W91QV123R0030.pdf

PDF 2 MB Posted

Attached to
Portable Latrines Federal contract opportunity
Solicitation number
W91QV1-23-R-0030
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Sam Houston

View the file

Other files for this federal contract opportunity

Other files attached to Portable Latrines, newest first.
File Type Posted
W91QV123R0030_AMD 01.pdf PDF
PWS_Portable Latrine IDIQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W91QV123R0030 14-Mar-2023

b. TELEPHONE NUMBER

703-806-0231

8. OFFER DUE DATE/LOCAL TIME

05:00 PM 17 Apr 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W91QV19. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

KADI-JAH SHERIDAN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0011875156

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

MICC-FORT BELVOIR

9410 JACKSON LOOP

BLDG. 1425

FORT BELVOIR VA 22060-5116

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W81XLC 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

W1C9 ARLINGTON NATL CEM

W1C9 ARLINGTON NATL CEM

1 MEMORIAL DRIVE BLDG 123D

ARLINGTON VA 22211-0000

TEL: 703-805-2425 FAX:

FAX:

TEL: (703) 806-8706 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$8,000,000

NAICS:

562991

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF50

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

INSTRUCTIONS TO OFFERORS

The award will be made to the lowest priced technically acceptable Offeror.

Proposals will be evaluated for technical acceptability but will not be ranked using the non-price Factor and Sub- Factors. In order for an Offeror to be considered for award, the proposal must receive an "Acceptable" rating in every non-price Sub-Factor. A proposal receiving a rating of "Unacceptable" in any non-price Sub-Factor will receive an "Unacceptable" rating on Technical Capability (Non-Price) and not be eligible for award.

EVALUATION FACTORS

The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.

The following factors shall be used to evaluate offers:

A. Technical Capability (Non-Price)

Sub-factor 1: Quality Control Plan Sub-factor 2: Key Personnel

B. Price

FACTORS TO BE EVALUATED

The following factors shall be used to evaluate offerors:

Factor A: Technical Capability (Non-Price) which has two (2) sub-factors 1) quality control plan and 2) key personnel Factor.

B: Price

FACTOR A. TECHNICAL CAPABILITY (NON-PRICE)

Offeror shall provide narrative as to their understanding of the specific requirements and the overall scope of work required within the PWS. The Offeror shall provide a scheduling narrative describing how they propose to accomplish the tasks outlined in the PWS, which demonstrates their capability of planning, managing, and performing the work outlined under each task. Details should cover, at a minimum:

Sub-factor 1: Quality Control Plan: The Government will evaluate how the offeror intends to monitor, inspect, and correct deficiencies for the requirements of the PWS. The offeror's QCP must be tailored to performing at Arlington National Cemetery and must address the specific tasks and standards required in the PWS. The Quality Control Plan shall clearly meet the minimum requirements outlined in 1.6.1 Quality Control. The Technical Capability (Non-Price) rating will be based on an "Acceptable" /"Unacceptable" basis. The following definitions will be used in evaluating the offeror's proposal against the technical requirement:

Rating Description Acceptable Proposal meets the requirements of the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

Sub-factor 2: Key Personnel: The Government will evaluate the degree to which the offeror's proposal demonstrates the ability to provide qualified key personnel and staff/workers in a timely manner, and a management plan for execution of all of the tasks in the PWS. The offeror's proposal must describe a management approach to oversee tasks to ensure quality deliverables. The offeror must provide resumes for the key personnel (Contract Manager and Alternate Contract Manager). These individuals must demonstrate the operational knowledge, and relevant and sufficient experience and skill to complete the tasks outlined in the PWS. The resumes of the Contract Manager and Alternative Contract Manager submitted with proposal shall clearly meet the minimum requirements demonstrating experience and knowledge outlined in Submittals. The Technical rating will be based on an "Acceptable" / "Unacceptable" basis. The following definitions will be used in evaluating the offeror's proposal against the technical requirement:

Rating Description Acceptable Proposal meets the requirements of the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

FACTOR B. - PRICE

The Price Factor will not be scored or rated. Offered pricing response will be evaluated for completeness, price reasonableness, and pricing balance in accordance with FAR 12.602(b).

Definitions:

Completeness/Accuracy: The Offeror's proposal is in compliance with the Price Volume instructions in the

RFP.

Reasonableness: A price is reasonable if, in its nature and amount, it does not exceed that which would be incurred by a prudent person in the conduct of competitive business.

Unbalanced: Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of price

Analysis techniques: A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either part. Before the Offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

The Price proposal will include a line-by-line breakout to include fully burdened labor categories, material, and equipment costs and all applicable profit/overhead, mobilization and security costs, etc. provide equipment name, amount and type of communication modules to be used as outlined in the PWS.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 34 Each Deluxe Portable Latrines

FFP

The Contractor shall provide deluxe portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011875156

PSC CD: W085

NET AMT

0002 12 Each Handicap Portable Latrines

FFP

The Contractor shall provide handicap portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

FOB: Destination

0003 1 Each Emergency Deluxe Portable Latrines

FFP

The Contractor shall provide emergency deluxe portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

0004 1 Each Emergency Handicap Portable Latrines

FFP

The Contractor shall provide emergency handicap portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

0005 3 Each Portable Latrine Servicing

FFP

The Contractor shall provide latrine servicing IAW the attached PWS Section 5.

1001 34 Each Deluxe Portable Latrines

FFP

The Contractor shall provide deluxe portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

1002 12 Each Handicap Portable Latrines

FFP

The Contractor shall provide handicap portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

1003 1 Each Emergency Deluxe Portable Latrines

FFP

The Contractor shall provide emergency deluxe portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

1004 1 Each Emergency Handicap Portable Latrine

FFP

The Contractor shall provide emergency handicap portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

1005 3 Each Portable Latrine Servicing

FFP

The Contractor shall provide latrine servicing IAW the attached PWS Section 5.

2001 34 Each Deluxe Portable Latrines

FFP

The Contractor shall provide deluxe portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

2002 12 Each Handicap Portable Latrines

FFP

The Contractor shall provide handicap portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

2003 1 Each Emergency Deluxe Portable Latrine

FFP

The Contractor shall provide emergency deluxe portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

2004 1 Each Emergency Handicpa Portable Latrine

FFP

The Contractor shall provide emergency handicap portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

2005 3 Each Portable Latrine Servicing

FFP

The Contractor shall provide latrine servicing IAW the attached PWS Section 5.

3001 34 Each Deluxe Portable Latrines

FFP

The Contractor shall provide deluxe portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

3002 12 Each Handicap Portable Latrines

FFP

The Contractor shall provide handicap portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

3003 1 Each Emergency Deluxe Portable Latrines

FFP

The Contractor shall provide emergency deluxe portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

3004 1 Each Emergency Handicap Portable Latrine

FFP

The Contractor shall provide emergency handicap portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

3005 3 Each Portable Latrine Servicing

FFP

The Contractor shall provide latrine servicing IAW the attached PWS Section 5.

4001 34 Each Deluxe Portable Latrines

FFP

The Contractor shall provide deluxe portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

4002 12 Each Handicap Portable Latrines

FFP

The Contractor shall provide handicap portable latrines at designated times durning the performance period IAW the attached PWS Section 5..

4003 1 Each Emergency Deluxe Portable Latrines

FFP

The Contractor shall provide emergency deluxe portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

4004 1 Each Emergency Handicap Portable Latrines

FFP

The Contractor shall provide emergency handicap portable latrines at designated times durning the performance period IAW the attached PWS Section 5.

4005 3 Each Portable Latrine Servicing

FFP

The Contractor shall provide latrine servicing IAW the attached PWS Section 5.

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

1.00 500.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 4001 Destination Government Destination Government

4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government 4005 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 10-NOV-2023 34 W1C9 ARLINGTON NATL CEM

W1C9 ARLINGTON NATL CEM

1 MEMORIAL DRIVE BLDG 123D

ARLINGTON VA 22211-0000

703-805-2425

W81XLC

0002 N/A N/A N/A N/A

0003 N/A N/A N/A N/A

0004 N/A N/A N/A N/A

0005 N/A N/A N/A N/A

1001 N/A N/A N/A N/A

1002 N/A N/A N/A N/A

1003 N/A N/A N/A N/A

1004 N/A N/A N/A N/A

1005 N/A N/A N/A N/A

2001 N/A N/A N/A N/A

2002 N/A N/A N/A N/A

2003 N/A N/A N/A N/A

2004 N/A N/A N/A N/A

2005 N/A N/A N/A N/A

3001 N/A N/A N/A N/A

3002 N/A N/A N/A N/A

3003 N/A N/A N/A N/A

3004 N/A N/A N/A N/A

3005 N/A N/A N/A N/A

4001 N/A N/A N/A N/A

4002 N/A N/A N/A N/A

4003 N/A N/A N/A N/A

4004 N/A N/A N/A N/A

4005 N/A N/A N/A N/A

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

JUN 2020

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights

JUN 2020

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment

NOV 2021

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

NOV 2021

52.204-26 Covered Telecommunications Equipment or Services-- Representation.

OCT 2020

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

NOV 2021

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.211-5 Material Requirements AUG 2000 52.211-10 Commencement, Prosecution, and Completion of Work APR 1984 52.212-1 Instructions to Offerors--Commercial Products and

Commercial Services

NOV 2021

52.212-2 Evaluation - Commercial Items NOV 2021 52.212-4 Contract Terms and Conditions--Commercial Products and

Commercial Services

DEC 2022

52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Products and Commercial Services

DEC 2022

52.213-4 Terms and Conditions--Simplified Acquisitions (Other Than Commercial Products and Commercial Services)

DEC 2022

52.222-3 Convict Labor JUN 2003 52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-50 Combating Trafficking in Persons NOV 2021 52.222-55 Minimum Wages for Contractor Workers Under Executive

Order 14026

JAN 2022

52.223-3 Hazardous Material Identification And Material Safety Data FEB 2021 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-11 Ozone-Depleting Substances and High Global Warming

Potential Hydrofluorocarbons.

JUN 2016

52.223-15 Energy Efficiency in Energy-Consuming Products MAY 2020 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

JUN 2020

52.225-9 Buy American--Construction Materials OCT 2022 52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-11 Individual Surety--Pledge of Assets FEB 2021 52.228-12 Prospective Subcontractor Requests for Bonds DEC 2022 52.229-3 Federal, State And Local Taxes FEB 2013 52.229-4 Federal, State, And Local Taxes (State and Local

Adjustments)

FEB 2013

52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-16 Progress Payments NOV 2021 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-1 Performance of Work by the Contractor APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991

52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.242-15 Stop-Work Order AUG 1989 52.249-10 Default (Fixed-Price Construction) APR 1984 52.252-2 Clauses Incorporated By Reference FEB 1998 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

JAN 2023

252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

JAN 2023

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

252.219-7009 Section 8(a) Direct Award OCT 2018 252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.225-7048 Export-Controlled Items JUN 2013 252.227-7022 Government Rights (Unlimited) MAR 1979 252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.237-7009 Permits DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS

AND RECEIVING REPORTS (DEVIATION 2018-A000l) (DEC 2017)

(a) Definitions. As used in this clause-

(1) "Invoice payment" have the meaning given in section 32.001 of the Federal Acquisition Regulation.

(3) "Payment request" means any request for contract invoice payment submitted by the Contractor under this contract.

(3) "Receiving report" means the data required by the clause at 252.246-7000, Material Inspection and Receiving Report.

(b) Except as provided in paragraph (c) of this clause the Contractor shall submit payment requests and receiving reports using WA WF, in one of the following electronic formats that WA WF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.

(c) The Contractor may submit a payment request and receiving report using other than WAWF only when-

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer's determination with each request for payment;

(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);

(3) DoD makes payment for rendered health care services using the TRICARE Encounter Data System (TEDS) as the electronic format;

(4) The Governmentwide commercial purchase card is used as the method of payment, only submission of the receiving report in electronic form is required; or

(5) Submitting payment requests and receiving reports to the Supplier SelfServices (SUS) system accessible via the Wide Area WorkFlow (WAWF) website as an authorized participant in the vendor portal invoicing pilot program.

(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(End of clause)

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEVIATION 2018-A000l) (DEC 2017)

(a) Definitions. As used in this clause-

(1) "Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

(2) "Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

(3) "Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports (DEVIATION 2018-A000l) (DEC 2017).

(1) The WAWF system shall be used to electronically process vendor payment requests and receiving reports, in accordance with paragraph (c) through (g) of this clause; or

(2) The General Fund Business Enterprise System (GFEBS) Supplier SelfServices (SUS) system shall be used, in accordance with paragraph (h) of this clause, if the Contractor is an authorized participant in the GFEBS SUS invoicing pilot program.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

(Contracting Officer: Insert applicable document type(s). Note: If a "Combo" document type is identified but not supportable by the Contractor's business systems, an “Invoice" (stand-alone) and "Receiving Report" (stand-alone) document type may be used instead.)

(2) Inspection/ acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the Contracting Officer.

(Contracting Officer: Insert inspection and acceptance locations or ''Not applicable.”)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC HQ0490

Issue By DoDAAC W91QV1

Admin DoDAAC W91QV1

Inspect By DoDAAC W81XLC

Ship To Code

Ship From Code

Mark For Code

Service Approver (DoDAAC) W81XLC

Service Acceptor (DoDAAC) W81XLC

Accept at Other DoDAAC

LPO DoDAAC

DCAA Auditor DoDAAC

Other DoDAAC(s)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF Email notifications. The Contractor shall enter the e-mail address identified below in the "Send Additional Email Notifications" field of WAWF once a document is submitted in the system.

(g) WAWF Point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Kadi-Jah Sheridan, kadi-jah.l.sheridan.civ@army.mil, Contract Specialist Oswald Pascal, oswald.pascal.civ@army.mil, Contracting Officer

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(h) GFEBS SUS.

(1) Access. SUS access is obtained by logging into WAWF at https://wawf.eb.mil/ and entering the SUS Pay Official DoDAAC HQ0678 as shown on the signature page of this contract. Contractors authorized to participate in the GFEBS SUS pilot program will be seamlessly routed to the SUS vendor portal.

(2) Training. SUS Contractors participating in the GFEBS SUS invoicing pilot program shall be trained by the Army by obtaining training material and guidance at the time of initial contract award.

(3) Payment Instructions. The Contractor will be provided in SUS the purchase order (PO) with the awarded contract information needed for use in submitting receiving report information and payment requests. In the event of a conflict between this contract and the PO displayed in SUS, the contract text takes precedence. The Contractor shall identify all such conflicts to the Contracting Officer promptly in writing upon discovery.

(i) Upon receipt of the award, the Contractor shall log into SUS and verify that the SUS PO matches the awarded document or modification. The Contracting office shall be notified of any corrections needed immediately prior to time of invoice. Failure to notify the Contracting Officer in a timely manner in SUS and to ensure action is taken may result in the Contractor being unable to submit a request for payment. When the obligation data cannot be posted or corrected timely, the Contractor may submit a paper invoice and/or receiving report data to the assigned Government acceptor. This submission will serve as the official start of the Prompt Payment Act period for purposes of timely payment and interest calculation. The acceptor will notify both the Contracting Office and Accounts Payable office. Once the error is resolved, the Contractor can submit an invoice in SUS, which will post in GFEBS.

To correctly calculate any due interest, a GFEBS Invoice Processor will manually update the invoice baseline date to the invoice submission date on the paper invoice, and attach it for reference.

(ii) The Contractor shall submit receiving report information as an "Advanced Ship Notice (ASN)" for supplies or a "Confirmation" for services.

(iii) The ASN or Confirmation will be reviewed for acceptance by the designated Contracting Officer's Representative (COR).

(iv) The Contractor shall submit the payment request as an invoice created from the associated ASN or Confirmation.

(4) Manual transmission. In the event submission of receiving report data or an invoice in SUS is unavailable, the Contractor may submit a receiving report using the DD Form 250 or an invoice to the COR via facsimile or conventional mail.

(5) Points of contact.

(i) The Contractor may obtain clarification regarding invoicing in SUS from the contracting activity's SUS point of contact.

(ii) For technical SUS help, the GFEBS helpdesk may contacted via email at army.gfebs.helpdesk@mail.mil or by phone at 866-757-9771.

(End of clause)

PERFORMANCE WORK STATEMENT

UPDATED PSW 16 October 2022

Performance Work Statement For Portable Latrines

Arlington National Cemetery

Part 1

General. This is a non-personnel service contract for portable latrine rentals and associated services at Arlington National Cemetery (ANC). The Government shall not exercise any supervision or control over the contract service providers performing services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 DESCRIPTION OF SERVICES/INTRODUCTION. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to support portable latrine rentals as defined in the Performance Work Statement except for those items specified as Government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 BACKGROUND. Arlington National Cemetery is our nation's most sacred shrine and the final resting place for our most revered military and civilian leaders. ANC receives four to six million visitors per year - including visits from the President of the United States, other heads of state, family members of the deceased, and millions of tourists from around the world. ANC host several high visibility ceremonial events thought out the year and emergency situations that require porta johns. These events and emergencies range from one day to two weeks in duration. The amount of people attending these different events is as low as several hundred up to three to four thousand. In addition, ceremonial events are away from with Welcome Center and Administration facilities that can support people’s needs.

1.2.1. There are three primary facets to ANC’s mission and operations:

1.2.1.1. Honor: Those who have served our Nation with dignity and honor are laid to rest in solemn repose, treating their families with respect and compassion.

1.2.1.2. Remember: National shrine befitting the sacrifice of all those who rest here in quiet repose. Host and support ceremonies and tours in memory of those laid to rest and tell our Nation's history through those resting here.

1.2.1.3. Explore: To allow U.S. and international visitors an appreciation for America's Service-members, their sacrifices and experiences through the Army National Military Cemeteries, whether as one of the three million annual visitors or virtually through information technology. This provides ANC a unique opportunity to help educate and inspire the next generation.

1.3 OBJECTIVE. The objective of this project is to provide porta john rentals for ceremonial events and emergencies.

1.4 SCOPE. The contractor shall provide management, tools, supplies, equipment and labor to, place, and, remove standard porta johns, handicap porta johns, and hand washing stations as directed in support of each event. Both standard and handicap porta johns shall be clean with no graffiti and have a hand sanitizer and at least two (2) rolls of toilet paper. The porta johns shall be placed in such a way to present a clean, neat, and professional appearance. When requested by the Government the porta johns and hand washing stations shall be cleaned and resupplied.

1.5 PERIOD OF PERFORMANCE. The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years (to cover rental/lease and services).

The Period of Performance reads as follows:

o Base Year : 11 May 2023- 10 May 2024 o Option Year 1: 11 May 2024- 10 May 2025 o Option Year 2: 11 May 2025- 10 May 2026 o Option Year 3: 11 May 2026- 10 May 2027 o Option Year 4: 11 May 2027- 10 May 2028 o -8: 11 May 2028- 10 Nov 2028

Minimum and maximum order quantity:

o Minimum – 1 o Maximum – undefined

1.6 GENERAL INFORMATION.

1.6.1 Quality Control. Quality Control is the responsibility of the contractor. The Contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1 Contractor Inspection Requirements). The Contractor shall develop, implement and maintain an effective Quality Control System that includes a written Quality Control Plan (QCP). The QCP shall implement standardized procedure/methodology for monitoring and documenting contract performance to ensure all contract requirements are met. The Contractors’ QCP must contain a systematic approach to monitor operations to ensure acceptable services/products are provided to the Government. The QCP, at a minimum, shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; compliance with applicable codes; discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies;

procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints. The Contractor shall, upon request, provide to the Government their quality control documentation. The Contractor shall deliver the QCP to the Contracting Officer (KO) and Contracting Officer’s Representative (COR) within 5 days after contract award and within 2 working days when changes are made thereafter. After acceptance of the quality control plan the Contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to their QC system.

1.6.2 Quality Assurance. The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Federal Government Holidays. The contractor is not required to perform services on the following holidays, except when cemetery emergency requirements are needed since the cemetery will be open on all Federal Holidays.

New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October

Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th

1.6.4 Hours of Operation. ANC normal operating hours 8:00 a.m. to 5:00 p.m.

(365 days a year) including federal holidays, except when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings, unless the nature of the service requires after hours performance. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons.

When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5 Place of Performance. The work to be performed under this contract will be performed at:

Arlington National Cemetery 1 Memorial Drive Arlington Virginia 22202

(703) 614-1111

1.6.6 Type of Contract. The Government will award an Indefinite Delivery/Indefinite Quantity.

1.6.7 Security Requirements. Contractor shall provide a list of the personnel performing the work to the COR. Contractor shall submit information to the COR for its personnel (to include prime and subcontractor) for the purpose of background checks prior to the initiating the work detailed in this PWS.

Contractor personnel shall be qualified to accomplish all work promptly and satisfactorily.

1.6.7.1 iWATCH Training. Contractor and all associated sub-contractor employees will brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.

1.6.7.2 Access and General Protection/Security Policy and Procedures.

Contractor and all associated sub-contractor employees will comply with applicable installation, facilityand area commander installation/facility access and local security policies and procedures (provided by government representative).

The contractor will also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.6.7.3 Installation Access. Contractor shall carry passes issued by ANC for all vehicles entering the Cemetery, whether company-owned or employees’ private vehicles. Contractor shall maintain a current list of all vehicles and individuals issued such passes. Contractor shall provide a list of these vehicles to include make, model, color and associated license plate information to the COR at least 2 weeks before attempting to mobilize on-site and within 1 day of any changes to the list throughout the contract’s period of performance.

1.6.8 Special Qualifications. None

1.6.9 Post Award Conference/Periodic Progress Meetings. The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the contracting officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.10 Contracting Officer Representative (COR). The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.11 Key Personnel. N/A

1.6.11.1 The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8 a.m. to 4:40 p.m. Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons.

1.6.12 Identification of Contractor Employees. The Contractor shall provide ID badges. Each badge shall include, as a minimum, the company name, employee name, a photograph, the contract title, and the contract number and expiration date of the badge. An example of the Contractor issued ID badge will be provided to the ANC security office for reference.

1.6.19 Safety. The Contractor is solely liable for ensuring safe work and otherwise safe actions, behavior, and conduct while in the cemetery. It is understood the Contractor is solely responsible for following all applicable Federal and State of Virginia mandates and guidelines.

1.6.19.1 All safety violations identified by the ANC Safety Office shall be reported to the COR for the Contractor Superintendent’s disposition. In cases of life safety, the ANC Safety Office may act independently to mitigate the safety hazard and report to the COR when practical. In all cases of life safety issues, the Contractor Superintendent must report actions taken by the Contractor to the COR within one (1) hour; the COR must subsequently report the issue to the Executive Director, ANC IAW Executive Director critical incident report procedures and the ANC Safety Office. In all other cases, the Contractor Superintendent must report the safety issue to the ANC Safety Office within eight (8) hours of the incident.

Initial reporting may be done telephonically. Subsequently, all reports must be provided in writing within a time period to be determined by the ANC Safety Office IAW Army regulation.

1.6.20 Solid Waste and Recycling: The Contractor shall recycle used oil and used antifreeze in accordance with Federal and State laws and regulations.

The Contractor must provide the Government with records of the type, weight, and /recycling location for used oil and used antifreeze.

Storm Water Pollution Prevention: The Contractor shall implement measures to prevent storm water pollution in accordance with Federal and State laws and regulations, and ANC’s Municipal Separate Storm Sewer System (MS4) permit.

Permits, Taxes, Licenses, Ordinances, Laws, and Regulations: The Contractor shall maintain a solid waste management permit and air permit issued by VA Department of Environment Quality. The Contractor shall adhere, and comply with all applicable Federal, Local, and State codes, regulations, and permits.

Environmental Protection: The Contractor and Contractor representative shall manage all waste generated by any work performed under this contract in accordance with all applicable Federal (Clean Air Act; Toxic Substances Control Act; Solid Waste Disposal Act; Resource Conservation Recovery Act; Clean Water Act; Safe Drinking Water Act) and State laws and regulations; Executive Orders, or other types of rulings having the effect of the law. In case of a conflict among these laws and regulations, the most stringent law or regulation shall apply.

Solid Waste and Recycling: The Contractor shall recycle materials; such as, cardboard, paper, aluminum/metal cans, plastic, and glass jars/bottles, scrap metal, concrete, asphalt, and manage solid waste generated during the project in accordance with Federal and State laws and regulations. The Contractor must provide the Government with records of the type, weight, and disposal/recycling location for all recyclable materials and solid waste sent offsite for recycling and/or disposal.

Hazardous Waste: The Contractor shall manage hazardous waste in accordance with Federal and State laws and regulations. The contractor may not sign waste profiles or manifests on behalf of ANC. Contractor must follow ANC’s Manifest

SOP.

Hazardous Material: The Contractor shall furnish and store all hazardous materials in a storage container or other secondary containment system.

Maintenance of on-site equipment is not authorized.

Storm Water Pollution Prevention: The Contractor shall implement measures to prevent storm water pollution in accordance with Federal and State laws and regulations, and ANC’s Municipal Separate Storm Sewer System (MS4) permit. The Contractor shall furnish, install, maintain and operate erosion and sediment control measures, such as silt fences, storm drain protection, soil retention blankets, etc., prior to the start of any work that could cause pollution to state waters. The Contractor shall keep paved roads, parking lots and walkways clear of dirt, debris, and other materials. The Contractor shall remove immediately any dirt, debris, or materials deposited onto these surfaces. The Contractor must furnish and use drip pans under equipment oil and fuel tanks, and cover equipment when not in use and during rain events.

Air Quality: The Contractor shall take all necessary reasonable control measures to reduce air pollution by any material or equipment used to carry out the requirements of this contract. This includes, but is not limited to, wetting down dry materials as necessary to prevent blowing dust, and keeping waste and materials in covered containers.

1.6.21. Conduct of Personnel: The Contracting Officer may require the Contractor to remove from the job site any employee working under this contract for reasons of misconduct, security infractions, or found to be under the influence of alcohol, drugs, or other incapacitating agents.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .