FUELS CABINETS SOLICITATION.pdf

PDF 344 KB Posted

Attached to
Remove and Replace Cabinets Federal contract opportunity
Solicitation number
W912PQ11R0056
Issued by
Department of the Army New York Army National Guard

About this file

This project is a total small business set aside. A site visit for this project will be held on Wednesday 7 September 2011 at 10 00AM. Please follow the instructions for attending the site visit. Site visit instructions will be found on pages 30 - 31 of the solicitation. Proposals for this project will be due no later than 11 00AM on 16 September 2011. Proposals may be submitted by fax or email and all proposals shall be submitted on the standard form 1442 or your companies letterhead.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F9S3S11202A001

Remove and replace the cabinets in the fuels lab of building 28.

MICHAEL KENNETH SPATUZZI 518 344-2487

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

26-Aug-2011

(RFP)

(IFB)

X

CALL:

POL CABINETS

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______14 calendar days and complete it w ithin ________15 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________16 Sep 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

W912PQ - 109 MSG/MSC

1 AIR NATIONAL GUARD ROAD

SCOTIA NY 12302-9752

W912PQ

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

11:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

VBDZ112033

8. ADDRESS OFFER TO (If Other Than Item 7)

518-344-2687FAX:TEL: 518-344-2477 TEL: FAX:

W912PQ-11-R-0056 35

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912PQ-11-R-0056

Section 00010 - Solicitation Contract Form

DAVIS BACON WAGE RATES

General Decision Number: NY100002 08/12/2011 NY2

Superseded General Decision Number: NY20080002

State: New York

Construction Types: Building, Heavy and Highway

Counties: Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie and Washington

Counties in New York.

BUILDING CONSTRUCTION PROJECTS (For all counties except

COLUMBIA, FULTON & GREENE) (does not include single family homes and apartments up to a including 4 stories), HEAVY AND

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 03/12/2010

1 04/16/2010

2 04/30/2010

3 07/23/2010

4 09/24/2010

5 10/08/2010

6 10/15/2010

7 11/12/2010

8 11/19/2010

9 12/03/2010

10 01/28/2011

11 02/04/2011

12 02/25/2011

13 04/22/2011

14 05/06/2011

15 05/20/2011

16 06/03/2011

17 06/10/2011

18 06/17/2011

19 07/01/2011

20 07/08/2011

21 08/05/2011

22 08/12/2011

ASBE0040-002 05/01/2009

Rates Fringes

Asbestos/Insulator Worker

SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems.....................$ 27.14 16.88

HAZARDOUS MATERIAL HANDLER

Duties limited to preparation wetting;

stripping; removal;

scrapping; vacuuming;

bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems..........$ 17.37 9.95

BOIL0197-002 10/20/2010

BOILERMAKER......................$ 30.00 17.23

BRNY0002-019 06/01/2010

BRICKLAYER

BRICKLAYERS, STONE MASONS,

CEMENT MASONS, PLASTERERS,

POINTERS, CAULKERS &

CLEANERS....................$ 26.91 15.78

HEAVY & HIGHWAY

CONSTRUCTION

CEMENT MASONS..............$ 27.87 15.04

MARBLE, TILE & TERRAZZO

FINISHERS...................$ 22.84 13.28

MARBLE, TILE & TERRAZZO

WORKERS.....................$ 28.78 15.78

CARP0019-002 07/01/2009

Carpenters:

HEAVY AND HIGHWAY

CONSTRUCTION (COLUMBIA AND

GREENE COUNTIES)

Carpenters, Millwrights, Pile Drivers...............$ 24.40 15.59

CARP0229-003 07/01/2009

SARATOGA COUNTY

HEAVY & HIGHWAY

CONSTRUCTION:

Carpenters.................$ 27.54 13.80

WASHINGTON COUNTY

CONSTRUCTION:

Carpenters.................$ 27.04 13.80

PAID HOLIDAYS: Labor Day, provided the employee has been on the payroll the calender week or any of the holiday week preceding the holiday and works the day after the holiday.

CARP0370-001 06/01/2010

ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND

SCHOHARIE COUNTIES

BUILDING CONSTRUCTION

Carpenters & Soft Floor

Layers.....................$ 27.20 15.81

Piledriver.................$ 27.70 15.81

HEAVY & HIGHWAY

CONSTRUCTION

Carpenters.................$ 26.39 14.95

CARP0370-003 07/01/2009

CARPENTERS..................$ 26.39 14.95

DIVER TENDERS...............$ 25.49 14.95

DIVERS (Dry Day)............$ 25.49 14.95

DIVERS......................$ 60.00 14.95

PILEDRIVERS.................$ 24.49 14.95

* ELEC0236-001 06/01/2011

ALBANY; COLUMBIA; FULTON; GREENE (that portion North of a line following the south limits of the city of Catskill);

MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE;

WASHINGTON

ELECTRICIAN......................$ 32.50 3%+18.07

ELEC0363-004 04/01/2011

GREENE COUNTY (Portion of)

ELECTRICIAN......................$ 37.00 23.12

ELEC1249-003 01/01/2011

LINE CONSTRUCTION: Lineman

(LIGHTING AND TRAFFIC SIGNAL

Including any and all Fiber

Optic Cable necessary for

Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems)

Flagman.....................$ 23.28 15.00 + 6.5% +a

Groundman Truck Driver

(tractor trailer unit)......$ 32.98 15.00 + 6.5% +a

Groundman Truck Driver......$ 31.04 15.00 + 6.5% +a

Lineman & Technician........$ 38.80 15.00 + 6.5% +a

Mechanic....................$ 31.04 15.00 + 6.5% +a

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor

Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

* ELEC1249-004 01/01/2011

Line Construction:

Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved):

Flagman....................$ 24.79 15.00+6.5%+a

Groundman digging machine operator...................$ 37.19 15.00+6.5%+a

Groundman truck driver

(tractor trailer unit).....$ 35.12 15.00+6.5%+a

Groundman Truck driver.....$ 33.06 15.00+6.5%+a

Lineman and Technician.....$ 41.32 15.00+6.5%+a

Mechanic...................$ 33.06 15.00+6.5%+a

Overhead transmission line work (where other trades are or have been involved):

Flagman....................$ 26.29 15.00+6.5%+a

Groundman digging machine operator...................$ 39.44 15.00+6.5%+a

Groundman truck driver

(tractor trailer unit).....$ 37.25 15.00+6.5%+a

Groundman truck driver.....$ 35.06 15.00+6.5%+a

Lineman and Technician.....$ 43.82 15.00+6.5%+a

Mechanic...................$ 35.06 15.00+6.5%+a

Substation:

Cable Splicer..............$ 45.45 15.00+6.5%+a

Flagman....................$ 24.79 15.00+6.5%+a

Ground man truck driver....$ 33.06 15.00+6.5%+a

Groundman digging machine operator...................$ 37.19 15.00+6.5%+a

Groundman truck driver

(tractor trailer unit).....$ 35.12 15.00+6.5%+a

Lineman & Technician.......$ 41.32 15.00+6.5%+a

Mechanic...................$ 33.06 15.00+6.5%+a

Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation

Cable Splicer..............$ 46.87 15.00+6.5%+a

Flagman....................$ 25.57 15.00+6.5%+a

Groundman Digging Machine

Operator...................$ 38.35 15.00+6.5%+a

Groundman Truck Driver

(tractor-trailer unit).....$ 36.22 15.00+6.5%+a

Groundman Truck Driver.....$ 34.09 15.00+6.5%+a

Lineman & Technician.......$ 42.61 15.00+6.5%+a

Mechanic...................$ 34.09 15.00+6.5%+a

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer/Central

Office Person..............$ 23.07 3.05+3%

Cable splicer..............$ 27.44 4.43 + 3%

Groundman..................$ 13.81 4.43 + 3%

Installer Repairman-

Teledata

Lineman/Tecnician-

Equipment Operator.........$ 26.05 4.43 + 3%

TREE TRIMMER................$ 21.64 7.36+3%

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial

Day, Good Friday, Independence Day, Labor Day, Thanksgiving

Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New

York State, provided the employee works two days before or two days after the holiday.

b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas

Day.

ELEC1249-007 05/04/2009

LINE CONSTRUCTION (LINEMAN) LIGHTING AND TRAFFIC SIGNAL

INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE

TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD

WEATHER INFORMATION SYSTEMS

COLUMBIA COUNTY

LINE CONSTRUCTION: Lineman

Flagman.....................$ 23.00 13.50+6.5%+a

Groundman Digging Machine

Operator....................$ 34.51 13.50+6.5%+a

Groundman Truck Driver

(Tractor-trailer unit)......$ 32.59 13.50+6.5%+a

Groundman Truck Driver......$ 30.67 13.50+6.5%+a

Lineman and Technician......$ 38.34 13.50+6.5%+a

Mechanic....................$ 30.67 13.50+6.5%+a

PAID HOLIDAYS:

a. Memorial Day, New Year's Day, President's Day, Good

Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the

President of the United States and Election Day for the

Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEV0035-001 01/01/2011

ALBANY; COLUMBIA (Towns of Claverack, Hillsdale, Ghent, Stockport, Austerlitz, Canaan, New Lebanon, Chatham, Kinderhook, Styvesant and Greenport); FULTON; GREENE (Towns of

Durham, Greenville, New Baltimore, Coxcsackie and Athens);

MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND

WASHINGTON COUNTIES

Elevator Constructor.............$ 38.94 21.785

FOOTNOTES:

a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving

Day, and the day after Thanksgiving Day, Christmas Day.

b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ELEV0138-004 01/01/2011

COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE,

GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY

(THE TOWNS OF HUNTER AND CATSKILL)

ELEVATOR MECHANIC................$ 48.96 21.785+a+b

a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving

Day, the Friday after Thanksgiving Day and Christmas Day.

b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ENGI0106-001 07/01/2010

Power equipment operators:

GROUP 1.....................$ 33.87 19.65+a

GROUP 2.....................$ 33.44 19.65+a

GROUP 3.....................$ 32.53 19.65+a

GROUP 4.....................$ 29.96 19.65+a

GROUP 5.....................$ 35.05 19.65+a

GROUP 6.....................$ 34.37 19.65+a

GROUP 7.....................$ 34.87 19.65+a

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Boom Truck (over 5 tons), Crane, Cherry Picker (over

5 ton capacity), Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane

GROUP 2: Automated Concrete Spreader (CMI), Automatic Fine

Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Belt Placer (CMI type), Black Top Plant (Automated), Boom

Truck (5 tons and under), Cableway, Caisson Auger, Central

Mix Concrete Plant (Automated), Concrete Pump (8" or over), Dredge, Dual Drum Paver, Excavator (All Purpose-Hydraulicly

Operated) (Gradall or similar), Fork Lift (Factory Rated 15

ft. and over), Front End Loader (4 c.y. and over), Head

Tower (Sauerman or equal), Hoist (2 or 3 Drum), Holland

Loader, Mine Hoist, Mucking Machine or Mole, Pavement

Breaker (SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P), Quad 9, Quarry Master (or equivalent), Scraper, Shovel, Side Boom, Slip Form Paver, Tractor Drawn Belt-Type Truck Crane, Truck or Trailer

Mounted Log Chipper (Self-Feeder), Tug Operator (Except

Manned Rented Equipment), Tunnel Shovel

GROUP 3: Asphalt Paver, Backhoe (Tractor Mounted, Rubber

Tired), Bituminous Spreader and Mixer, Blacktop Plant

(Non-Automated), Blast or Rotary Drill (Truck or Tractor

Mounted), Boring Machine, Cage-Hoist, Central Mix Plant

(Non-Automated) and All Concrete Batching Plants, Cherry

Picker (5 Tons Capacity and Under), Compressors (4 or less)

Exceeding 2000 C.F.M. Combined Capacity, Concrete Paver

(over 16S), Concrete Pump (Under 8"), Crusher, Diesel Power

Unit, Drill Rigs (Tractor Mounted), Front End Loader (under

4 c.y.), Hi-Pressure - Boiler (15 lbs. and over), Hoist

(One Drum), Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive, Maintenance

Engineer/Greaseman/ Welder, Mixer (For Stabilized Base

Self-Propelled), Monorail Machine, Plant Engineer, Profiler

(105 H.P. and under), Pug Mill, Pump Crete, Ready Mix

Concrete Plant, Refrigeration Equipment (For Soil

Stabilization), Road Widener, Roller (All Above Subgrade), Sea Mule, Self-contained Ride-on-Rock Drill, excluding

Air-Track Type Drill, Skidder, Tractor with Dozer and/or pusher, Trencher, Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 4: A-Frame Winch Hoist on Truck, Ballast Regulator

(Ride- On), Compressors (4 not to exceed 2000 C.F.M.

Combined Capacity, or 3 or less with more than 1200 C.F.M.

but not to exceed 2000 C.F.M.), Directional Drill Machine

Locator Dust Collectors, Generators, Pumps, Welding

Machines, Light Plants (4 of Any Type Of Combination), Concrete Pavement Spreaders and Finishers, Conveyor, Drill

Core, Drill Well, Electric Pump Used In Conjunction with

Well Point System, Farm Tractor with Accessories, Fine

Grade Machine, Fork Lift (under 15 ft.), Grout Pump, Gunite

Machine, Hammers (Hydraulic-Self-Propelled), Hydra- Spiker

(Ride-On), Hydro-Blaster Water, Post Hole Digger and Post

Driver, Power Sweeper, Roller (Grade and Fill), Scarifier

(Ride-On Spansaw (Ride-On), Skid Steer loader (Bobcat or similar), Submersible Electric Pump (When Used In Lieu Of

Well Point System), Tamper (Ride-On), Tie Extractor

(Ride-On), Tie Handler, Tie Inserter (Ride-On), Tie Spacer

(Ride-On), Tire Repair, Track Liner, Tractor With Towed

Accessories, Vibrator Compactor, Vibro Tamp, Well Point, Aggregate Plant, Boiler (Used In Conjunction With

Production), Cement and Bin Operator, Compressors (3 or less not to Exceed 1200 C.F.M. Combined Capacity), Dust

Collectors, Generators, Pumps, Welding Machines, Light

Plants (3 or less of Any Type or Combination), Concrete or

Mixer (16S and under), Concrete Saw (Self-Propelled), Fireman, Form Tamper, Hydraulic Pump (Jacking System), Light Plants, Mulching Machine, Oiler, Parapet-Concrete or

Pavement Grinder, Power Broom (Towed), Power Heaterman, Revinius Widener, Shell Winder, Steam cleaner, Tractor

GROUP 5: Master Mechanic

GROUP 6: Crane Premium with Boom Length and Jib 150 Ft.- 199

Ft.

GROUP 7: Crane Premium with Boom Length and Jib 200 Ft. and over

Tower Crane Premium .50

Hazmat Work Premium 2.50

Hydrographic .50

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Christmas Day, Lincoln's

Birthday, Washington's Birthday, Good Friday, Columbus Day, November Election Day and Veteran's Day

ENGI0106-002 07/01/2010

BUILDING

Power equipment operators:

GROUP 1.....................$ 33.88 19.79+a

GROUP 2.....................$ 33.44 19.79+a

GROUP 3.....................$ 32.53 19.79+a

GROUP 4.....................$ 29.96 19.79+a

GROUP 5

1..........................$ 34.38 19.79+a

2..........................$ 34.88 19.79+a

GROUP 6.....................$ 34.38 19.79+a

GROUP 7.....................$ 35.43 19.79+a

GROUP 8.....................$ 37.93 19.79+a

Hazardous work - Anytime Operating Engineers are involved with level C or above, $2.50 per hour over regular rate.

a. Paid Holidays: New Years Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING)

GROUP 1: Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom truck (over 5 tons)

GROUP 2: Shovel, All backhoe (except tractor mounted rubber tired John Deere 510 or smaller), gradalls, power road grader, all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, Belcrete system, automated asphalt concrete plant and tractor road paver, boom truck (5 tons and under)

GROUP 3: Backhoe, (tractor mounted rubber tired equivalent to John Deere 510 or less), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hoisting (single drum), hoist - two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, cord and well drillers (one drum), post hole digger, model

CHB Vibro-Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller

GROUP 4: Fork lift, high lift, lull, oiler, fireman and heavy- duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack

(belcrete system), seeding, and mulching machines, pumps

GROUP 5: Crane Premiums:

1 over 150'

2 over 200'

GROUP 6: Tower Crane

GROUP 7: Master mechanic (other than nuclear work)

GROUP 8: Master mechanic on nuclear work

IRON0012-011 05/01/2011

ALBANY; COLUMBIA; FULTON (Albin, Bleecker, Broad, Johnstown, Mayfield, Northampton and Perth); GREENE, MONTGOMERY

(Amsterdam, Charleston, Florida, Glen, Mohawk and Root);

RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; and WASHINGTON

COUNTIES:

Ironworkers:

Sheeter, Bucker-up..........$ 25.78 17.96

Sheeter.....................$ 27.90 19.24

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcing, Stone

Derrickmen..................$ 27.65 19.24

IRON0440-007 05/01/2011

FULTON (Twps. of Caroga, Ephratah, Oppenheim, Stratford);

MONTGOMERY (Twps of Canajoharie, Minden, Palatine, St.

Johnsville):

Ironworkers:

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone

Derrickman..................$ 23.63 22.01

LABO0017-001 06/01/2010

COLUMBIA COUNTY (Twps of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)

Laborers:

COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont, and the City of Hudson)

(Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work) HEAVY & HIGHWAY

GROUP 1:...................$ 32.75 17.95+a

GROUP 2:...................$ 36.65 17.95+a

GREENE COUNTY (Township of

Catskill) HEAVY & HIGHWAY:

GROUP 1:...................$ 28.40 17.95+a

GROUP 2:...................$ 32.75 17.95+a

GROUP 3:...................$ 36.65 17.95+a

GROUP 4:...................$ 39.15 17.95+a

TUNNEL, SHAFT & CAISSON

WORK

GROUP 1....................$ 39.15 17.95+a

For HEAVY & HIGHWAY CLASSIFICATIONS in COLUMBIA COUNTY

(Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)

HEAVY & HIGHWAY CLASSIFICATIONS

GROUP 1: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective equipment and clothing are not required

GROUP 2: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required

For HEAVY & HIGHWAY CLASSIFICATIONS in GREENE COUNTY

(Township of Catskill)

a. PAID HOLIDAYS: New Years Day, President's Day, Memorial

Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas

Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons.

GROUP 1: Flagperson, gateperson

GROUP 2: General laborers, chuck tender, handling and distributing drinking water, distributing all tools and supplies of laborers, nipper, powder carrier, magazine tender, warehouse laborers, concrete man, vibrator man, mason tender, mortar man, spraying, brushing and covering of concrete for curing and preservative purposes, traffic striper, scaffold builder, concrete curb and sidewalk form setter; permanent traffic striping and reflective devices, placing and maintenance of all flares, cones, lights, signs, barricades, traffic patterns, and all temporary reflective type materials for traffic control, custodial work, traffic directors, temporary heat or light tenders, tool room, dewatering pump men, pitman, dumpmen, snow removal and firewatch, asphalt man, joint setter, signal person, pipelayer, pipe lining and relining, wellpoints, conduit and duct layer, wire puller, rip rap and dry stone layer, steel rod carrier, core drill, rock splitter, Hilti gun air or electric, jackhammer, bush hammer, pavement breaker, chipping hammer, wagon drill, air track, jib rig, joy drill, gunite and sand blasting, coal passer and other machine operators, power tool operator, sprayer and nozzle man on mulching and seeding machine, all guard rail and fence, all seeding and sod laying, all landscape work, grade checker, all bridge work, walk behind self-propelled power saw, grinder, groover or similar type machine, walk behind tamper and roller of all types, salvage, stripping, wrecking and dismantling laborer (including barman, cutting torch and burner man), sheeting and shoring coming under laborers jurisdiction, bit grinder, operator of form pin puller and drivers, sandblasting, joint and jet sealer, filling and wiring baskets for gabion walls, permanent sign man, median barrier, sta-wall or similar type product, chain saw operator, railroad track laborer, waterproofer, pre-stressed and pre-cast concrete brick, block and stone pavers, power tools used to perform work usually done by laborers, power buggy and pumpcrete operator, fireproof, plaster and caustic pump, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materials abatement when protective clothing and equipment is not required, power brush cutter, retention liners, artificial turf, retaining walls, walk behind surface planer, welding related to laborers work, remote controlled equipment normally operated by laborers, all technician work including but not limited to stitching, seaming, heat welding, fireproof sprayer, mortar mixer, concrete finisher, form setter for concrete curbs and flatwork.

Gunite nozzle man, stone cutters, granite stone layer, manhole, catch basin or inlet installing, laser men.

Ground man on milling machine

GROUP 3 Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman

GROUP 4: Asbestos, toxic, lead or hazardous material abatement foreman

For TUNNEL, SHAFT & CAISSON WORK CLASSIFICATIONS

a. PAID HOLIDAYS: New Years Day, President's Day, Memorial

Day, Independence Day, Labor Day, Election Day, Veterans

Day, Thanksgiving Day, Christmas Day

GROUP 1: Laborer, Pit and Dumpman, Chuck Tender, Brakeman and

Powderman;

Miner and all machine men, Safety Miner, all shaft work, caisson work, drilling, blow pipe, all air tools, tugger, scaling, nipper gunniting from pot to nozzle, bit grinder, signal man (top and bottom), shield driven tunnel, mixed face and soft ground liner plate tunnel in free air

LABO0035-001 06/01/2010

FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);

MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND

ST. JOHNSVILLE)

Laborers Building Construction

Asbestos Removal............$ 21.50 13.44

Blasters, Form Setters, MotorBuggy Operator (Rider

Type)......................$ 20.50 13.44

Hazardous Waste Removal

Hazardous waste removal includes wetting, stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems.........$ 21.50 13.44

HEAVY & HIGHWAY:

GROUP 1:...................$ 24.30 16.54

GROUP 2:...................$ 24.50 16.54

GROUP 3:...................$ 24.70 16.54

GROUP 4:...................$ 24.90 16.54

Laborers....................$ 20.00 13.44

Pipelayers, Motor Mixers, Motor Buggy Operator

(Walk Behind) Power Lift

(Walk Behind)...............$ 20.15 13.44

Wagon Drill Operator........$ 20.40 13.44

Day, Labor Day, Thanksgiving Day and Christmas Day.

GROUP 1: Common Laborers, Flagman, Outboard and Hand boats

GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortar Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborer's tools, Installation of bridge drainage, Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw

Operator on asphalt paver, Water pump operator (1 1/2" and single diaphragm), Nozzle (asphalt, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and air tool operators, Wrecking laborers

GROUP 3: All rock or drilling machine operators (except quarry master and similar type), Acetylene torch operators, and Asphalt paver, Powderman

GROUP 4: Blasterers, Form setters, Stone or Granite Curb setters

LABO0157-001 07/01/2009

FULTON (Twps. of Bleeker, Mayfield, Northhampton, Johnstown, Broadalbin and Perth); MONTGOMERY (Twps. of Mohawk, Glen, Charleston, Amsterdam, and Florida); SARATOGA (Twps. of Day, Hadley, Edinburg, Corinth, Moreau, South Glens Falls, Providence, Greenfield, Wilton, Northcumberland, Galway, Milton, Saratoga Springs, Charlton, Ballston, Malta and Clifton

Park); SCHENECTADY and SCHOHARIE COUNTIES.

LABORER

BUILDING:

GROUP 1....................$ 22.88 13.65

GROUP 2....................$ 24.23 13.65

HEAVY & HIGHWAY:

GROUP 1:...................$ 24.34 14.40+a

GROUP 2:...................$ 24.54 14.40+a

GROUP 3:...................$ 24.74 14.40+a

GROUP 4:...................$ 24.94 14.40+a

GROUP 5:...................$ 26.34 14.40+a

LABORER CLASSIFICATIONS

Group 1: Common Laborers

Group 2: Asbestos and Toxic Materials

Commercial projects valued at $800,000 or less and/or industrial projects valued at $100,000 or less, excluding demolition work (the complete razing of structures) 75% of the basic wage scale with full benefits will apply

a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, and Christmas Day

LABORER CLASSIFICATIONS

GROUP 1: Common laborers, flagman, outboard & hand boats

GROUP 2: Bull float, chain saw, concrete aggregate bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tamper, drill doctor, tail or screw operator on asphalt paver, water pump operator (1 1/2") and single diaphragm), nozzle (asphalt, gunnite, seeding, and sand blasting), laborers on chain fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, and air tool operators, wrecking

GROUP 3: All rock drilling machine operators (except quarry master and similar type), acetylene torch operator, and asphalt paver, powderman

GROUP 4: Blasterers, form setters, stone or granite curb

GROUP 5: Hazardous waste removal

LABO0190-001 07/01/2011

ALBANY; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA COUNTY

(Townships of Stillwater, Halfmoon, Saratoga)

BUILDING:

GROUP 1....................$ 22.66 16.42

GROUP 2....................$ 24.01 16.42

LABORERS CLASSIFICATIONS

GROUP 1: Common Laborers

GROUP 2: Hazardous waste removal Commercial projects valued at $800,000 or less and/or industrial projects valued at

$100,000 or less excluding demolition work, (complete razing of structures) will receive 75% of basic wage scale with full fringes will apply

LABO0190-002 07/01/2011

ALBANY; RENSSELAER; COLUMBIA (Twps. of Stuyvesant, Stockport, Kinderhook, New Lebanon, Cannan, Ghent, Chatham, Austerlitz).

GREENE (except Catskill Township). WASHINGTON COUNTY. SARATAGO

COUNTY (Townships of Stillwater, Halfmoon Saratoga)

HEAVY & HIGHWAY:

GROUP 1:...................$ 25.39 16.95

GROUP 2:...................$ 25.39 16.95

GROUP 3:...................$ 25.59 16.95

GROUP 4:...................$ 25.79 16.95

GROUP 5:...................$ 25.99 16.95

PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.

LABORERS CLASSIFICATIONS

GROUP 1: Common laborers, flagmen, outboard and hand boats

GROUP 2: Bull float, chain saw, concrete aggregated bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tampers, drill doctor, Tail or screw operator on asphalt paver, Water pump operator (1 1/2" and single diaphragm), Nozzle (asphalt, gunnite, seeding, and sand blasting) Laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, air tool operators, and wrecking

GROUP 3: All rock air drilling machine operators (except quarry master and similar type), acetylene torch operators, and asphalt paver, powderman

GROUP 4: Blasterers, form setters, stone or granite curb

GROUP 5: Hazardous waste removal

LABO1000-005 05/01/2009

COLUMBIA (Twps. of Greenport, Claverack, Hillsdale, Livingston, Germantown, Taghkanic, Copake, Clermont, Gallatin, Ancram):

GROUP 1....................$ 24.20 18.75+a

GROUP 2....................$ 27.96 18.75+a

GROUP 3....................$ 28.96 18.75+a

LABORERS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Flagperson; Placing and maintenance of all flares, cones, lights, signs, barricades; traffic control custodial work; traffic directors; temporary heat or light tenders;

tool rooms

GROUP 2: General Laborers, Dumpman, Pitman, Concrete man;

Signal man; Pipelayers; Rip rap; Dry stone layer; Jack hammer; Powderman; Highscalers power buggy operator; Steel rod carrier; Vibratory operator; other machine operator;

wrecking; Vibrator operator-compactor; Gunite and sandblasting; Water pump 2" or under; Nipper; Chucker;

Asphalt Workers

GROUP 3: Asphalt raker; Asphalt Screedman; Drillers (all);

Laser Beam Operator; Form Setter/Aligners; Blasters

a. PAID HOLIDAYS: New Years Day, Presidents Day, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, November Election Day, Thanksgiving Day, and

Christmas Day

PAIN0009-005 05/01/2010

Painters:

Lead Abatement Workers, Structural Steel

Zone 1.....................$ 26.04 8.58

Zone 2.....................$ 24.79 9.83

Painters, Drywall

Finishers, Spray

Zone 1.....................$ 25.04 8.58

Zone 2.....................$ 23.79 9.83

Zone #1 Entire counties of ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA

ZONE #2 All of WASHINGTON County

PAIN0009-013 07/01/2010

GLAZIER..........................$ 23.10 14.59

PAIN0155-002 05/01/2010

COLUMBIA AND GREENE COUNTIES

Drywall Finisher............$ 27.39 16.31

Lead Abatement Work.........$ 27.39 16.31

Painter/Paperhanger.........$ 27.39 16.31

Spray Rate..................$ 28.39 16.31

PAIN0806-002 10/01/2010

ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER,

SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON

Structural Steel and Bridge.$ 46.25 31.03

PLUM0007-001 05/01/2011

ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER;

SCHENECTADY; SARATOGA (Towns of Charlton, Clifton Park, Galway, Halfmoon, Milton, Stillwater and Waterford)

PLUMBER/PIPEFITTER...............$ 33.46 20.95

PLUM0112-019 05/01/2011

Townships of Canajoharie and Minden

Plumber and Steamfitter

Northern Zone...............$ 29.90 19.49

PLUM0773-002 05/01/2011

SARATOGA (Remainder of County); WASHINGTON COUNTY:

PLUMBER/PIPEFITTER...............$ 30.25 20.53

ROOF0203-003 06/01/2007

SCHOHARIE COUNTY:

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 21.20 10.34

ROOF0241-001 06/01/2010

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 25.65 10.97

SFNY0669-001 04/01/2011

SPRINKLER FITTER.................$ 30.15 18.90

SHEE0083-001 06/01/2011

Sheet metal worker...............$ 29.78 20.21+a

Day, Labor Day, Thanksgiving Day, Christmas Day. If any of these holidays fall on a Saturday or Sunday, either the preceding Friday or following Monday will be observed as the holiday.

TEAM0294-002 05/01/2006

BUILDING CONSTRUCTION

Truck drivers:

GROUP 1.....................$ 22.27 9.84+a

GROUP 2.....................$ 22.57 9.84+a

a. One week vacation after 1 year; 2 weeks vacation after 5 years.

TRUCK DRIVERS BUILDING CLASSIFICATIONS

GROUP 1: Straight, winch, transit mix on job site, road oilers, dump, panel, pick-up, water and fuel trucks on site

(including nozzle)

GROUP 2: Euclid or similar equipment, lowboy or lowboy trailers

TEAM0294-003 07/01/2011

Truck drivers:

GROUP 1....................$ 26.67 15.65+a

GROUP 2....................$ 26.72 15.65+a

GROUP 3....................$ 26.77 15.65+a

GROUP 4....................$ 26.92 15.65+a

GROUP 5....................$ 27.07 15.65+a

TRUCK DRIVERS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Pick-ups, panel trucks, flatboy material trucks

(straight jobs), single axle dump trucks, dumpsters, receivers, greasers, truck tireman

GROUP 2: Tandems, batch trucks, mechanics

GROUP 3: Semi-trailers, low-boy trucks, asphalt distributor trucks, agitator, mixer trucks and dumpcrete type vehicles, truck mechanic, fuel truck

GROUP 4: Specialized earth moving equipment - euclid type or similar off-highway equipment, where not self-loaded, straddle (ross) carrier, self-contained concrete unit

GROUP 5: Off-highway tandem back dump, twin engine equipment and double hitched equipment where not self-loaded

Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the day before and the day after the holiday.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

STATEMENT OF WORK

Scope of Work

POL Cabinets

Project Number VBDZ112033

PROJECT DESCRIPTION

The Contractor shall provide all material, labor, equipment, and supervision required to remove and replace the cabinets in the fuels lab of bldg 28. The new cabinets will be sized according to the attached sketch and comparable to the attached specs. The cabinets will be modified to accommodate the existing ductwork. This project will also include new epoxy resin countertops, new 4” cove base, and a new sink fixture. The Contractor will coordinate work schedule with 109 th Civil Engineering. All measurements are approximate; it is the Contractor’s responsibility to verify accuracy of measurements. The Contractor will be responsible for the repair or replacement of any damages to Air Force property that they inflict.

Due to the scope of the project it is highly recommended that the Contractor attend a pre-arranged site visit prior to submitting a bid.

CONTRACTOR REQUIREMENTS

1. The Contractor is responsible for the proper disposal of all rubbish off-base.

2. The Contractor is required to follow all environmental regulations including providing 109 th

Civil Engineering with all applicable MSDS sheets.

3. The Contractor will submit all warrantee information against defects in material and workmanship upon completion of installation.

4. The Contractor is responsible for accuracy of all measurements and the implementation of appropriate building codes. The Contractor must get approval from Civil Engineering

Production Control (344-2441) and/or Engineering (344-2568) before starting work and before any utility shutdowns.

5. The Contractor is responsible for site cleanliness.

6. The Contractor shall provide product submittals for equipment and materials. The 109

Civil Engineering Squadron will review product submittals and return them to the

Contractor. The Government will select colors from product submittal data. Only materials approved by the 109

Civil Engineering Squadron will be used for this project.

PROPOSED PROJECT SCHEDULE

The project will begin 14 days following the Notice to Proceed. The project shall be completed within

15 calendar days following the start date.

LIQUIDATED DAMAGES

STATEMENT OF LIQUIDATED DAMAGES

(Project: POL Cabinets VBDZ112033)

In accordance with FAR 36.206, liquidated damages will be assessed for each calendar day required to complete the construction work on this project past the scheduled completion date. The contractor has complete control of the pace of work. Liquidated damages shall be in the amount as follows:

$420.00 Each day past scheduled completion date.

$300.00 One-time fixed cost.

Itemized Costs

CIVIL ENGINEER

Engineer 4.00 hrs/day @ $55.00/hr = $220.00 per day

Project Engineer 0.0 hrs/day @ $25.00/hr =

Inspector 4.0 hrs/day @ $20.00/hr = $80.00 per day

Transportation $0.00 per day

Total Civil Engineering Cost per day $300.00 per day

PROCUREMENT

Contracting Officer 2.0 hrs/day @ $30.00/hr = $60.00 per day

Contract Administrator 2.0 hrs/day @ $30.00/hr = $60.00 per day

Total Procurement Cost per day $120.00 per day

TOTAL COST PER DAY BEYOND COMPLETION DATE = $ 420.00 per day

PROBABLE ADDITIONAL LOSSES

Loss of living quarters by non-completion

Loss of use of runways/taxiways

$ N/A

$ N/A

Loss of use of building

Loss of revenue from facilities providing services, $ N/A

$ N/A

FIXED COSTS

One time transportation cost – Engineer

One time transportation cost -- Procurement

$ N/A

$ N/A

Preparation of Modification

Staff Judge Advocate Review

$125.00

$175.00

TOTAL FIXED COST $300.00

CHRISTOPHER E. TYMULA, SMSgt, NYANG

Base Contracting Officer

MAGNITUDE OF THE PROJECT

In accordance with Far Part 36.204(a) the magnitude of this project is Less than $25,000.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum POL Cabinets

FFP

POL Cabinets

CE Work Order Number: VBDZ112033

FOB: Destination

NSN: Y173-00-000-0000

PURCHASE REQUEST NUMBER: F9S3S11202A001

SIGNAL CODE: A

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 12-OCT-2011 TO

27-OCT-2011

N/A F9S3S4 - 109 CES RPM-SRM

2LT JAMES VAN WORMER

1 AIR NATIONAL GUARD ROAD

SCOTIA NY 12302-9752

518-344-2480

FOB: Destination

F9S3S4

CLAUSES INCORPORATED BY REFERENCE

52.204-7 Central Contractor Registration APR 2008

52.222-3 Convict Labor JUN 2003

52.222-6 Davis Bacon Act JUL 2005

52.222-7 Withholding of Funds FEB 1988

52.222-8 Payrolls and Basic Records JUN 2010

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) JUL 2005

52.222-12 Contract Termination-Debarment FEB 1988

52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988

52.222-14 Disputes Concerning Labor Standards FEB 1988

52.222-15 Certification of Eligibility FEB 1988

52.222-21 Prohibition Of Segregated Facilities FEB 1999

52.222-26 Equal Opportunity MAR 2007

52.222-36 Affirmative Action For Workers With Disabilities OCT 2010

52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002

52.236-13 Accident Prevention NOV 1991

52.236-15 Schedules for Construction Contracts APR 1984

52.236-17 Layout of Work APR 1984

CLAUSES INCORPORATED BY FULL TEXT

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (JUN 2003)

(a) Definition.

"Small business concern," as used in this clause, means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.

(b) General. (1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.

(2) Any award resulting from this solicitation will be made to a small business concern.

(c) Agreement. A small business concern submitting an offer in its own name shall furnish, in performing the contract, only end items manufactured or produced by small business concerns in the United States or its outlying areas. If this procurement is processed under simplified acquisition procedures and the total amount of this contract does not exceed $25,000, a small business concern may furnish the product of any domestic firm. This paragraph does not apply to construction or service contracts.

(End of clause)

52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.

52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

52.236-12 CLEANING UP (APR 1984)

The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. Upon completing the work, the

Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer.

52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer's notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for Wednesday 7 September 2011 at 10:00AM. All site visit participants will meet in the Building 25 (Civil Engineering) training room…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .