Attachment_1_QASP_Fire_Suppression.pdf
PDF 91 KB Posted
- Attached to
- Fire Suppression Inspection and Maintenance Federal contract opportunity
- Solicitation number
- W91CRB-18-T-0008
About this file
Fi9re Suppression QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Exhibit-A_CDRL-W91CRB-14-T-0049.pdf | ||
| W91CRB-18-T-0008_solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. Contract Number: Compliance:
B. Contractor: E: Exceeds NM: Not Met
C. Task Order: na M: Met NA: Not Applicable PM: Partially Met
Performance Requirement
Performance Standard
Method of Surveillance
Acceptable Performance Level
(APL)
Compliance: E, M, PM, NM, NA
Quarterly Inspections
Adherence to ATC Safety Protocols and industry standards
(e.g., NFPA).
COR and/or TPOC periodic assessment.
100% Compliance
Defect Notification
Documentation of defects on the inspection record with notation of violations.
Tag out of unsafe equipment.
COR and/or TPOC periodic assessment.
100% Compliance
Preventive Maintenance Service
Adherence to industry standards. Schedule provided by COR.
COR and/or TPOC periodic assessment.
100% Compliance
Repairs
As required at any time by the COR, and test site supervisor. If defect requiring urgent repair is noted during inspection/maintenanc e service, the contractor will notifiy the COR immediately after completing maint/inspection procedures. Work shall adhere to industry standards.
COR and/or TPOC periodic assessment.
100% Compliance
Estimates
Written estimates will be provided to COR within 5 working days after repair request.
COR periodic assessment.
100% Compliance
Replacement Parts/Material
Contractor will obtain all repair parts and materials for inspection, preventive maintenance, repair, and modification services. Repair parts will be available within 5 working days after COR accepts cost estimate. Modification parts will be available within 10 working days after COR accepts cost estimate.
COR periodic assessment.
100% Compliance
Documentation and Records
Produce and maintain records in accordance with industry standards (e.g., NFPA).
Documentation of scheduled inspections and PMs will be provided to the COR within 5 working days after the end of the period.
Documentation of repair and modification services will be provided to the COR within five (5) working days after the completion of the action.
COR and/or TPOC periodic assessment.
100% Compliance
Summary and / or General Observations:
Recommendations:
QUALITY ASSURANCE SURVEILLANCE CHECKLIST
COMMENTS
File details come from the government source that posted it.