Revised_SOW_JO-B-YBS_2018jul31.docx
DOCX document 102 KB Posted
- Attached to
- Ruggedized Tactical Laptops and OCONUS Laptop Hardware and Software Training Federal contract opportunity
- Solicitation number
- W91CRB-18-R-5038
About this file
Reference 3.8 Requirements for Warranty. Minimum duration of warranty has been revised from 5 years to 12 months. All other verbiage remains unchanged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined_Synopsis_Solicitation_W91CRB18R5038_Revised_11JUL2018.docx | DOCX document | |
| Combined_Synopsis_Solicitation_W91CRB18R5038_.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version 1.0 31 July 2018
Statement of Work (SOW)
Ruggedized Tactical Laptops and Training
Foreign Military Sales (FMS) Case JO-B-YBS
31 July 2018
Prepared by
Security Assistance Management Directorate (SAMD)
AMSEL-LCS
Aberdeen Proving Ground, MD 21005
Table of Contents
| 1.0 Scope. | 3 |
| 2.0 Applicable Documents. | 3 |
3.0 Requirements……………..…………………………………………..……………………….3
3.1 Requirements for Hardware and Software…..………………………………………………..3
3.2 Requirements for Training Services…………………………………………………………..4
3.3 Requirements for Item Unique Identification (IUID)…………………………………………4
3.4 Procurement New Production…………………………………………………………………6
3.5 Requirements for Packaging…………………………………………………………………..6
3.6 Requirements for Final Inspection and Test…………………………………………………..7
3.7 Security and OPSEC Requirements.…………………………………………………………..7
3.8 Requirements for Warranty……….……………..………………..…………………….……..9
4.0 Procurement Contracting Officer…………………………………………………………..….9
1.0 Scope.
This document describes requirements to deliver Ruggedized Tactical Laptops and Outside Continental US (OCONUS) training under Foreign Military Sales (FMS) case JO-B-YBS for the country of Jordan. The word Government in this document refers to the United States Government. The word country in this document refers to the FMS Customer(s). This contract will be a Firm Fixed Price (FFP) contract.
2.0 Applicable Documents.
2.1 Military Standards
| MIL-STD-130N with Change 1 |
| Identification Marking of U.S. Military Property |
| MIL-STD-129R |
| Military Marking for Shipment and Storage |
| MIL-STD-882E |
| System Safety |
| DoD Directive 5230.11 |
| Disclosure of Classified Military Information to Foreign Governments and International Organizations |
| AR 525-13 |
| Antiterrorism |
| AR 530-1 |
| Operations Security |
2.2 Commercial Standards
| ISPM 15 |
| Guidelines for Regulating Wood Packaging Material in International Trade |
| ASTM D 3951-15 |
| Standard Practice for Commercial Packaging |
3.0 Requirements.
3.1 Requirements for Hardware and Software. The contractor shall provide one-hundred seventy-six (176) Getac B300G6 Ruggedized Tactical Laptops each including the following capabilities:
| a. | Intel Core i7-6500U Processor |
| b. | 13.3 Inch, Sunlight Readable Touchscreen Liquid Crystal Display (LCD) |
| c. | Super-Multi Digital Video Disc (DVD) |
| d. | Smart Card Reader |
| e. | 64-Bit Microsoft Windows 7 Professional Operating System |
| e. | 8 Giga Byte (GB) Random Access Memory (RAM) |
| f. | Opal 2.0 512 GB Solid State Drive (SSD) |
| g. | Membrane Backlit Keyboard with Multi-Language Arabic/English and Fingerprint Reader |
| h. | European Union Power Cord |
| i. | BT Wi-Fi |
| j. | Personal Computer Memory Card International Association (PCMCIA) |
| k. | Express Card 54 |
| l. | Secure Digital (SD) Card Reader |
| m. | Trusted Platform Module (TPM) 2.0 |
| n. | Operational Low Temperature Rating: -29 Degrees Centigrade |
| o. | Rated for International Protection Marking IP65. |
| p. | 5-Year Warranty |
3.2 Requirements for Training Services. The contractor shall provide hardware and software training for the above-listed Getac B300G6 Ruggedized Tactical Laptop hardware and software. Training shall be provided in a Jordan-specified facility for up to ten (10) students in Arabic for up to a four (4) day period.
3.3 Requirements for Item Unique Identification (IUID). The contractor shall mark all contract deliverables In Accordance With (IAW) DFARS clause 252.211-7003 in Section F of this contract and the following requirements.
3.3.1 IUID Marking.
3.3.1.1 New items: The contractor shall provide IUID, or DoD recognized unique identification equivalent as detailed in DFARS 252.211-7003, for all items delivered with an acquisition cost of $5,000.00 or more and Government serial numbered items. For long term contracts, the Contractor shall implement IUID markings IAW MIL-STD-130N w/Ch1, dated 16 Nov 12 for any item that will exceed the $5,000.00 unit price for any range quantity or contract year. This requirement is effective throughout the life of this contract.
3.3.1.2 Repair items: Items received for repair shall be inspected for IUID markings. For items where the marking is damaged or missing the contractor shall mark the equipment with the appropriate IUID markings. For previously acquired items where the IUID markings were not required the contractor shall follow the procedures as if the item was a new item.
3.3.1.3 Commercial Markings. All other items shall have acceptable commercial markings that meet the guidelines in Department of Defense (DoD) Guide to Uniquely Identifying Items http://www.acq.osd.mil/dpap/pdi/uid/index.html.
3.3.1.4 Permanency and Legibility. The IUID marking and identification plates, tags, etching, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, groups, or kits shall be as permanent as the normal life expectancy of the item and be capable of withstanding the environment, test, cleaning, repair, and rebuild procedures specified for the item. Legibility shall be as required and verified for ready readability per MIL-STD-130N w/Ch1, dated 16 Nov 12.
3.3.1.5 Deleterious Effect. Marking of items shall be accomplished in a manner that will not adversely affect the life and utility of the item. Marking materials creating hazardous conditions shall not be used. Placement and choice of the marking shall not create hazardous conditions.
3.3.1.6 Mandatory Information Reporting for all items requiring IUID marking. The contractor shall include the National Stock Number (NSN), if the item has a NSN, the Serial Number marked on the item, if a Serial Number is marked on the item, the original part number, the current part number (only if not the same as the original part number), the current part number effective date (only if the current part number is used) and the US ARMY as the SERVICE /AGENCY/COMMAND data element in the information reported to the IUID Registry, in addition to the information required to be reported to the IUID Registry by DFARS clause 252.211-7003.
3.3.1.6.1 Wide Area Workflow (WAWF) users shall report this mandatory information to the IUID Registry by Direct submission via an X12 Ship Notice/Shipment and Billing Notice (856/857) transaction, an IUID XML transaction, an IUID flat file transaction or a WAWF IUID Material Inspection and Receiving Report/Combo UDF through the Global Exchange (GEX) Service, or manually, via the IUID Web Entry Site at http://www.bpn.gov/iuid. For WAWF users, these methods do not replace the current WAWF interaction, but are performed in addition to it after the shipment has been accepted to provide IUID data that cannot be provided via WAWF.
3.3.2 IUID Coding. IUID markings and readability requirements shall comply with MIL-STD-130N w/Ch1, dated 16 Nov 12.
3.3.2.1 Symbology markings and the order of priority for marking the hardware shall be in accordance with MIL-STD-130N w/Ch1, dated 16 Nov 12. First priority is the 2D data matrix symbol (machine readable) IUID is the minimum requirement when there are severe space limitations. The second priority is the human readable characters. The third priority is the Linear Bar Code.
3.3.2.2 If the technical data has not specified the marking location, markings shall be located such that they are visible during item use, provided that sufficient space is available, and does not interfere with equipment operations.
3.3.2.3 If items are not described by Government Product Technical Data (i.e. Commercial Items), the contractor shall maintain diagrams showing placement and description of the IUID marking and applicable installation and processing instructions for government review.
3.3.2.4 The contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the PCO or other Government representative at any time during the life of this contract. The contractor shall provide this list to the government at the end of the contract.
3.3.3 Correction of Noncompliant Equipment and Technical Data.
3.3.3.1 The contractor shall initiate the appropriate configuration control document to correct all affected drawings/specifications which conflict with or omit the marking requirements stipulated above.
3.3.3.2 The contractor shall advise the COR if any configuration control requirements do not apply or when the equipment on order is defined by technical data which conflicts with or omits the marking requirements stated above. Such advice shall list the number of each deficient drawing/specification and a brief description of the deficiency.
3.3.3.3 If the item on order is defined by existing Government technical documentation and such documentation is in conflict with the requirements of this SOW, production of equipment with revised markings shall not proceed until Government approval is received by email from the PCO.
3.3.4 Government Purchase of Product/Technical Data.
3.3.4.1 Specifications. Any equipment specification(s) on this contract procured by the Government shall include a requirement to mark the appropriate items with IUID.
3.3.4.2 Drawings. If the Government is procuring engineering drawings or drawing revisions on this contract, the contractor shall include IUID marking requirements on each applicable drawing. Location shall be depicted on the pictorial and other details presented in the notes.
3.3.5 Pricing of IUID Requirements. All efforts required by this SOW and contract, including, but not limited to, the preparation of ECPs or notification of marking deficiencies, serial number data reporting at end of contract and the actual marking of hardware, will be included in the base contract price.
3.4 Procurement New Production. The contractor shall provide email verification to the COR that all delivered hardware is supplied from new production and is of the latest configuration at time of production. The email shall include model/configuration number, date of production, and serial number of major endi items delivered.
3.5 Requirements for Packaging. Packaging/packing shall be in accordance with ASTM D 3951-10, Standard Practice for Commercial Packaging, Level of Protection (LOP): Commercial, Level of Pack (LPK): Commercial, Quantity Unit Pack (QUP): 001. Marking shall be in accordance with MIL-STD-129R.
3.5.1. Wood Packaging Material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. This requirement excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
3.5.2. All WPM shall meet the requirements of International Standards for Phytosanitary Measures (ISPM) Number 15, “Regulations in Wood Packaging Material in International Trade (2009)”. DoD shipments inside and outside of the United States shall meet the requirements of ISPM 15 whenever WPM is used to ship DoD cargo.
3.5.3. All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) (IAW) American Lumber Standard Committee (ALSC), Incorporated, Wood Packaging Material Program and WPM Enforcement Regulations (see ALSC WPM).
3.5.4. All WPM shall include certification/quality markings IAW the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp.
3.5.5. Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry. The Government reserves the right to recoup from the contractor any remediation costs incurred by the Government.
3.5.6 Handling, Storage, Preservation, Packaging and Shipping. The Contractor shall establish, maintain, control and be responsible for the handling, storage, preservation, packaging and shipping to protect the quality of the materials and to prevent damage from loss, deterioration, degradation, or substitution of products.
3.6 Requirements for Final Inspection and Test. The contractor shall comply with the following requirements:
3.6.1. Sites for Inspection, Testing and Acceptance. Inspection, testing and acceptance of all equipment shall be at Origin. Inspection and testing shall be performed by the contractor. Acceptance shall be by the cognizant DCMA office/POC identified in the Wide Area Work Flow (WAWF) clause 252.232-7006.
3.6.2 Quality System. The contractor shall establish/maintain a system for the final inspection and test of all purchased items to comply with contract requirements. The Government has the right to review the contractor’s quality system and require correction whenever it, or any portion thereof, fails to meet the requirements set forth in the contract.
3.6.3 Inspection and Testing. The contractor shall ensure that all necessary inspections and tests are performed on completed products, and this shall include all inspections and tests which are normally performed for the equipment on order. The contractor shall at a minimum perform any inspections and tests (including visual/mechanical inspections and functional tests) required to satisfy the form, fit, and function requirements of the contract. The form, fit, and function requirements are defined by the contractor’s drawings and literature (specification documents, data sheets, acceptance test procedures, host component assembly checklist, remote antenna assembly checklist, and laptop configuration checklist.)
3.6.4 Responsibility. The requirements of this PWS do not relieve the contractor of the responsibility to perform any additional tests or inspections required to assure product quality and compliance with drawings and specification requirements.
3.6.5 Records. The contractor shall maintain adequate records of inspections and tests to demonstrate that the final product satisfies contract requirements. The Government has the right to review these records at any time.
3.7 Security and OPSEC Requirements.
3.7.1 Foreign subcontractor participation will be handled IAW AR 380-10 (Technology Transfer, Disclosure of Information & Contacts with Foreign Representatives); DoD Directive 5230.11 (Disclosure of Classified Military Information to Foreign Governments and International Organizations.)
3.7.2 Anti-Terrorism (AT)
3.7.2.1 AT Level I Training. When applicable, all contractor employees, to include subcontractor employees, requiring access to government installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date, or within 30 calendar days of applicable new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR within 30 calendar days after completion of training by all employees and subcontractor personnel IAW CDRL A001. When not applicable, the CDRL will not need to be submitted. AT level I awareness training is available at the following websites: https://Jkodirect.jten.mil or http://jko.jten.mil/courses/atl1/launch.html.
3.7.2.2 When applicable, the contractor shall make available all US based Contractor and sub-contractor employees required to travel overseas to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander with the unit Anti-Terrorism Officer (ATO) being the local point of contact.
3.7.2.3 iWATCH Training. When applicable, the contractor and all associated sub-contractors shall brief all employees with an area of performance within an Army controlled installation, facilities, area or access to an FMS controlled area on the local iWATCH program (training standards provided by the requiring activity ATO, see the following website: http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx.) This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award IAW CDRL A002. When not applicable, the CDRL will not need to be submitted.
3.7.3 Operations Security (OPSEC)
3.7.3.1 OPSEC Standard Operating Procedure (SOP)/Plan. The contractor shall develop an OPSEC SOP/Plan IAW CDRL A003 within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security. This SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure this individual becomes OPSEC Level II certified per AR 530-1.
3.7.3.2 OPSEC Training. Per AR 530-1, Operations Security, current and new contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty. All contractor employees must complete annual OPSEC awareness training (completed training submitted IAW CDRL A004.) Level 1 OPSEC training is available at http://cdse.edu/catalog/elearning/gs130.html.
3.7.3.3 Performance or Delivery in a Foreign Country. DFARS Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors Outside the US, shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor’s compliance with combatant commander and subordinate task force commander policies and directives. HSH
3.8 Requirements for Warranty. The contractor shall provide a no-cost warranty covering workmanship and materials for all items furnished IAW this contract or any modification thereof. If the warranty is a commercial warranty and states that the warranty is not in effect outside the continental United States, then the wording of the warranty shall be amended so that the warranty is extended to the final FMS customer. The warranty shall be for a minimum of 12 (12) months in duration, starting from the date of hardware acceptance by the U.S. Government.
3.8.1. This warranty shall run directly to the benefit of the FMS customer and shall not be structured so as to require any actions/administration on the part of the U.S. Government.
3.8.2. Warranty Procedures. Exercising of warranty shall commence upon contractor receipt of notification of a failure by the FMS customer to the contractor; the warranty clock shall be stopped relative to the unit in question. The contractor shall be responsible for transportation cost from the FMS customer to the contractor’s facility and return to the FMS customer for warranty repairs or replacement of parts, as appropriate. The customer shall be responsible for (or pay for) shipping items to and from the contractor’s plant, plus evaluation and repair or replacement, as appropriate for out of warranty efforts.
4.0 Procurement Contracting Officer. The ACC-APG Procurement Contracting Officer (PCO) is the single point of contact within the government for funds, program direction or approval of progress payments. Only the PCO can approve or direct changes or additions to the contract.
CDRLS
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A | |
| TDP | |
| TM | |
| OTHER | MGMT |
D. SYSTEM/ITEM
Communications and Electronics Equipment
E. CONTRACTOR/PR NO.
F. CONTRACTOR
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A001 |
| Operations Security (OPSEC) Plan |
| Anti-Terrorism Training Certificates |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MGMT-80934C |
| SOW PARA. 3.7.2.1 |
| SAMD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASRQD |
| BLK16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| E |
13. DATE OF SUBSEQUENT SUBMISSION
| Draft |
| Final |
A
ASRQD
| Reg |
| Repro |
| 16. REMARKS |
| SAMD |
1. BLK 9: The following statement shall be included on the deliverable:
DISTRIBUTION E. Distribution authorized to DoD Components only. Date of determination is 21 May 14. Other requests for this document shall be referred to CECOM, ILSC, SAMD, APG, MD.
1. BLK 12: Submit an individual’s certificate within 35 calendar days after the employee and/or subcontractor personnel completes training. Multiple certificates may be submitted at one time.
1. BLK 13: The Government OPSEC Officer will review and approve within 30 days of submittal
15. TOTAL ▬▬▬▬►
G. PREPARED BY
Steven C. Cooper Engineer, SAMD CENTCOM
H. DATE
10 July 2018
I. APPROVED BY
Wilma Solivan Chief, SAMD CENTCOM
J. DATE
10 July 2018
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A | |
| TDP | |
| TM | |
| OTHER | MGMT |
D. SYSTEM/ITEM
Communications and Electronics Equipment
E. CONTRACTOR/PR NO.
F. CONTRACTOR
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A002 |
| Operations Security (OPSEC) Plan |
| iWatch Training Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MGMT-80934C |
| SOW PARA. 3.7.2.3 |
| SAMD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASRQD |
| BLK16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| E |
13. DATE OF SUBSEQUENT SUBMISSION
| Draft |
| Final |
ASRQD
| Reg |
| Repro |
| 16. REMARKS |
| SAMD |
1. BLK 9: The following statement shall be included on the deliverable:
DISTRIBUTION E. Distribution authorized to DoD Components only. Date of determination is 21 May 14. Other requests for this document shall be referred to CECOM, ILSC, SAMD, APG, MD.
2. BLK 12: Submit initial iWatch report 35 days after contract award for review and approval by the Government OPSEC Officer
3. BLK 13: The Government OPSEC Officer will review and approve within 30 days of submittal
4. All submittals will be in electronic format (e-mail). All submittals shall be delivered to the addressees identified by the contracting officer.
15. TOTAL ▬▬▬▬►
G. PREPARED BY
Engineer, SAMD CENTCOM
H. DATE
10 July 2018
I. APPROVED BY
Wilma Solivan Chief, SAMD CENTCOM
J. DATE
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A | |
| TDP | |
| TM | |
| OTHER | MGMT |
D. SYSTEM/ITEM
Communications and Electronics Equipment
E. CONTRACTOR/PR NO.
F. CONTRACTOR
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A003 |
| Operations Security (OPSEC) Plan |
| OPSEC SOP |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MGMT-80934C |
| SOW PARA. 3.7.3.1 |
| SAMD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| OTIME |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| E |
13. DATE OF SUBSEQUENT SUBMISSION
| Draft |
| Final |
A
| Reg |
| Repro |
| 16. REMARKS |
| SAMD |
1. BLK 4: Prepare IAW DID
2. BLK 9: The following statement shall be included on the deliverable:
DISTRIBUTION E. Distribution authorized to DoD Components only. Date of determination is 21 May 14. Other requests for this document shall be referred to CECOM, ILSC, SAMD, APG, MD.
3. BLK 12: Submit SOP/Plan NLT 90 days ADAD for review and approval by the Government OPSEC Officer. The Government OPSEC Officer will review and approve within 30 days of submittal of the OPSEC SOP.
15. TOTAL ▬▬▬▬►
G. PREPARED BY
Engineer, SAMD CENTCOM
H. DATE
10 July 2018
I. APPROVED BY
Wilma Solivan Chief, SAMD CENTCOM
J. DATE
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| C004 | |
| C | |
| TDP | |
| TM | |
| OTHER | MGMT |
D. SYSTEM/ITEM
Communications and Electronics Equipment
E. CONTRACTOR/PR NO.
F. CONTRACTOR
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A004 |
| Operations Security (OPSEC) Training |
| OPSEC Training |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MGMT-80934C |
| SOW PARA 3.7.3.2 |
| SAMD |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| OTIME |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| E |
| ASREQD |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| Draft |
| Final |
A
| Reg |
| Repro |
| 16. REMARKS |
| SAMD |
DISTRIBUTION E. Distribution authorized to DoD Components only. Date of determination is 21 May 14. Other requests for this document shall be referred to CECOM, ILSC, SAMD, APG, MD.
Employees must complete Level I OPSEC training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
Reports submitted as required.
15. TOTAL ▬▬▬▬►
G. PREPARED BY
Engineer, SAMD CENTCOM
H. DATE
10 July 2018
I. APPROVED BY
Wilma Solivan Chief, SAMD CENTCOM
J. DATE
File details come from the government source that posted it.