Amendment_0001.pdf
PDF 27 KB Posted
- Attached to
- Sagamore Creek Maintenance Dredging Federal contract opportunity
- Solicitation number
- W912WJ16B0008
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidAbstract_16B0008.pdf | ||
| BidSummary.pdf | ||
| SITE_VISIT_attendee_list_Redacted.pdf | ||
| Solicitation_W912WJ-16-B-0008.pdf | ||
| Drawings.pdf | ||
| Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is being issued to respond to RFI's and to update the referenced Specification Sections..
All other aspects of the solicitation remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ-16-B-0008
X 9B. DATED (SEE ITEM 11)
25-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Aug-2016
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ-16-B-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
PARAGRAPH 1.1(A) OF SECTION 00 80 00 “SPECIAL CONTRACT REQUIRMENTS”
ON PAGE 40 OF THE SOLICITATION IS DELETED IN ITS ENTIRETY AND
REPLACED WITH THE FOLLOWING:
(a) Operational Restrictions:
To avoid impacts to local environmental resources and due to environmental restrictions, the dredging operations required under this contract will only be permitted between 15 November 2016 and 1 March 2017, inclusive. Therefore, the “No Dredge Season” is defined as all dates prior to 15 November 2016 and after 1 March 2017.
THE FOLLOWING ITEM “J.” IS ADDED TO THE LISTOF ITEMS IN PART 1.7.2
“CONTENTS” OF SECTION 01 57 20 “ENVIORNMENTAL PROTECTION” PAGE 4
OF THE SPECIFICATION SECTION, FOR INCLUSION IN THE ENVIRONMENTAL
PROTECTION PLAN:
j. Notification procedure for reporting adverse impacts to biological resources (e.g., fish, eelgrass) or water quality (e.g., excessive turbidity plumes, oily sheens on water surface) to the Corps. Include information concerning at what point activities will be brought to a halt until the problem is resolved.
DELETE SECTION 35 20 23 Part 3.3 – “TRANSPORTATION OF DREDGED
MATERIAL” AND REPLACE WITH THE FOLLOWING:
All nautical vessels and conveyance systems shall be operated, loaded and unloaded in such a manner as to prevent overflow, spills, leaks, or other loss of dredged materials between point of pick-up and point of deposition within the disposal area. Under no conditions shall any barge or scow transporting dredged materials have less than 1 foot of freeboard. This means there shall be at least 1 foot between the top of dredged materials and/or water inside the scow or barge and the top edge of the barge or scow. Any modifications to vessels to allow additional freeboard shall be approved by the Contracting Officer. All vessels for transporting dredged material must be inspected and approved by the Contracting Officer 7 days prior to the start of dredging. At this inspection, the Contractor shall demonstrate that all vessels are sound and capable of containing dredged material without leakage.
DELETE SECTION 35 20 23 Part 3.7.2 – “SCOWS” AND REPLACE WITH THE
FOLLOWING:
a. Failure to repair leaks or a change in the method of operation which is resulting in spillage of dredged material will result in suspension of dredging operations and require prompt repair or change of operation to prevent spillage as a prerequisite to the resumption of dredging.
b. The Contractor shall provide and maintain markings on all scows clearly indicating the draft of the scow and shall provide scow cards for each scow used on the contract work.
The scow cards shall show dimensions and volumes of individual pockets of scows and total volumes for varying depths below coaming or top of pockets. The Contractor shall also provide draft verses displacement curves for all scows. This is to enable the Contracting Officer personnel to make a determination of scow volume and corresponding drafts under partial and full load conditions. These measurements are to be made at the time of initial use of each scow. The scow volume estimates are for use in connection with disposal area monitoring studies and are not intended to be used in determining quantities dredged. At the beginning of the work and as additional scows arrive on the project, sufficient time shall be allowed by the Contractor and assistance of Contractor personnel shall be made available by the Contractor for the purpose of obtaining the measurements of each scow under various partial and full load conditions.
During the entire period of contract work, the Contractor shall provide and maintain sufficient spot or floodlights to permit the reading of the draft on the sides of scows at bow and stern from the tow boat at night and when visibility is impaired.
c. The Contractor shall achieve proper closure of pocket doors to eliminate seepage or leakage of dredged material. The use of plastic material to cover cracks in scow pockets will not be allowed.
THE FOLLOWING RESPONSES ARE FOR THE SITE VISIT REQUESTS FOR
INFORMATION:
1.) Is the Contractor required to remove any other shoals other than the one shown on the drawings?
a. No.
2.) Are there any restrictions from the lobster association regarding dredging operations?
a. All restrictions are clearly indicated in the plans and specifications and in the included permits Section 01 57 20.
3.) Will the Contractor be responsible for maintaining commercial/recreational boat traffic through the area while the project is ongoing?
a. See Section 35 20 23 Part 1.12.6.
4.) Is there a staging area near the worksite?
a. See Section 35 20 23 Part 1.12.1. No staging area is provided by the Government on this contract.
5.) Are the coordinates for the disposal site accurate as shown on the drawings?
a. See maps located at the end of Section 35 20 23.
(End of Summary of Changes)