About this file

This document is an abstract of offers for a construction project solicitation. The solicitation was issued by the Ohio Army National Guard on August 8, 2023 for road paving and repair work at Camp James A. Garfield Joint Military Training Center. Two offers were received by the September 7, 2023 opening date from Specialized Construction Inc. and K&T Construction. The project includes a base bid and seven optional items for work on various roads around the camp. Estimated costs for each item are provided for both offers as well as an independent government estimate. Specialized Construction Inc. submitted the apparent low bid at $1,818,768.30 for the base bid and optional items. K&T Construction's bid was $2,258,250. Both bids were accompanied by bid bonds for 20% of the bid price and acknowledged no amendments to the solicitation. Award is to be determined.

View the file

Other files for this federal contract opportunity

Other files attached to OHARNG FY23 CJAG Paving Project, newest first.
File Type Posted
Bid Abstract.pdf PDF
W91364-23-B-0004_CJAG Pav Prebid sign in.pdf PDF
SOW FY23 Paving Proj.docx DOCX document
Maps FY23 Paving Proj.pdf PDF
RFI-Form.pdf PDF
Wage Determination 8-7-23.pdf PDF
OHARNG Sol W91364-23-B-0004.pdf PDF
Bid Form - CJAG Paving Repairs 2023.docx DOCX document
Instructions to Bidders.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

topmostSubform[0]: COSString{}
Page1[0]:
ISSUINGOFFICE[0]: OHARNG, UPSFO

Purchasing & Contracting Office (W91364) 22825 W. Dublin-Granville Rd.

Columbus, OH, 43235

PROJECTTITLE[0]:

Camp James A. Garfield Joint Military Training Center FY23 Road Paving/Repair Project

A7ITEM1[0]: 0001
A7ITEM2[0]: 0002
A7ITEM3[0]: 0003
A7ITEM4[0]: 0004
A7ITEM5[0]: 0005
A7ITEM6[0]: 0006
A7ITEM7[0]: 0007
A7ITEM8[0]: 0008
A7ITEM9[0]: 0009
A7ITEM10[0]: 0010
A7ITEM11[0]:
A7ITEM12[0]:
A7ITEM13[0]:
B71[0]: Base Bid Fuse and Booster Rd.
B72[0]: Base Bid Slagle Rd.
B73[0]: Base Bid S. Patrol Rd.
B74[0]: Opt #1 Newton Falls Rd.
B75[0]: Opt# 2 McCormick Rd.
B76[0]: Opt# 3 East post HQ Parking Lot
B77[0]: Opt# 4 Post HQ/DPW Parking
B78[0]: Opt# 5 Road 1A
B79[0]: Opt# 6 Road 3B
B710[0]: Opt# 7 Road 5B
B711[0]:
B712[0]: TOTAL
B713[0]:
D81[0]: Job
D82[0]: Job
D83[0]: Job
D84[0]: Job
D85[0]: Job
D86[0]: Job
D87[0]: Job
D88[0]: Job
D89[0]: Job
D810[0]: Job
D811[0]:
D812[0]:
D813[0]:
C71[0]: 1
C72[0]: 1
C73[0]: 1
C74[0]: 1
C75[0]: 1
C76[0]: 1
C77[0]: 1
C78[0]: 1
C79[0]: 1
C710[0]: 1
C711[0]:
C712[0]: 1
C713[0]:
E81[0]: 103,934.14
E82[0]: 87,862.25
E83[0]: 285,603.04
E84[0]: 499,582.19
E85[0]: 400,018.11
E86[0]: 119,238.02
E87[0]: 165,533.38
E88[0]: 50,631.03
E89[0]: 53,183.08
E810[0]: 53,183.08
E811[0]:
E812[0]: 1,818,768.30
E813[0]:
F81[0]: 103,934.14
F82[0]: 87,862.25
F83[0]: 285,603.04
F84[0]: 499,582.19
F85[0]: 400,018.11
F86[0]: 119,238.02
F87[0]: 165,533.38
F88[0]: 50,631.03
F89[0]: 53,183.08
F810[0]: 53,183.08
F811[0]:
F812[0]: 1,818,768.30
F813[0]:
E9NO11[0]: 84,500.00
E9NO12[0]: 46,750.00
E9NO13[0]: 341,500.00
E9NO14[0]: 598,000.00
E9NO15[0]: 484,000.00
E9NO16[0]: 140,000.00
E9NO17[0]: 357,000.00
E9NO18[0]: 55,000.00
E9NO19[0]: 55,000.00
E9NO110[0]: 55,000.00
E9NO111[0]:
E9NO112[0]: 2,216,750.00
E9NO113[0]:
D9NO11[0]: 84,500.00
D9NO12[0]: 46,750.00
D9NO13[0]: 341,500.00
D9NO14[0]: 598,000.00
D9NO15[0]: 484,000.00
D9NO16[0]: 140,000.00
D9NO17[0]: 357,000.00
D9NO18[0]: 55,000.00
D9NO19[0]: 55,000.00
D9NO110[0]: 55,000.00
D9NO111[0]:
D9NO112[0]: 2,216,750.00
D9NO113[0]:
D9NO21[0]: 52,814.00
D9NO22[0]: 55,003.00
D9NO23[0]: 367,321.00
D9NO24[0]: 658,823.00
D9NO25[0]: 459,016.00
D9NO26[0]: 181,014.00
D9NO27[0]: 289,882.00
D9NO28[0]: 70,202.00
D9NO29[0]: 52,922.00
D9NO210[0]: 66,962.00
D9NO211[0]:
D9NO212[0]: 2,258,250.00
D9NO213[0]:
E9NO21[0]: 52,814.00
E9NO22[0]: 55,003.00
E9NO23[0]: 367,321.00
E9NO24[0]: 658,823.00
E9NO25[0]: 459,016.00
E9NO26[0]: 181,014.00
E9NO27[0]: 289,882.00
E9NO28[0]: 70,202.00
E9NO29[0]: 52,922.00
E9NO210[0]: 66,962.00
E9NO211[0]:
E9NO212[0]: 2,258,250.00
E9NO213[0]:
AMENDMENTSISSUED[0]:
SOLICITATIONNUMBER[0]: W91364-23-B-0004
pageof[0]: 1
pages[0]: 3
NAMEANDTITLE[0]: Bradley A. Wall
OFFEROR1[0]: Specialized Construction Inc.
OFFEROR2[0]: K&T Construction
BIDSECURITY1[0]: Bond, 20% of Bid Price
BIDSECURITY2[0]: Bond, 20% of Bid Price
ACKNOWLEDGED1[0]: NA
ACKNOWLEDGED2[0]: NA
Signature1[0]:
2023-09-25T11:13:19-0400
WAHL.BRADLEY.ALAN.1078908390
DATEOPENED[0]: 09/07/2023
DATEISSUED[0]: 08/08/2023
DATESIGNED[0]: 9/25/2023
HIREDLABOR[0]: Off
WithoutProfit[0]: Off
IncludingProfit[0]: 1
form1[0]: COSString{}
#subform[0]:
ADMEN1[0]: NA
ADMEN2[0]:
ADMEN3[0]:
ADMEN4[0]:
BID1[0]: 20% of Bid Price
BID2[0]:
BID3[0]:
BID4[0]:
EST10[0]: 179,768.50
EST11[0]:
EST12[0]: 2,760,814.90
EST13[0]:
EST13[1]:
EST1[0]: 99,377.50
EST2[0]: 278,447.50
EST3[0]: 320,865.50
EST4[0]: 582,498.20
EST5[0]: 450,837.30
EST6[0]: 201,917.30
EST7[0]: 292,087.30
EST8[0]: 179,768.50
EST9[0]: 17,978.50
ESTB10[0]: 1
ESTB11[0]:
ESTB12[0]: 1
ESTB1[0]: 1
ESTB2[0]: 1
ESTB3[0]: 1
ESTB4[0]: 1
ESTB5[0]: 1
ESTB6[0]: 1
ESTB7[0]: 1
ESTB8[0]: 1
ESTB9[0]: 1
ESTCOL210[0]:
ESTCOL211[0]:
ESTCOL212[0]:
ESTCOL213[0]:
ESTCOL21[0]:
ESTCOL22[0]:
ESTCOL23[0]:
ESTCOL24[0]:
ESTCOL25[0]:
ESTCOL26[0]:
ESTCOL27[0]:
ESTCOL28[0]:
ESTCOL29[0]:
ESTCOL310[0]:
ESTCOL311[0]:
ESTCOL312[0]:
ESTCOL313[0]:
ESTCOL31[0]:
ESTCOL32[0]:
ESTCOL33[0]:
ESTCOL34[0]:
ESTCOL35[0]:
ESTCOL36[0]:
ESTCOL37[0]:
ESTCOL38[0]:
ESTCOL39[0]:
ESTCOL410[0]:
ESTCOL411[0]:
ESTCOL412[0]:
ESTCOL413[0]:
ESTCOL41[0]:
ESTCOL42[0]:
ESTCOL43[0]:
ESTCOL44[0]:
ESTCOL45[0]:
ESTCOL46[0]:
ESTCOL47[0]:
ESTCOL48[0]:
ESTCOL49[0]:
ITEMNUM10[0]: 10
ITEMNUM11[0]:
ITEMNUM12[0]:
ITEMNUM13[0]:
ITEMNUM1[0]: 1
ITEMNUM2[0]: 2
ITEMNUM3[0]: 3
ITEMNUM4[0]: 4
ITEMNUM5[0]: 5
ITEMNUM6[0]: 6
ITEMNUM7[0]: 7
ITEMNUM8[0]: 8
ITEMNUM9[0]: 9
No1[0]:
No2[0]:
No3[0]:
No4[0]:
OFFEROR1[0]:

Life Safety Goup

OFFEROR2[0]:
OFFEROR3[0]:
OFFEROR4[0]:
PROJECT[0]:

Camp James A. Garfield Joint Military Training Center FY23 Road Paving/Repair Project

SOLICITATION[0]: W91364-23-B-0004
UN1T10[0]: 179,768.50
UN1T11[0]:
UN1T12[0]: 2,760,814.90
UN1T13[0]:
UN1T1[0]: 99,377.50
UN1T2[0]: 278,447.50
UN1T3[0]: 320,865.51
UN1T4[0]: 582,498.20
UN1T5[0]: 450,837.30
UN1T6[0]: 201,917.30
UN1T7[0]: 292,087.30
UN1T8[0]: 179,768.50
UN1T9[0]: 179,768.50
UNIT10[0]: Job
UNIT11[0]:
UNIT12[0]:
UNIT13[0]:
UNIT1[0]: Job
UNIT2[0]: Job
UNIT3[0]: Job
UNIT4[0]: Job
UNIT5[0]: Job
UNIT6[0]: Job
UNIT7[0]: Job
UNIT8[0]: Job
UNIT9[0]: Job
UNITCOL410[0]:
UNITCOL411[0]:
UNITCOL412[0]:
UNITCOL413[0]:
UNITCOL41[0]:
UNITCOL42[0]:
UNITCOL43[0]:
UNITCOL44[0]:
UNITCOL45[0]:
UNITCOL46[0]:
UNITCOL47[0]:
UNITCOL48[0]:
UNITCOL49[0]:
UNITP10[0]:
UNITP11[0]:
UNITP12[0]:
UNITP13[0]:
UNITP1[0]:
UNITP2[0]:
UNITP3[0]:
UNITP4[0]:
UNITP5[0]:
UNITP6[0]:
UNITP7[0]:
UNITP8[0]:
UNITP9[0]:
UNITPRICE10[0]:
UNITPRICE11[0]:
UNITPRICE12[0]:
UNITPRICE13[0]:
UNITPRICE1[0]:
UNITPRICE2[0]:
UNITPRICE3[0]:
UNITPRICE4[0]:
UNITPRICE5[0]:
UNITPRICE6[0]:
UNITPRICE7[0]:
UNITPRICE8[0]:
UNITPRICE9[0]:
page[0]: 3
pages[0]: