ATTACHMENT 0001 CO-B-VIT_SOW_PVS-14.docx
DOCX document 51 KB Posted
- Attached to
- AN/PVS-14 MONOCULAR NIGHT VISION DEVICES (MNVDS) Federal contract opportunity
- Solicitation number
- W91CRB-24-R-5018
About this file
This document is a Statement of Work (SOW) for a Firm Fixed Price contract to provide AN/PVS-14 Monocular Night Vision Devices (MNVDs) and related support equipment to the country of Colombia under Foreign Military Sales (FMS) case CO-B-VIT. The contractor shall deliver 33 AN/PVS-14 MNVDs, 33 FAST Helmet Mount Adapters, and 33 Weapon Mount Adapters for Picatinny Rails. The contract requires adherence to applicable military and commercial standards, IUID marking requirements, packaging and shipping per ASTM D 3951-18, and a minimum 2-year no-cost warranty. Key security requirements include Antiterrorism/Force Protection training, Operations Security, and Information System Security. The related federal contract opportunity is a Request for Proposal (RFP) W91CRB-24-R-5018 under NAICS 333310 - Commercial and Service Industry Machinery Manufacturing, with an offer due date of 29 August 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| D01 W91CRB-24-R-5018.pdf | ||
| Solicitation W91CRB-24-R-5018 FINAL Q and A.docx | DOCX document | |
| Solicitation W91CRB-24-R-5018 FINAL Q and A.docx | DOCX document | |
| Solicitation W91CRB-24-R-5018 Q and A.docx | DOCX document | |
| D01 W91CRB-24-R-5018.pdf | ||
| D01 W91CRB-24-R-5018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
AN/PVS-14 Monocular Night Vision Device and Accessories
FOREIGN MILITARY SALES CASE
CO-B-VIT
Prepared by:
The Security Assistance Management Directorate (SAMD), AMSEL-LCS-RC
Aberdeen Proving Ground, MD
1.0 INTRODUCTION
This is a Firm Fixed Price (FFP) contract to provide AN/PVS-14 Monocular Night Vision Device (MNVD) and Support Equipment to the country of Colombia in support of this Foreign Military Sales (FMS) case CO-B-VIT. The word Government in this document refers to the United States Government. The word country in this document refers to the FMS Customer.
2.0 APPLICABLE DOCUMENTS AND STANDARDS
2.1.1 Military Standards
MIL-STD-130N with Change 1 Identification marking of U.S. Military Property MIL-STD-129R Military Marking for Shipment and Storage MIL-STD-882E System Safety DOD Directive 5230.11 Disclosure of Classified Military Information to Foreign Governments and International Organizations DOD 8570.01-M Information Assurance Workforce Improvement Program AR 525-13 Antiterrorism AR 530-1 Operations Security
2.1.2 Commercial Standards
ISPM 15 Guidelines for Regulating Wood Packaging Material In International Trade ASTM D 3951-18 Standard Practice for Commercial Packaging
3.0 REQUIREMENTS
3.1 Requirements for Hardware. Required hardware shall meet specifications and performance criteria stated in the contractor’s commercial standards and this SOW. Hardware shall be delivered according to the specified models, descriptions, and quantities listed below.
3.1.1 AN/PVS-14 Monocular Night Vision Device (LOA Line #001). The contractor shall deliver thirty-three (33) AN/PVS-14 Monocular Night Vision Device, each consisting of the following:
QTY ITEM DESCRIPTION
1 AN/PVS-14 (F6015) Monocular Night Vision Device (MNVD), White Phosphor (F9415) - Gen III Night Vision Image Intensifier Tube MX11769, Figure of Merit (FOM) not to exceed 1800 and Auto Gated, includes:
1 Operator's Manual 1 Head/Helmet Mount Adapter (J-arm) 1 Neck Cord 1 Eye-Cup 1 Front Lents Cap 1 Demist Shield 1 Sacrificial Filter for Objective Lens
3.1.2 FAST Helmet Mount Adapter. The contractor shall deliver thirty-three (33) FAST Helmet Mount Adapters (LOA Line #002a).
3.1.3 Weapon Mount Adapter for Picatinny Rail (MIL-STD- 1913/STANAG 2324). The contractor shall deliver thirty-three (33) Weapon Mount Adapter for Picatinny Rail (MIL-STD- 1913/STANAG 2324) (LOA Line #002b).
3.2 Item Unique Identification (IUID).
The Contractor shall mark all contract deliverables in accordance with DFARS clause 252.211-7003 and the following requirements:
3.2.1 IUID Marking.
3.2.1.1 New items: The contractor shall provide IUID, or DoD recognized unique identification equivalent as detailed in DFARS 252.211-7003, for all items delivered with an acquisition cost of $5,000.00 or more and Government serial numbered items. For long term contracts, the Contractor shall implement IUID markings IAW MIL-STD-130N w/Ch1, dated 16 Nov 12 for any item that will exceed the $5,000.00 unit price for any range quantity or contract year. This requirement is effective throughout the life of this contract.
3.2.1.2 Repair items: Items received for repair shall be inspected for IUID markings. For items where the marking is damaged or missing the contractor shall mark the equipment with the appropriate IUID markings. For previously acquired items where the IUID markings were not required the contractor shall follow the procedures as if the item was a new item.
3.2.1.3 Commercial Markings. All other items shall have commercial markings that meet the guidelines in Department of Defense (DoD) Guide to Uniquely Identifying Items http://www.acq.osd.mil/dpap/pdi/uid/index.html.
3.2.1.4 Permanency and Legibility. The IUID marking and identification plates, tags, etching, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, groups, or kits shall be as permanent as the normal life expectancy of the item and be capable of withstanding the environment, test, cleaning, repair, and rebuild procedures specified for the item. Legibility shall be as required and verified for ready readability per MIL-STD-130N w/Ch1, dated 16 Nov 12.
3.2.1.5 Deleterious Effect. Marking of items shall be accomplished in a manner that will not adversely affect the life and utility of the item. Marking materials creating hazardous conditions shall not be used. Placement and choice of the marking shall not create hazardous conditions.
3.2.1.6 Mandatory Information Reporting for all items requiring IUID marking. The contractor shall include the National Stock Number (NSN), if the item has a NSN, the Serial Number marked on the item, if a Serial Number is marked on the item, the original part number, the current part number (only if not the same as the original part number), the current part number effective date (only if the current part number is used) and the US ARMY as the SERVICE /AGENCY/COMMAND data element in the information reported to the IUID Registry, in addition to the information required to be reported to the IUID Registry by DFARS clause 252.211-7003.
3.2.1.6.1 Wide Area Workflow (WAWF) users shall report this mandatory information to the IUID Registry by Direct submission via an X12 Ship Notice/Shipment and Billing Notice (856/857) transaction, an IUID XML transaction, an IUID flat file transaction or a WAWF IUID Material Inspection and Receiving Report/Combo UDF through the Global Exchange (GEX) Service, or manually, via the IUID Web Entry Site at http://www.bpn.gov/iuid. For WAWF users, these methods do not replace the current WAWF interaction, but are performed in addition to it after the shipment has been accepted to provide IUID data that cannot be provided via WAWF.
3.2.2 IUID Coding. IUID markings and readability requirements shall comply with MIL-STD-130N w/Ch1, dated 16 Nov 12.
3.2.2.1 Symbology markings and the order of priority for marking the hardware shall be in accordance with MIL-STD-130N w/Ch1, dated 16 Nov 12. First priority is the 2D data matrix symbol (machine readable) IUID is the minimum requirement when there are severe space limitations. The second priority is the human readable characters. The third priority is the Linear Bar Code.
3.2.2.2 If the technical data has not specified the marking location, markings shall be located such that they are visible during item use, provided that sufficient space is available, and does not interfere with equipment operations.
3.2.2.3 If items are not described by Government Product Technical Data (i.e. Commercial Items), the contractor shall maintain diagrams showing placement and description of the IUID marking and applicable installation and processing instructions for government review.
3.2.2.4 The contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the PCO or other Government representative at any time during the life of this contract. The contractor shall provide this list to the Government at the end of the contract.
3.2.3 Correction of Noncompliant Equipment and Technical Data.
3.2.3.1 The contractor shall initiate the appropriate configuration control document to correct all affected drawings/specifications which conflict with or omit the marking requirements stipulated above.
3.2.3.2 The contractor shall advise the PCO of any configuration control requirements that do not apply or when the equipment on order is defined by technical data which conflicts with or omits the marking requirements stated above. Such advice shall list the number of each deficient drawing/specification and a brief description of the deficiency.
3.2.3.3 If the item on order is defined by existing Government technical documentation and such documentation is in conflict with the requirements of this SOW, production of equipment with revised markings shall not proceed until Government approval is received by email from PCO.
3.2.4 Government Purchase of Product/Technical Data.
3.2.4.1 Specifications. Any equipment specification(s) on this contract procured by the Government shall include a requirement to mark the appropriate items with IUID.
3.2.4.2 Drawings. The contractor shall include IUID marking requirements on any engineering drawing or drawing revision procured by the Government. Location shall be depicted on the pictorial and other details presented in the notes.
3.2.5 Pricing of IUID Requirements. All efforts required by this SOW and contract, including, but not limited to, the preparation of ECPs or notification of marking deficiencies, serial number data reporting at end of contract and the actual marking of hardware, will be included in the base contract price.
3.3 Procurement New Production. The contractor shall provide email verification to the COR that all delivered hardware is supplied from new production and is of the latest configuration at time of production. The email shall include model/configuration number, date of production, and serial number of major end items delivered.
3.4 Requirements for Packaging. Packaging/packing shall be in accordance with ASTM D 3951-18, Standard Practice for Commercial Packaging, Level of Protection (LOP): Commercial, Level of Pack (LPK): Commercial, Quantity Unit Pack (QUP): 001. Marking shall be in accordance with MIL-STD-129R.
3.4.1. Wood Packaging Material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. This requirement excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
3.4.2. All WPM shall meet the requirements of International Standards for Phytosanitary Measures (ISPM) Number 15, “Regulations in Wood Packaging Material in International Trade (2009)”. DoD shipments inside and outside of the United States shall meet the requirements of ISPM 15 whenever WPM is used to ship DoD cargo.
3.4.3. All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) (IAW) American Lumber Standard Committee (ALSC), Incorporated, Wood Packaging Material Program and WPM Enforcement Regulations (see ALSC WPM).
3.4.4. All WPM shall include certification/quality markings IAW the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp.
3.4.5. Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry. The Government reserves the right to recoup from the contractor any remediation costs incurred by the Government.
3.4.6 Handling, Storage, Preservation, Packaging and Shipping. The Contractor shall establish, maintain, control and be responsible for the handling, storage, preservation, packaging and shipping to protect the quality of the materials and to prevent damage from loss, deterioration, degradation, or substitution of products.
3.5 Requirements for Quality, Final Inspection and Test. The contractor shall comply with the following requirements:
3.5.1. Sites for Inspection, Testing and Acceptance. Inspection, testing and acceptance of all equipment shall be at Origin. Inspection and testing shall be performed by the contractor. Acceptance shall be by the cognizant DCMA office/POC identified in the Wide Area Work Flow (WAWF) clause 252.232-7006.
3.5.2 Quality System. The contractor shall establish/maintain a system for the final inspection and test of all purchased items to comply with contract requirements. The Government has the right to review the contractor’s quality system and require correction whenever it, or any portion thereof, fails to meet the requirements set forth in the contract.
3.5.3 Inspection and Testing. Prior to presenting completed products to DCMA Quality Assurance Representatives (QARs) for U.S. Government Acceptance, the contractor shall ensure that all necessary inspections and Group A-test are successfully performed according to the models, descriptions, and quantities listed in paragraph 3.1, above.
3.5.4 Responsibility. The requirements of this PWS do not relieve the contractor of the responsibility to perform any additional tests or inspections required to assure product quality and compliance with drawings and specification requirements.
3.5.5 Records. The contractor shall maintain adequate records of inspections and tests to demonstrate that the final product satisfies contract requirements. The Government has the right to review these records at any time.
3.6 Requirements for Safety Engineering.
The contractor shall identify all real and potential hazards associated with the equipment ordered on this contract. This shall include any toxic substance exposure concerns to personnel during operation or maintenance to include transportation or resulting from damage to the equipment. The contractor shall also identify any special disposal procedures. The identified hazards and special disposal procedures shall be described either in the applicable Technical Manual shipped with each hardware item, or alternatively as a separate insert (in English) included with each hardware item if no Technical Manual is available for the item. All hazards that cannot be eliminated shall be reduced to lowest risk possible. Those hazards that cannot be eliminated must be presented to the COR via email, providing at a minimum the post and pre-fix hazard severity and hazard probability levels, corrective action and status, prior to government acceptance of the equipment. MIL-STD-882E shall be used in assessing system safety. The contractor shall affix applicable safety/hazardous precautionary warnings on hardware in English.
4.0 Security Requirements
4.1. Antiterrorism (AT)/Operations Security
4.1.1. AT Level 1 Training
This standard language is for contractor employees with an area of performance within an controlled installation, facility or area: All contractor employees, to include subcontractor employees, requiring access to installations, facilities and controlled access areas shall complete AT Level I Awareness Training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 60 calendar days after completion of training by all employees and subcontractor personnel. AT Level I Awareness Training is available at the following website: http://jko.jten.mil (course number “- US007”).
4.2. iWATCH Training
This standard language is for contractor employees with an area of performance within a controlled installation, facility or area: The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 60 calendar days after contract award. https://www.dhs.gov/see-something-say-something.
4.3 Security Training
Several training requirements exist for contractor personnel per DoD and Army regulation/ directives. On-site contractors may receive training briefs from the government appointed Security Manager; however, contracting companies will be required to provide training to offsite contractor employees. Training is tailored to the organization’s requirements as well as local policy. Some examples of Security training provided to integrated/embedded contractors may include, but is not limited to, the following:
• Initial Security Orientation: Online training available on the Army Learning Management System (ALMS) site, reference ALARACT 207-2103 - Initial training.
• Annual Security Orientation: Online training available on the Army Learning Management System (ALMS) site, reference ALARACT 207-2103 - Annual training requirement.
• Derivative Classification Training: Online training available via CDSE STEP, DoD 5200.01 and memo for Chief Management Officer of the Department of Defense dated 31 January 2019 - annual requirement reference.
• DA, AMC, and/or commander directed security stand-downs, e.g., ad-hoc refresher training.
For contract requiring performance of delivery in a foreign country, DFARS Clause 252.225‐7043, Antiterrorism/Force Protection for Defense Contractors Outside the US. The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non‐contingency support. The key AT requirement is for non‐local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor’ compliance with combatant commander and subordinate task force commander policies and directives.
4.4 Operations Security (OPSEC)
4.4.1. OPSEC Plan
For contracts that require a formal OPSEC program: The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer. This plan shall include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The contractor shall implement OPSEC measures as ordered by the commander. In addition, the contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1.
4.4.2. OPSEC Training
Per AR-530-1 Operations Security, the CECOM OPSEC Plan, and AR 350-1 Army Training and Leader Development contractor employees must complete Level I OPSEC Awareness training within 30 calendar days of reporting for duty and annually thereafter.
4.5 Information System Security
4.5.1 Access and General Protection/Security Policy Procedures
This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204‐9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
5.0 Requirements for Warranty.
5.1 The contractor shall provide a no-cost warranty covering workmanship and materials for all items furnished IAW this contract or any contractor-directed modification thereof. If the warranty is a commercial warranty and states that the warranty is not in effect outside the continental United States, then the wording of the warranty shall be amended so that the warranty is extended to the customer country. The warranty shall be for a minimum of two (2) years in duration, starting from the date of hardware acceptance by the U.S. Government.
5.2 Warranty Procedures. The FMS customer will notify The US Army Security Assistance Command (USASAC) New Cumberland (NC) of an equipment failure using a Supply Deficiency Report (SDR). USASAC NC will forward the SDR to the CECOM SAMD SDR action officer, and the contractor will be notified of an equipment failure. Exercising of the warranty shall commence upon contractor receipt of failure notification, at which point the warranty clock shall be stopped relative to the unit in question. Upon receipt of the failed item, the contractor shall determine if the item and failure are covered by the warranty. Upon confirmation that the contractor has repaired/replaced the item under warranty, the warranty clock shall be restarted. The FMS Customer shall be responsible for the established contractual price for items tested and found to be a "False Pull" or "No Evidence of Failure (NEOF)". The contractor shall meet or exceed a 60-day turn-around time for repairs. This time shall be from the date of receipt of the failed item by the contractor at the Contractor’s facility, to shipment from the contractor's facility. The contractor shall be responsible for the transportation cost of repaired items under warranty from the contractor’s facilities to the PN base in Israel. Transportation costs of repair items determined to be not under warranty shall be borne by the customer country.
6.0 Procurement Contracting Officer. The ACC-APG Procurement Contracting Officer (PCO) is the single point of contact within the government for funds, program direction or approval of progress payments. Only the PCO can approve or direct changes or additions to the contract.
File details come from the government source that posted it. Updated .