contractor shall advise the COR, Base Fire Department and Security Forces of his intentions, identifying the location and the estimated time of closure. No more than two streets shall be closed at any time, and the two shall be no closer than five blocks from each other.

1.35 ARCHEOLOGICAL, PALEONTOLOGICAL AND ENDANGERED SPECIES FINDS

A. Any archeological finds (evidence of human occupation) or paleontological finds (evidence of prehistoric plant or animal life) are to be reported to the COR immediately and continue work in other areas without interruption. Protect native endangered flora and fauna and notify COR of any construction activities that might threaten endangered species or their habitats.

1.36 EQUIPMENT REPORT

A. The Contractor shall furnish, upon completion of the project, “Real Property Installed Cost”, form in triplicate, of all equipment installed in the facility, and the installed cost of each item. Furthermore, the listing shall include the location of each item and nameplate date.

B. Typically, the listing shall include: air conditioners, air handling units, condensers, fans, Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

pumps, air compressors, transformers, unit heaters, regulators, direct current power supplies, latrine fixtures, motors, engines, motor or engine-driven equipment, cranes, drinking fountains, sinks, water coolers, generators, space heaters, water heaters, refrigerators, freezers, coolers, meters, gas detectors, humidifiers dehumidifier, air purifier, ovens, power units, fuel tanks, water tanks, elevators, welders, recorders, reels, scales, hydrants, intrusion detection equipment, fire detection and alarm equipment, emergency light sets, emergency eye wash, deluge showers, washers, dryers, dishwashers, bridge cranes, and like items of equipment.

C. Final payment will not be made to the Contractor until the Government has received and approved the listing. The Contractor shall use the “Real Property Installed Cost” form provided to him in the Preconstruction Contractor Guide or given to him at the Pre-performance Conference. List will be coordinated with COR to ensure completed prior to submission.

1.37 DAMAGES, REPAIRS

A. All damages by the Contractor’s operations shall be repaired, or replaced, at the Contractor’s expense, as directed by the Contracting Officer. Any Government property damaged as a result of the work, materials, or operations of the Contractor shall be restored at no additional expense to the Government.

B. All existing sidewalks, curbs, and pavement disturbed, broken or removed or otherwise damaged by the Contractor during performance of the work under this contract shall be replaced by the Contractor at his own expense. Replaced sidewalks, curbs, and pavements shall be smooth, shall blend into the existing work, and shall not present depressions or humps.

C. Reference Contract Clause FAR 52.236-9, “Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements”.

1.38 CONTRACT MANPOWER REPORTING REQUIREMENTS

A. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract at the secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: Caution-https://www.ecmra.mil Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at Caution-https://www.ecmra.mil.

1.39 AS-BUILT DRAWINGS

A. The Contractor shall keep an accurate record of all deviations from the approved design drawings and specifications which may occur in the work as actually constructed, and shall submit to the Contracting Officer, at completion of the work, complete information including descriptions, drawings, dimensions, marked prints, etc., as required for correction of the tracings to the as-built conditions. The information should be color coded for easy decoding as follows:

1. Red - when showing information added to the drawings.

2. Green - when showing information deleted from the drawings.

3. Blue and circled in blue to show notes.

Project No. CEKT132211 Type B-3 (100%) Submission

B. The red lined drawings shall be complete with any deviation in actual construction.

C. In addition to Hard Copies of Red Lines, contractor shall provide As-Built Drawings in CAD form using Auto Cad 2007 or later. Submit to Contracting Officer 2 CD’s.

1.40 MAINTENANCE OF TRAFFIC AND SAFETY

A. Where possible, the Contractor and his work shall not interfere with the normal operations of traffic, particularly emergency vehicles and equipment. Contractor is responsible for safety on the Project Site

B. The Contractor shall use only established haul routes. When materials are transported in prosecution of the work, vehicles shall not be loaded beyond the loading limit established by Federal, State or Local Law or regulation. When it is necessary to cross curbing or sidewalks, protection against damage shall be provided by the Contractor.

C. The Contractor shall provide for the free and unobstructed movement of aircraft in the air operations areas of the Base with respect to his own operations and the operations of his entire Subcontractor. The Contractor shall provide for the uninterrupted operation of visual and electronic signals (including power supplies thereto) used in the guidance of aircraft while operating to, from, and upon the airfield or Base.

D. With respect to his own operations, and those of all his Subcontractor, the Contractor shall provide marking, lighting, and other acceptable means of identifying personnel, equipment, vehicles, storage areas, and any work or condition that may be hazardous to the operation of aircraft, fire-rescue equipment, or maintenance vehicles at the Base.

E. The Contractor shall furnish, erect, and maintain weighted barricades, warning signs, and other traffic control devices as required maintaining traffic and insuring the safety of aircraft and the Contractor’s equipment. The Contractor shall make his own estimate of all labor, materials, equipment, and coincidental necessary for providing the maintenance of aircraft and vehicular traffic.

1.41 SPECIAL CONDITIONS

A. Any C o n t r a c t o r ’ s e q u i p m e n t t h a t c a u s e s o r g e n e r a t e s e l ec t r o -magnetic d i s t u r b a n c e s o r interference shall be removed from service until properly repaired. The COR may also require repositioning or removal of the equipment from the Base.

B. The Contractor shall be responsible for the coordination of his work with base communications personnel, who may be working in the area and making them aware of proposed work that may affect the work of their particular trade in process of performance.

C. All work affecting taxiway to airport must be coordinated with Bradley Airport and COR.

Taxiway must remain operational during the construction project. The contractor must develop a construction traffic coordination plan worked out with Bradley Air National Guard, minimizing taxiway shutdown to install underground communication ductwork.

1.42 COMMERCIALLY OWNED/OPERATED RADIOACTIVE SOURCES USED ON Bradley Air National Guard Base

Project No. CEKT132211 Type B-3 (100%) Submission

GENERAL REQUIREMENTS SECTION 012000

A. When using radioactive sources for soil compaction tests or stress/support studies for detection of structural/weld defects in structural framing, pressurized pipe, vessels, etc. on Bradley ANG Base, CT, the operator shall comply with the following requirements.

1. Prior to bringing the radiation generator on to Bradley Air National Guard Base, the

Contractor shall provide the Base Radiation Safety Officer (RSO) and the COR with the following information/documentation for review and approval

a. A copy of the Radioactive Source Permit with operational use conditions/restrictions with expiration date or a Certification of Exemption from licensure from the Nuclear Regulatory Commission (NRC) or Agreement State

(AS).

b. A current list of trained and qualified employees that will be using the radioactive source.

c. The name of the Permit Radiation Safety Officer (PRSO), emergency contact telephone number, and current address for each source used on Connecticut.

d. Operating instruction(s)/technical order(s) for the equipment that contains the radioactive source.

e. Designated storage location of the radioactive source if it remains on Connecticut overnight.

f. Proposed marking of the storage location if it exceeds 2mR/hr as measured at the surface of the storage container.

g. A copy of the company Radiation Safety Program.

h. Emergency Response Plan in case of an emergency for a lost or damaged source and/or over exposure incident/injury.

i. Provide the portion of their contract that identifies the location(s) of where the source will be used, for how long, and for what type use.

2. After approval is received for use of the specific radiation generator, the Contractor shall:

a. Meet proper Department of Transportation (DOT) and NRC shipping criteria to include properly filled out shipping manifest(s), container marking/labels, and placards on the vehicle as needed when transporting the source onto and around base. His documents shall also allow him to remove the source from the base also when needed. The source and the activity shall dictate which DOT and NRC regulations and CFR's are applicable.

b. These include, but not limited to 10 CFR parts 19, 20, 21, 30, 33, 34, & 71 for the permit and operation itself; 29 CFR 1910, 1096 for occupational safety and health activities when using the instrument; 40 CFR part 190 for environmental protection activities; 49 CFR parts 172 & 173 for transporting the instrument, and if the source is lost or stolen 10 CFR parts 30, 40, 50, 70, 73 & 150.

3. Limit authorized use of radio luminescent signs and markers to areas with low occupancy and where electrical power is not available except at prohibitive cost.

4. The Contractor shall not:

a. Buy radioactive materials or accept radioactive materials into the Air Force inventory without approval from the Radioisotope Committee (RIC).

b. Buy or use radium without RIC approval.

c. Buy radio luminescent signs and markers solely for energy conservation in…