Olmsted Locks and Dam Electrical Power Evaluation Federal contract opportunity
Solicitation number
W912QR23Q0014
Issued by
Department of the Army Corps of Engineers Engineering District Louisville

View the file

Other files for this federal contract opportunity

Other files attached to Olmsted Locks and Dam Electrical Power Evaluation, newest first.
File Type Posted
W912QR23Q0014.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIVIL/OPS/ENVIRONMENTAL BR

ATTN: ALEX J HAMILTON

600 DR M L KING JR PL RM 821

LOUISVILLE KY 40202-2236

W22W9K23333939

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR23Q0014 for Electrical Power Evaluation at Olmsted Locks and Dam is hereby modified as follows:

SEE CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912QR23Q0014

X 9B. DATED (SEE ITEM 11)

05-Jan-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Jan-2023

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912QR

FACILITY CODECODE

EMAIL:TEL:

W912QR23Q0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

a) The Statement of Work has been revised and is hereby replaced in its entirety; all changes have been marked as AMDT 0001 and are highlighted yellow.

b) Site Overview and breaker photos are hereby incorporated.

c) The quote submission date has changed from 12:00 PM ET on 19 January 2023 to 12:00 PM ET on 23 January 2023.

d) All questions concerning this solicitation shall be directed to Alex Hamilton at alex.j.hamilton@usace.army.mil

e) All Amendments must be acknowledged.

f) All other terms and conditions remain unchanged.

Quotes are due no later than 12:00 PM Eastern on 23 January 2023. Submit your quote by email to Alex J.

Hamilton at alex.j.hamilton@usace.army.mil Quotes not received by the stated date/time will not be considered.

(End of Summary of Changes) mailto:alex.j.hamilton@usace.army.mil mailto:alex.j.hamilton@usace.army.mil

The following have been added by full text:

OLMSTED POWER SYSTEM EVALUATION

STATEMENT OF WORK

AMDT 0001*********************************************************************************

1. GENERAL –

The contractor shall supply all personnel (field service engineer, technician, and/or electrician) and equipment necessary to test equipment, inspect visually and mechanically, and electrically test electrical equipment up to

12,470V at Olmsted Locks and Dam. Contractor shall supply all personnel and equipment necessary to do this work with exception of the items listed in USACE support below. These inspections and tests shall be used to evaluate the condition of the electrical power equipment at Olmsted. These electrical systems are the main power feed for the lock and an integral part of the operation of Olmsted Locks and Dam. Contractor shall schedule the inspection within 10 calendar days after receiving award and all work shall be completed within 90 calendar days after receiving award. Work will be scheduled when the dam is down and lock is inoperable to not impact river navigation. Field portion of work is expected to take less than 4 days, and all efforts shall be made to minimize the outage time.

Contractor shall inspect and test the following equipment at Olmsted:

Qty Description

1 1500 KVA 12,470V-4160 liquid filled transformer

1 Set of 5kV 3/C #1/0 cables approximately 100 feet long

1 Automatic transfer switch, 4160V, 600A

2 Sets of 5kV 3/C #1/0 cables approximately 2000 feet long

2 1000 KVA 4160V-480V/277V Liquid filled transformers

2 Fused Disconnects

3 1600 amp 480 volt breakers. Secondary injection

INSPECTION, TESTING, AND ACCEPTANCE –

US Army Corps of Engineers (USACE) personnel shall be allowed to accompany and inspect all work performed by the contractor. Contractor will comply with the EM385-1-1 safety manual while onsite.

2. USACE Support –

USACE will supply escorted access by an employee familiar with the electrical system to all of the work areas and provide carts or other equipment needed to get test equipment to the location needed. USACE support will be from

0600 – 1600 CST Monday through Thursday. 12,470V-4160V transformer is located outside on the service mound prior to entering the lock facility. Bridge, elevator, and stair access is used to reach the two (2) 4160V-480V/277V transformers and two (2) fused disconnects which are mounted on the rooftop of the control structure. 1600 Amp breakers are located inside the building in the power distribution panel. Work will progress from the 12,470V and

4160V equipment at the service mount and then proceed to the bridge and control structure.

Following items will be performed by the government in support of this contract.

• Prepare and review Activity Hazard Analysis (AHA)

• Schedule power outage

• Lockout / Tagout (LO/TO) of equipment to de-energize as needed. Unloading and transportation of test equipment.

• Provide portable 120v power supply for test equipment and lighting in work area.

• Remove and reinstall circuit breakers as needed

• Remove and reinstall panel coverings for IR scanning.

• Make cable terminations accessible and de-terminate if needed for tests.

3. INSPECTION REQUIREMENTS -

Contractor shall perform all the activities listed below and provided a written report on condition of all the items, recommendations for repair or replacement of the items, and rough order of magnitude estimates for all the repairs or recommendations. Report is due within two weeks after completion of equipment inspections. Contractor is required to attend approximately 1 hour maximum safety and LO/TO meeting prior to start of the work.

a. Transformers – Visual and Mechanical Inspection

• Compare equipment nameplate data with drawings and specifications.

• Inspect physical and mechanical condition.

• Verify removal of any shipping bracing after final placement.

• Inspect impact recorder prior to unloading, if applicable.

• Verify that alarm, control, and trip settings on temperature indicators are as specified.

• Verify that cooling fans and pumps operate correctly, and that fan and pump motors have correct overcurrent protection.

• Verify operation of all alarm, control, and trip circuits from temperature and level indicators, pressure relief device, and fault pressure relay.

• Verify correct liquid level in all tanks and bushings.

• Verify that positive pressure is maintained on nitrogen-blanketed transformers.

• Perform specific inspections and mechanical tests as recommended by manufacturer.

• Verify correct equipment grounding.

• Delete load test of LTC load tap-changer transformer is fixed tap.

• Verify tightness of accessible bolted electrical connections.

• Verify the presence of transformer surge arrestors.

b. Transformers – Electrical Test

• Perform insulation-resistance tests, winding-to-winding and each winding-to-ground.

• Perform a turns-ratio test on the currently used no-load tap-changer position, and one position above, and one below. Verify that tap setting is as specified. Verify that winding polarities are in accordance with nameplate.

• Perform insulation power-factor/dissipation-factor tests on all windings.

• Perform power-factor/dissipation-factor tests (or hot collar watts-loss tests) on bushings.

• Perform excitation-current tests.

• Measure resistance of each high-voltage winding in each no-load tap-changer position.

• Measure resistance of each low-voltage winding in the currently used no-load tap-changer position and one tap above and below.

• If core ground strap is accessible, measure core insulation resistance at 500 volts dc.

• Remove a sample of insulating liquid in accordance with ASTM D-923. Sample shall be tested for the following.

o Dielectric breakdown voltage: ASTM D-877 and/or ASTM D-1816.

o Acid neutralization number: ASTM D-374.

o Specific gravity: ASTM D-1298.

o Interfacial tension: ASTM D-971 or ASTM D-2285.

o Color: ASTM D-1500.

o Visual Condition: ASTM D-1524.

o Parts per million water: ASTM D-1533. Required on 25 kV or higher voltages and on all silicone-filled units.

o Measure dissipation factor or power factor in accordance with ASTM D-924.

• Remove a sample of insulating liquid in accordance with ASTM D-3613 and perform dissolved gas analysis in accordance with ANSI/1EEE C57.104 or ASTM D-3612.

c. Cables Medium Voltage – Visual and Mechanical Inspection

• Compare cable data with drawings and specifications.

• Inspect exposed sections of cables for physical damage.

• Inspect for shield grounding, cable support, and termination.

• If cables are terminated through window-type current transformers, make an inspection to verify that neutral and ground conductors are correctly placed and that shields are correctly terminated for operation of protective devices.

• Visually inspect jacket and insulation condition.

• Verify tightness of accessible bolted electrical connections.

d. Cables Medium Voltage – Electrical Test

• Perform a shield-continuity test on each power cable by ohmmeter method.

• Perform an insulation-resistance test utilizing a megohmmeter with a voltage output of at least 2500 volts.

• Perform a dc high-potential test on all cables in accordance with NETA-ATS.

e. Air Switches, Medium Voltage, Metal Enclosed – Visual and Mechanical Inspection

• Compare equipment nameplate data with drawings and specifications.

• Inspect physical and mechanical condition.

• Confirm correct application of manufacturer’s recommended lubricants.

• Verify appropriate anchorage and required area clearances.

• Verify appropriate equipment grounding.

• Verify correct blade alignment, blade penetration, travel stops, and mechanical operation.

• Verify that fuse sizes and types are in accordance with drawings and short-circuit and coordination studies.

• Verify that expulsion-limiting devices are in place on all holders having expulsion-type elements.

• Verify that each fuse holder has adequate mechanical support.

• Verify tightness of accessible bolted electrical connections.

• Test all interlocking systems for correct operation and sequencing.

• Verify correct phase-barrier materials and installation.

• Compare switchblade clearances with industry standards.

• Inspect all indicating and control devices for correct operation.

f. Air Switches, Medium Voltage, Metal Enclosed – Electrical Test

• Perform insulation-resistance tests on each pole.

• Perform an overpotential test on each pole with switch closed. Test each pole-to ground with all other poles grounded.

• Measure contact resistance across each switchblade and fuse holder.

• Measure fuse resistance.

• Verify heater operation.

g. Circuit Breakers Low Voltage – Visual and Mechanical Inspection

• Compare equipment nameplate data with drawings and specifications.

• Inspect physical and mechanical condition.

• Confirm correct application of manufacturer’s recommended lubricants.

• Inspect anchorage, alignment, and grounding. Inspect arc chutes. Inspect moving and

• stationary contacts for condition, wear, and alignment.

• Verify that all maintenance devices are available for servicing and operating the breaker.

• Verify that primary and secondary contact wipe and other dimensions vital to satisfactory

• operation of the breaker are correct.

• Perform all mechanical operator and contact alignment tests on both the breaker and its operating mechanism.

• Verify tightness of accessible bolted bus connections.

• Check cell fit and element alignment.

• Check racking mechanism.

h. Circuit Breakers Low Voltage – Electrical Test

• Perform a contact-resistance test.

• Perform an insulation-resistance test at 1000 volts dc from pole-to-pole and from each pole-to ground with breaker closed and across open contacts of each phase.

• Perform an insulation-resistance test at 1000 volts dc on all control wiring.

• Make adjustments for the final settings in accordance with the coordination study supplied by the owner.

• Determine minimum pickup current by secondary current injection.

• Determine long-time delay by secondary current injection.

• Determine short-time pickup and delay by secondary current injection.

• Determine ground-fault pickup and delay by secondary current injection.

• Determine instantaneous pickup value by secondary current injection.

i. Automatic Transfer Switch – Visual and Mechanical Inspection

• Verify mechanical and physical.

• Verify alignment, anchorage, required clearances and grounding.

• Verify the unit is clean.

• Verify appropriate lubrication on moving current-carrying parts and sliding surfaces.

• Verify that manual transfer warnings are attached and visible.

• Perform manual transfer operation.

• Check positive mechanical interlocking amid alternate and normal sources

j. Automatic Transfer Switch – Electrical Test

• With respect to ground execute insulation resistance tests on control wiring entirely.

• Perform a contact/pole-resistance test.

• Verify settings and operation of control devices.

• Calibrate and set all relays and timers.

• Check phasing, phase rotation and synchronized function as needed.

• Perform automatic transfer tests:

• Simulate loss of normal power.

• Return to normal power.

• Simulate loss of emergency power.

• Simulate all forms of single-phase conditions

*********************************************************************************AMDT 0001

4. LOCATION –

Onsite Support work will occur at Olmsted Locks and Dam, 634 New Dam Road, Olmsted, IL 62970. Contact

Technical Point of Contact, Steve Foster, by phone at 618-748-6402.

5. SAFETY –

a. Contractor employees shall comply with requirements of EM385-1-1.

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

b. Contractor personnel shall provide their own Arc Flash Protective Clothing and PPE for up 40 cal/cm2.

Contractor personnel shall be properly trained in Arc Flash requirements and procedures in NFPA 70E.

c. Government will supply an electrical one-line diagram for lockout/tagout purposes showing all sources of power.

d. Government will coordinate the lockout/tagout and develop the written Hazardous Energy Control

Program. Contractor is responsible for participating in the lockout tagout meetings and providing their lock in the systems.

e. Government will perform all switching and all opening of cabinets.

6. SUBMITTALS –

a. Arc Flash Training certificate for onsite employees shall be available for review prior to the lockout tagout review.

b. Trip report shall be provided after all onsite visits. Written report on condition of all the items, recommendations for repair or replacement of the items, and rough order of magnitude estimates for all the http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf repairs or recommendations. Report is due within two weeks after completion of equipment inspections.

7. INVOICE INFORMATION –

POC: Steve Foster

Address: 634 New Dam Road, Olmsted, IL 62970

Email: steven.r.foster@usace.army.mil

Phone: 618-748-6402

Method of Payment under this contract will be made via Electronic Funds Transfer (EFT).

8. ANTI TERRORISM/OPSEC –

1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative

(e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

2. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime

Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening

Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

3. Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something):

All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

4. Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in

FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements.

Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR

22.102-1(i). An initial list of verified/ eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

SUPPLEMENTAL SECURITY REQUIREMENTS

All Contractors and subcontractor employee(s) working on this contract who require access to any Louisville

District Lake Projects and Lock and Dam Projects shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12:

Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Louisville

District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results of the background investigation provided by the Louisville District Security Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the

Louisville District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.

FOR ALL LOUISVILLE DISTRICT CONTRACTS:

Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the

Louisville District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted access to Louisville District facilities.

The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working,

(2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) US Citizens Security

Access Form or Pre-Bid/Site Visit Form; each employee working on site must have a background investigation form submitted directly to the Louisville District Security Office.

The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and

Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.

Contractors shall have background checks completed for their employees annually in the case of Contracts with an initial period of performance (POP) greater than 1 year and those Contracts with Options or Modifications Which

Extend the POP beyond 1 year. For instance, if the employee was cleared in May of 2022, they shall be cleared again in May of 2023. It is the Contractor’s responsibility to ensure that each employee’s security is up to date.

Failure to comply may lead to possible removal from the project/jobsite.

The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army

Corps of Engineers (USACE), they must process the employee through the Louisville District USACE Security

Office for background purposes.

FOR CONTRACTORS REQUIRING DOD COMMON ACCESS CARDS (CAC)

The documents listed below are required:

SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). Fingerprints are https://www.e-verify.gov/ http://www.opm.gov/forms/ captured electronically at the closest Army Recruiting Station to the contractor’s home of record or at the USACE, Louisville District Security Office.

Contractor shall report any changes in personnel, or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.

Following submission of paperwork, the Louisville District Security Office will conduct an initial criminal check based upon the information provided. If there are no issues, the Louisville District Security Office will make recommendations to the PCO or their Designated Representative. The Louisville District Security Office cannot give approval due to unfavorable report(s). The Louisville District Security Office shall coordinate with Office of

Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a background investigation come back with derogatory information. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise the Contractor of the decision.

FOREIGN NATIONALS

The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign

Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters staff to complete. All Foreign Nationals must comply with the following paragraph:

In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and

Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign

Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The

Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S. passport, Certificate of U.S. Citizenship (INS

Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.

In order to assure forms are properly completed, and to minimize time delays, the Contractor is encouraged to work closely with the Louisville District Security Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work.

Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.

The Contractor shall contact the Louisville District Security Office by phone, letter, or email at the following numbers/addresses:

CELRL-SC

600 Martin Luther King Jr. Pl

Louisville, KY 40202

Charles R. Tanner, phone (502) 315-6929; email Charles.R.Tanner@usace.army.mil

James R. Milner, phone (502) 315-6916; email James.R.Milner@usace.army.mil

Jason Almodovar, phone (502) 315-6754; email Jason.Almodovar@usace.army.mil mailto:Charles.R.Tanner@usace.army.mil mailto:James.R.Milner@usace.army.mil mailto:Jason.Almodovar@usace.army.mil h2optblh Typewritten Text Security Gate Call 618-748-6403 if unable to access by buzzing in.

h2optblh Typewritten Text Lockmaster Building h2optblh Typewritten Text Maintenance Building h2optblh Typewritten Text Locked Gate h2optblh Typewritten Text New Dam Rd.

h2optblh Typewritten Text Addresses:

Lock Master's Building 634 New Dam Road Olmsted, IL 62970

Maintenance Building 656 New Dam Road Olmsted, IL 62970 h2optblh Oval h2optblh Oval h2optblh Typewritten Text 12,470/4160 Transformer and ATS h2optblh Oval h2optblh Typewritten Text 4160/480 Transformers, Disconnects, and 480v Circuit Breakers h2optblh Line h2optblh Line h2optblh Line h2optblh Typewritten Text Feeders