W912QR23Q0014.pdf

PDF 6 MB Posted

Attached to
Olmsted Locks and Dam Electrical Power Evaluation Federal contract opportunity
Solicitation number
W912QR23Q0014
Issued by
Department of the Army Corps of Engineers Engineering District Louisville

View the file

Other files for this federal contract opportunity

Other files attached to Olmsted Locks and Dam Electrical Power Evaluation, newest first.
File Type Posted
W912QR23Q0014-0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912QR23Q0014 05-Jan-2023

b. TELEPHONE NUMBER

502.315.6252

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 19 Jan 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912QR9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ALEX J HAMILTON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W22W9K23333939

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS

X

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 965194 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

OLMSTED DIVISION

WILLIAM M HUNTER

OLMSTED DIVISION 567 NEW DAM ROAD

OLMSTED IL 62970

TEL: 618-748-6434 FAX:

FAX:

TEL: 502.315.7494

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$16,500,000

NAICS:

238210

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

X

X

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF28

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912QR23Q0014

SPECIAL INSTRUCTIONS

The contractor shall supply all personnel (field service engineer, technician, and/or electrician) and equipment necessary to test equipment, inspect visually and mechanically, and electrically test electrical equipment up to 4160v at Olmsted Locks and Dam, as specified in the Statement of Work contained herein.

Location:

U.S. Army Corps of Engineers

Olmsted Locks and Dam

634 New Dam Road

Olmsted, IL 62970

618-748-6402

This procurement is 100% set-aside for Small Business, NAICS 238210 Electrical Contractors and Other Wiring

Installation Contractors (Size Standard $16,500,000).

Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.

One award will be made from this Solicitation.

Contractor shall provide Arc Flash Training Certificates for all onsite employees for review prior to the lockout tagout review.

The contract award will be based on Lowest Price to the Government, and result in a Firm Fixed Price contract.

Quotes are due no later than 19 January 2023, at 12:00 PM Eastern Time. Please submit quotes to alex.j.hamilton@usace.army.mil. Fax submittals will not be accepted.

In addition to the completed price breakout schedule, the Offeror must complete their Representations and

Certifications located in this Request For Quote (RFQ).

Questions for this RFQ shall be emailed to Alex Hamilton at alex.j.hamilton@usace.army.mil NLT 13 January 2023 at 12:00 PM Eastern Time. Questions received and answers to those questions will be posted in the Description section of the SAM.gov contract opportunity.

Completion Date: Work under this contract will begin within 10 calendar days of receiving award and complete within 90 calendar days after receiving award.

All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submitting a quote. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic

Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov.

ALERT: Effective June 29, 2018 vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in

SAM. Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity

Identifier (known as DUNS). You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective

29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA

Federal Service Desk (FSD) will activate the entity's registration.

mailto:alex.j.hamilton@usace.army.mil mailto:alex.j.hamilton@usace.army.mil http://www.sam.gov/

The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the

Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).

PLEASE NOTE: SAM is completely free of charge for both registrants and users.

All inquiries and correspondence concerning this solicitation shall be directed to the email listed above.

http://www.sam.gov/

Section SF 1449 - CONTINUATION SHEET

PRICE BREAKOUT SCHEDULE

Line

Item Description Qty Unit Cost

Unit of

Measure Total

Electrical Evaluation – Onsite

Inspection/Testing

$ Job $

Electrical Evaluation –

Report Writing 1 $ Job $

Total Amount: $

Contractor shall bid all costs associated with performing the electrical evaluation per the scope at Olmsted Locks and dam. Labor, travel expenses, and report writing shall be captured in these line items.

REPRESENTATIONS & CERTIFICATIONS

COMPANY NAME AND ADDRESS: __________________________________________

PHONE NUMBER _____________________ FAX NUMBER _____________________

EMAIL ADDRESS ________________________________________________________

BUSINESS SIZE (select one)

Large Business _____ Small Business_____ HUBZone Business_____ 8A _____

Woman-Owned ____ Service-Disabled Veteran-Owned ____

Contractor is registered with SAM: _____ YES _____ NO (See FAR 52.204-7)

TAX ID # ______________________

INDICATE Unique Entity Identifier (previously DUNS NUMBER) ___________________ (Note: See Unique

Entity Identifier (FAR 52.204-7). (This is 9-digit numeric code)

CAGE NO. ____________

OLMSTED POWER SYSTEM EVALUATION

STATEMENT OF WORK

1. GENERAL –

The contractor shall supply all personnel (field service engineer, technician, and/or electrician) and equipment necessary to test equipment, inspect visually and mechanically, and electrically test electrical equipment up to 4160v at Olmsted Locks and Dam. Contractor shall supply all personnel and equipment necessary to do this work with exception of the items listed in USACE support below. These inspections and tests shall be used to evaluate the condition of the electrical power equipment at Olmsted. These electrical systems are the main power feed for the lock and an integral part of the operation of Olmsted Locks and Dam. Contractor shall schedule the inspection within 10 calendar days after receiving award and all work shall be completed within 90 calendar days after receiving award.

Contractor shall inspect and test the following equipment at Olmsted:

Qty Description

1 1500 KVA 12470-4160 liquid filled transformer

1 Set of 5kV 3/C #1/0 cables approximately 100 feet long

1 Automatic transfer switch, 4160V, 600A

2 Sets of 5kV 3/C #1/0 cables approximately 2000 feet long

2 1000 KVA 4160-480/277 Liquid filled transformers

2 Fused Disconnects

3 1600 amp 480 volt breakers. Secondary injection

INSPECTION, TESTING, AND ACCEPTANCE –

US Army Corps of Engineers (USACE) personnel shall be allowed to accompany and inspect all work performed by the contractor. Contractor will comply with the EM385-1-1 safety manual while onsite.

2. USACE Support –

USACE will supply escorted access by an employee familiar with the electrical system to all of the work areas and provide carts or other equipment needed to get test equipment to the location needed. 12470-4160 transformer is located outside on the service mound prior to entering the lock facility. Bridge, elevator, and stair access is used to reach the 3 4160-480/277 transformers and 3 fused disconnects which are mounted on the rooftop of the control structure. 1600 Amp breakers are located inside the building in the power distribution panel. Following items will be performed by the government in support of this contract.

• Prepare and review Activity Hazard Analysis (AHA)

• Schedule power outage

• Lockout / Tagout (LO/TO) of equipment to de-energize as needed. Unloading and transportation of test equipment.

• Provide portable 120v power supply for test equipment and lighting in work area.

• Remove and reinstall circuit breakers as needed

• Remove and reinstall panel coverings for IR scanning.

• Make cable terminations accessible and de-terminate if needed for tests.

3. INSPECTION REQUIREMENTS -

Contractor shall perform all the activities listed below and provided a written report on condition of all the items, recommendations for repair or replacement of the items, and rough order of magnitude estimates for all the repairs or recommendations. Report is due within two weeks after completion of equipment inspections. Contractor is required to attend approximately 1 hour maximum safety and LO/TO meeting prior to start of the work.

a. Transformers – Visual and Mechanical Inspection

• Compare equipment nameplate data with drawings and specifications.

• Inspect physical and mechanical condition.

• Verify removal of any shipping bracing after final placement.

• Inspect impact recorder prior to unloading, if applicable.

• Verify that alarm, control, and trip settings on temperature indicators are as specified.

• Verify that cooling fans and pumps operate correctly, and that fan and pump motors have correct overcurrent protection.

• Verify operation of all alarm, control, and trip circuits from temperature and level indicators, pressure relief device, and fault pressure relay.

• Verify correct liquid level in all tanks and bushings.

• Verify that positive pressure is maintained on nitrogen-blanketed transformers.

• Perform specific inspections and mechanical tests as recommended by manufacturer.

• Verify correct equipment grounding.

• Test load tap-changer if applicable.

• Verify tightness of accessible bolted electrical connections.

• Verify the presence of transformer surge arrestors.

b. Transformers – Electrical Test

• Perform insulation-resistance tests, winding-to-winding and each winding-to-ground.

• Perform a turns-ratio test on all no-load tap-changer positions and all load tap-changer positions. Verify that tap setting is as specified. Verify that winding polarities are in accordance with nameplate.

• Perform insulation power-factor/dissipation-factor tests on all windings.

• Perform power-factor/dissipation-factor tests (or hot collar watts-loss tests) on bushings.

• Perform excitation-current tests.

• Measure resistance of each high-voltage winding in each no-load tap-changer position.

• Measure resistance of each low-voltage winding in each load tap-changer position, if applicable.

• If core ground strap is accessible, measure core insulation resistance at 500 volts dc.

• Remove a sample of insulating liquid in accordance with ASTM D-923. Sample shall be tested for the following.

o Dielectric breakdown voltage: ASTM D-877 and/or ASTM D-1816.

o Acid neutralization number: ASTM D-374.

o Specific gravity: ASTM D-1298.

o Interfacial tension: ASTM D-971 or ASTM D-2285.

o Color: ASTM D-1500.

o Visual Condition: ASTM D-1524.

o Parts per million water: ASTM D-1533. Required on 25 kV or higher voltages and on all silicone-filled units.

o Measure dissipation factor or power factor in accordance with ASTM D-924.

• Remove a sample of insulating liquid in accordance with ASTM D-3613 and perform dissolved gas analysis in accordance with ANSI/1EEE C57.104 or ASTM D-3612.

c. Cables Medium Voltage – Visual and Mechanical Inspection

• Compare cable data with drawings and specifications.

• Inspect exposed sections of cables for physical damage.

• Inspect for shield grounding, cable support, and termination.

• If cables are terminated through window-type current transformers, make an inspection to verify that neutral and ground conductors are correctly placed and that shields are correctly terminated for operation of protective devices.

• Visually inspect jacket and insulation condition.

• Verify tightness of accessible bolted electrical connections.

d. Cables Medium Voltage – Electrical Test

• Perform a shield-continuity test on each power cable by ohmmeter method.

• Perform an insulation-resistance test utilizing a megohmmeter with a voltage output of at least 2500 volts.

• Perform a dc high-potential test on all cables in accordance with NETA-ATS.

e. Air Switches, Medium Voltage, Metal Enclosed – Visual and Mechanical Inspection

• Compare equipment nameplate data with drawings and specifications.

• Inspect physical and mechanical condition.

• Confirm correct application of manufacturer’s recommended lubricants.

• Verify appropriate anchorage and required area clearances.

• Verify appropriate equipment grounding.

• Verify correct blade alignment, blade penetration, travel stops, and mechanical operation.

• Verify that fuse sizes and types are in accordance with drawings and short-circuit and coordination studies.

• Verify that expulsion-limiting devices are in place on all holders having expulsion-type elements.

• Verify that each fuse holder has adequate mechanical support.

• Verify tightness of accessible bolted electrical connections.

• Test all interlocking systems for correct operation and sequencing.

• Verify correct phase-barrier materials and installation.

• Compare switchblade clearances with industry standards.

• Inspect all indicating and control devices for correct operation.

f. Air Switches, Medium Voltage, Metal Enclosed – Electrical Test

• Perform insulation-resistance tests on each pole.

• Perform an overpotential test on each pole with switch closed. Test each pole-to ground with all other poles grounded.

• Measure contact resistance across each switchblade and fuse holder.

• Measure fuse resistance.

• Verify heater operation.

g. Circuit Breakers Low Voltage – Visual and Mechanical Inspection

• Compare equipment nameplate data with drawings and specifications.

• Inspect physical and mechanical condition.

• Confirm correct application of manufacturer’s recommended lubricants.

• Inspect anchorage, alignment, and grounding. Inspect arc chutes. Inspect moving and

• stationary contacts for condition, wear, and alignment.

• Verify that all maintenance devices are available for servicing and operating the breaker.

• Verify that primary and secondary contact wipe and other dimensions vital to satisfactory

• operation of the breaker are correct.

• Perform all mechanical operator and contact alignment tests on both the breaker and its operating mechanism.

• Verify tightness of accessible bolted bus connections.

• Check cell fit and element alignment.

• Check racking mechanism.

h. Circuit Breakers Low Voltage – Electrical Test

• Perform a contact-resistance test.

• Perform an insulation-resistance test at 1000 volts dc from pole-to-pole and from each pole-to ground with breaker closed and across open contacts of each phase.

• Perform an insulation-resistance test at 1000 volts dc on all control wiring.

• Make adjustments for the final settings in accordance with the coordination study supplied by the owner.

• Determine minimum pickup current by secondary current injection.

• Determine long-time delay by secondary current injection.

• Determine short-time pickup and delay by secondary current injection.

• Determine ground-fault pickup and delay by secondary current injection.

• Determine instantaneous pickup value by secondary current injection.

i. Automatic Transfer Switch – Visual and Mechanical Inspection

• Verify mechanical and physical.

• Verify alignment, anchorage, required clearances and grounding.

• Verify the unit is clean.

• Verify appropriate lubrication on moving current-carrying parts and sliding surfaces.

• Verify that manual transfer warnings are attached and visible.

• Perform manual transfer operation.

• Check positive mechanical interlocking amid alternate and normal sources

j. Automatic Transfer Switch – Electrical Test

• With respect to ground execute insulation resistance tests on control wiring entirely.

• Perform a contact/pole-resistance test.

• Verify settings and operation of control devices.

• Calibrate and set all relays and timers.

• Check phasing, phase rotation and synchronized function as needed.

• Perform automatic transfer tests:

• Simulate loss of normal power.

• Return to normal power.

• Simulate loss of emergency power.

• Simulate all forms of single-phase conditions

4. LOCATION –

Onsite Support work will occur at Olmsted Locks and Dam, 634 New Dam Road, Olmsted, IL 62970. Contact

Technical Point of Contact, Steve Foster, by phone at 618-748-6402.

5. SAFETY –

a. Contractor employees shall comply with requirements of EM385-1-1.

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

b. Contractor personnel shall provide their own Arc Flash Protective Clothing and PPE for up 40 cal/cm2.

Contractor personnel shall be properly trained in Arc Flash requirements and procedures in NFPA 70E.

c. Government will supply an electrical one-line diagram for lockout/tagout purposes showing all sources of power.

d. Government will coordinate the lockout/tagout and develop the written Hazardous Energy Control

Program. Contractor is responsible for participating in the lockout tagout meetings and providing their lock in the systems.

e. Government will perform all switching and all opening of cabinets.

6. SUBMITTALS –

a. Arc Flash Training certificate for onsite employees shall be available for review prior to the lockout tagout review.

b. Trip report shall be provided after all onsite visits. Written report on condition of all the items, recommendations for repair or replacement of the items, and rough order of magnitude estimates for all the repairs or recommendations. Report is due within two weeks after completion of equipment inspections.

7. INVOICE INFORMATION –

POC: Steve Foster

Address: 634 New Dam Road, Olmsted, IL 62970

Email: steven.r.foster@usace.army.mil

Phone: 618-748-6402

Method of Payment under this contract will be made via Electronic Funds Transfer (EFT).

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

8. ANTI TERRORISM/OPSEC –

1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative

(e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

2. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime

Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening

Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

3. Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something):

All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

4. Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in

FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements.

Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR

22.102-1(i). An initial list of verified/ eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

https://www.e-verify.gov/

SUPPLEMENTAL SECURITY REQUIREMENTS

All Contractors and subcontractor employee(s) working on this contract who require access to any Louisville

District Lake Projects and Lock and Dam Projects shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12:

Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Louisville

District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results of the background investigation provided by the Louisville District Security Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the

Louisville District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.

FOR ALL LOUISVILLE DISTRICT CONTRACTS:

Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the

Louisville District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted access to Louisville District facilities.

The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working,

(2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) US Citizens Security

Access Form or Pre-Bid/Site Visit Form; each employee working on site must have a background investigation form submitted directly to the Louisville District Security Office.

The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and

Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.

Contractors shall have background checks completed for their employees annually in the case of Contracts with an initial period of performance (POP) greater than 1 year and those Contracts with Options or Modifications Which

Extend the POP beyond 1 year. For instance, if the employee was cleared in May of 2022, they shall be cleared again in May of 2023. It is the Contractor’s responsibility to ensure that each employee’s security is up to date.

Failure to comply may lead to possible removal from the project/jobsite.

The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army

Corps of Engineers (USACE), they must process the employee through the Louisville District USACE Security

Office for background purposes.

FOR CONTRACTORS REQUIRING DOD COMMON ACCESS CARDS (CAC)

The documents listed below are required:

SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). Fingerprints are captured electronically at the closest Army Recruiting Station to the contractor’s home of record or at the USACE, Louisville District Security Office.

Contractor shall report any changes in personnel, or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.

Following submission of paperwork, the Louisville District Security Office will conduct an initial criminal check based upon the information provided. If there are no issues, the Louisville District Security Office will make http://www.opm.gov/forms/ recommendations to the PCO or their Designated Representative. The Louisville District Security Office cannot give approval due to unfavorable report(s). The Louisville District Security Office shall coordinate with Office of

Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a background investigation come back with derogatory information. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise the Contractor of the decision.

FOREIGN NATIONALS

The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign

Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters staff to complete. All Foreign Nationals must comply with the following paragraph:

In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and

Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign

Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The

Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S. passport, Certificate of U.S. Citizenship (INS

Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.

In order to assure forms are properly completed, and to minimize time delays, the Contractor is encouraged to work closely with the Louisville District Security Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work.

Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.

The Contractor shall contact the Louisville District Security Office by phone, letter, or email at the following numbers/addresses:

CELRL-SC

600 Martin Luther King Jr. Pl

Louisville, KY 40202

Charles R. Tanner, phone (502) 315-6929; email Charles.R.Tanner@usace.army.mil

James R. Milner, phone (502) 315-6916; email James.R.Milner@usace.army.mil

Jason Almodovar, phone (502) 315-6754; email Jason.Almodovar@usace.army.mil mailto:Charles.R.Tanner@usace.army.mil mailto:James.R.Milner@usace.army.mil mailto:Jason.Almodovar@usace.army.mil

ONE LINE DIAGRAM

4160V AND 480V

POWER DISTRIBUTION

204A205 204B206

210 211

6M

5J

LAND WALL

250A

G

2.

UPSTREAM

THE FOLLOWING ACCESSORIES SHALL BE PROVIDED WITH THE ATS:

KEY INTERLOCKS TO PREVENT OPENING OF THE FUSE COMPARTMENT DOORS UNTILL THE

c.

d.

MECHANICAL ANTI-PARALLELING

5E

5MR

3/C #1/O, 5KV

UPSTREAM

PUMP ROOM

300A

AMPS

VOLTS

MB1

6 1

11F

12" BASE SPACER

e.

REMOTE CONTROL PORT

OVERCURRENT LOCKOUT

TX1

600A SW1

RAW WATER

PUMP

15A

IS C-H RMS510 TRIP UNIT

C

D J1

AUTOMATIC TRANSFER SWITCH (ATS) SHALL BE S & C COMPANY DEAD FRONT SOURCE

TRANSFER PAD-MOUNTED SWITCHGEAR UNIT, TYPE PME-9 OR EQUAL.

PIER C

5E4H4D3M

209208

207 2

200A 200B 201

4M

RIVER WALL

PUMP #2

FEEDER #2

DAM MCC

TIE BREAKER

C

500AT500AT

1000/1150KVA

1M

1 2 3

6M 7MA

B

C

D

CT

1B

REVENUE

VS

METERING

VS

S

E

F

G

H

J

K

L

M

3G

5 6

12.47KV, 3 PH, 60 HZ

100A

4.16KV

BY CIPSC

600A

TXSW

2F

2B

2M

2G

3B

12.47-4.16KV

OA/FFA

TX

1500/1725 KVA

Z = 5.75%

SWITCHGEAR - OUTLINE

RIVERSIDE LANDSIDE

C

K C

M

150A

C

K C

M

400A

FEEDER #2

ELECTRICAL

RECEPTS #3

MIDDLE WALL

DOWNSTREAM

SS

STARTER

MIDDLE WALL

LANDSIDE

5.

SURGE ARRESTERS, ELBOW MOUNTED

REMOTE INDICATION

REMOTE SUPERVISION

REMOTE COMMUNICATION CARD

UNBALANCE DETECTION

b.

f.

g.

h.

i.

j.

a.

1.5 MVA UNIT SUBSTATION TYPE TRANSFORMER.

3M

3 #6, 5KV

PUBLIC SERVICE CO.

GENERATOR

DRAWING NO.

REFER TO SHEET OLM 160.3/E-1 FOR DETAILS.

8.REMOTE INDICATION SHALL BE PROVIDED TO PERMIT MONITORING OF PRESENCE OR

ABSENSE OF PREFERED - AND ALTERNATE - SOURCE VOLTAGE. FURNISH AND INSTALL

CABLES REQUIRED IN 1"C FROM ATS TO I/O RACK #9 AT SERVICE MOUND.

9.SUPERVISORY CONTROL PROVISIONS SHALL BE PROVIDED TO PERMIT SWITCH OPERATION

FROM A REMOTE LOCATION. FURNISH AND INSTALL CONDUCTORS REQUIRED FOR SUPERVISORY

CONTROL IN SAME CONDUIT AS REMOTE - INDICATION TO I/O RACK #9.

THE SOURCE SWITCHES ARE OPEN

PIER C

MECHANICAL ROOM

8K

8ML 8MR

9H

10M

11B

11F

11G

11M

1 #6 GND

(CIPSC)

S&C MODEL PME-9

14.4KV, 600A

ATS

O

C

S

GEN

12M

129 10 11

A

B

C

D

E

F

G

3#1/0, 5KV

15E

200A

43#1/0, 5KV

H

J

K

L

M

9D

9M

10B

10J

T

TRANSFER SWITCH

AUTOMATIC

3/C #1/0, 5KV

Z =

4.16KV -

75KVA

208Y/120V

2M

2F 3B

ATS SHALL INCLUDE CONTACTS TO ENERGIZE THE GENERATOR IN THE EVEN OF A POWER

FAILURE.

6.

7.

8E

8J

10G

MAIN

BREAKER

NO. 1

BREAKER

MCC6

250A RAW

WATER

PUMP #1

SPACE

HYDR

UNIT #2

MOTOR

#2A

50HP

300A

BREAKER

AIR

BREAKER

800KW

100E

HYDR

UNIT #2

MOTOR

#2B

30HP

COMPRESSOR

300A

MCC5

BREAKER

300A

MCC1

SUMP

PUMPS

R/S

SPACE

SPACE

BREAKER

500A

NO. 1

L&MCC

DAM

BREAKER

400A

NO. 1

BREAKER

1000A

TIE

BREAKER

150A 150A

BUS

TRANSITION

BREAKER

500A

DAM

NO. 2

BREAKER

300A

MCC4

400A

L&MCC

BREAKER

NO. 2

#1 #2

150A 150A

SPACE

#3 #4

HYDR

MOTOR

30HP

UNIT #3

#3B

BREAKER

250A

MCC8

METERING

#2

SPACE

HYDR

MOTOR

UNIT #3

#3A

50HP

BREAKER

300A

MCC7

SPACE

SERVICE

PUMP

15A BKR

SPARE

RAW

WATER

PUMP #2

MAIN

BREAKER

#1

NO. 2

METERING

400A

MCC8

C

K C

M

DOWNSTREAMRIVER WALL

UPSTREAM

MECH. ROOM

RIVERSIDE

(FUTURE)

FROM CENTRAL ILLINOIS

1A

MCC7

C

K C

M

ROOM

CA

SS

C

9M

10H

G2

MACH. HOUSE

10G

60A

HYDRAULIC UNIT #3

5MR

4.16KV -

POWER

15A

LOCAL

MACH. HOUSE

100A

4H

5ML

PUMP ROOM

SUMP

1600AF

600AF600AF

12M

150A

C

K C

M

PUMP #2

INTEGRAL WITH MAIN BREAKER

FOR LONG TIME, SHORT TIME

AND GROUND FAULT SETTINGS.

RECEPTS #4

K2

DOWNSTREAM

V3A

C

PUMP ROOM

4M

N

1600/5A

CT

7.5

SERVICE

HMCP

C

C

K C

M

MCC4

F

LAND WALL

MACH. HOUSE

8J

G1

K2 INTERLOCK WILL PERMIT ONLY ONE BREAKER TO BE CLOSED AT ANY TIME.

SS

8E

150A150A

STARTER

100A60A

HYDRAULIC UNIT #2

N

NEUT BUS IN

IQ

DP4130

IS C-H RMS510 TRIP UNIT

INTEGRAL WITH MAIN BREAKER

FOR LONG TIME, SHORT TIME

AND GROUND FAULT SETTINGS.

10B9H9D

15A

3.

175E

2B

K1

K1

PIER D

MIDDLE WALL

L2

MIDDLE WALL

4D

1600AF

1600AT

TX3

SUMP

E

SS

ANY TIME

3H

8MR

RAW WATER

PUMP #1 COMPRESSOR

K1

SS

V2A

K1 INTERLOCK WILL PERMIT NO MORE THAN TWO OF THE THREE BREAKERS TO BE CLOSED AT

5J

5K

C

K C

M

MCC6

AIR

480V, 3 PH, 60 HZ, 3 W, 1600A BUS, 65 KA RMS SYM

SS

11M

B

1000AT

DUPLEX

BUS DUCT AND SWITCHGEAR SHALL BE RATED AT 42 KAIC MINIMUM.

4.

250A

C

K C

M

300A

MCC1

RIVER WALL

MECH. ROOM

RIVERSIDE

Z = 5.75%

MCC5

C

K C

M

C

K C

M

POWER POWER

L1

PIER A

G4G3V2

300A

MOTOR #3B

480Y/277V

C

K C

M

RECEPTS #2RECEPTS #1

480V, 3 PH, 60 HZ, 3 W, 1600A BUS, 65 KA RMS SYM

H

MACH. HOUSE

MIDDLE WALL

SPARE

60A60A

DAM MCC

FEEDER #1

C

K C

M

400A

L & MCC

FEEDER #1

ELECTRICAL

V3

PUMP #1

300A

3G

1.

5ML

ROOM

POWER

L & MCC

UPSTREAMDOWNSTREAM

(FUTURE)

250A

2F

250A INDICATES BREAKER TRIP RATING

2F INDICATES LOCATION IN MCC

COMBINATION MOTOR CONTROL STARTER

2M INDICATES LOCATION IN MCC LINEUP

SS INDICATES SOLID STATE TYPE

100A INDICATES BREAKER TRIP RATING

3 INDICATES NEMA SIZE

7.5

V2

MOLDED CASE CIRCUIT BREAKER

CIRCUIT CONTINUATION POINTER

MECHANICAL ROOM

MOTOR #2B

8ML

15E

200A

POWER TRANSFORMER

FUSED DISCONNECT SWITCH

15E IS THE FUSE SIZE

200A IS THE SWITCH RATING

PT

CT

175E

CURRENT TRANSFORMER

POTENTIAL TRANSFORMER

FUSE WITH SIZE INDICATED

2M

100ASS

MOTOR #3A

11B

600A

OA/FFA

1600AF

1600AT

CT

175E

200E200E

2 3

S

O

LP-M

3#2, 15KV

PT

1000/1150KVA

OA/FFA

SEC 1 & 12

4.16KV -

480Y/277V

Z = 5.75%

AMPS

VOLTS

MB2

1600A, 4W BUS

N

NEUT BUS IN

SEC 1 & 12

IQ

DP4130

1600/5A

SW2

TX2

WITH DWG. NO. WHERE CIRCUIT

IS CONTINUED AND REF. NO.

MOTOR WITH MOTOR HP INDICATED

INDICATED

POWER RECEPTACLE (480V)

MOLDED, 150A, 4 POLE

FEMALE, JOY DISCONNECT

WITH DUMMY MALE PLUG

CIRCUIT IDENTIFICATION

EQUIPMENT REFERENCE NUMBER

K1

INDICATES A KEY INTERLOCK

SEE NOTES 1 AND 2

MOTOR #2A

1M

1600A, 4W BUS

E-XX

E-3A E-3 E-3A E-2A E-2A E-3 E-3A E-3A

K2 INTERLOCK IS APPLICABLE TO L&MCC, SEE DWG. E-2A

E-2

M. Rogers

REVISED BY : ADL, JV

CONSTRUCTION CO. TO

INDICATE FINAL AS-BUILT

CONSTRUCTION CONDITIONS

DATE : MAY 2002

2084-E-100

NOTES:

I

LEGEND

N

FILE : ooa1e001

4160V AND 480V

POWER DISTRIBUTION

ONE LINE DIAGRAM

16MAY02

12345

D

C

B

A

5 4 3 2

A

B

C

D

U.S.ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

LOUISVILLE,KENTUCKY

Revisions

Symbol Descriptions Date Approved

Designed by:

Drawn by:

Checked by:

Scale:

Date:

Drawing Code:

Sheet reference number:

Sheet of

US Army Corps of Engineers

OHIO RIVER

LOCKS AND DAMS 52 & 53 REPLACEMENT PROJECT

( OLMSTED LOCKS AMD DAM )

LOCKS CONSTRUCTION

OLMSTED , ILLINOIS

*** SAFETY PAYS ***

*** SUPPORT VALUE ENGINEERING - IT PAYS ***

Reviewed by:

17 JULY 1995

RECORD DRAWING "AS-BUILT"

As-Built Rev. by:

Breaker coordination for 15kV switch h2optblh Typewritten Text Fused 15kV switch replaced with Eaton Metal Enclosed Switch Breaker in 6-2020 by lock staff. Equipment supplied under W912QR19P0082.

h2optblh Oval h2optblh Oval h2optblh Oval h2optblh Oval h2optblh Oval h2optblh Oval h2optblh Oval h2optblh Oval h2optblh Oval h2optblh Oval h2optblh Oval h2optblh Typewritten Text Components included in the evaluation are circled in red, and include subcomponents of circled item.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018

52.204-13 System for Award Management Maintenance OCT 2018

52.204-16 Commercial and Government Entity Code Reporting AUG 2020

52.204-18 Commercial and Government Entity Code Maintenance AUG 2020

52.204-22 Alternative Line Item Proposal JAN 2017

52.212-1 Instructions to Offerors--Commercial Products and

Commercial Services

NOV 2021

52.212-3 Alt I Offeror Representations and Certifications--Commercial

Products and Commercial Services (OCT 2022) Alternate I

OCT 2014

52.212-4 Contract Terms and Conditions--Commercial Products and

Commercial Services

NOV 2021

52.219-6 Notice Of Total Small Business Set-Aside NOV 2020

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

NOV 2021

52.237-1 Site Visit APR 1984

52.245-1 Government Property SEP 2021

52.245-9 Use And Charges APR 2012

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7005 Representation Relating to Compensation of Former DoD

Officials

SEP 2022

252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019

252.204-7015 Notice of Authorized Disclosure of Information for Litigation

Support

MAY 2016

252.204-7018 Prohibition on the Acquisition of Covered Defense

Telecommunications Equipment or Services

JAN 2021

252.211-7007 Reporting of Government-Furnished Property MAR 2022

252.225-7055 Representation Regarding Business Operations with the

Maduro Regime

MAY 2022

252.225-7056 Prohibition Regarding Business Operations with the Maduro

Regime

MAY 2022

252.225-7972 (Dev) Prohibition on the Procurement of Foreign-Made Unmanned

Aircraft Systems (DEVIATION 2020-O0015)

MAY 2020

252.225-7973 (Dev) Prohibition on the Procurement of Foreign-Made Unmanned

Aircraft Systems - Representation (DEVIATION 2020-

O0015)

MAY 2020

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006

252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.244-7000 Subcontracts for Commercial Items JAN 2021

252.247-7023 Transportation of Supplies by Sea FEB 2019

CLAUSES INCORPORATED BY FULL TEXT

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021)

(a) Definitions. As used in this clause--

Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.

Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on

National Security Systems Instruction (CNSSI) 4009).

Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

Safeguarding means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices

(including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

(xiv) Update malicious code protection mechanisms when new releases are available.

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other

Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order

13556.

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products or commercial services, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.

(End of clause)

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services--

Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications-

Commercial Products and Commercial Services. The Offeror shall not complete the representation in paragraph

(d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.

(a) Definitions. As used in this provision-

Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause

52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment.

(b) Prohibition.

(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.

115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to--

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.

115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to--

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM)

(https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."

(d) Representations. The Offeror represents that--

(1) It [ ___ ] will, [ ___ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The

Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and

(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that--

It [ ___ ] does, [ ___ ] does not use covered telecommunications equipment or services, or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .