This document provides details on changes made to construction documents for an isolation kennel project. The U.S. Army Corps of Engineers, Wilmington District requires construction of a pre-engineered metal building to house Military Working Dogs in temporary quarantine following deployment. Drawings were revised to show utility locations and detail changes. Specifications were added or revised regarding cabinets, sound absorption, wire partitions, plumbing, and lighting to change all fixtures to LED. The firm fixed price contract will be awarded under solicitation number W912PM20B0020 for a project with a construction magnitude between $500,000 to $1,000,000. Offerors must register in SAM and check the website for amendments as no additional documentation will be provided. The proposal due date will be specified in the solicitation. This is a 100% small business set-aside for the Department of the Army Corps of Engineers, Wilmington District.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT 02 - PLANS (2).pdf | ||
| W912PM20B0020 Amendment 0002 Conformed Copy.pdf | ||
| Amendment 02 Specifications.pdf | ||
| W912PM20B0020 Amendment 0002.pdf | ||
| MF-00004-17 SDite Visit Attendance Roster.pdf | ||
| W912PM20B0020 Amendment 01 CC.pdf | ||
| W912PM20B0020 Amendment 01.pdf | ||
| MF-00004-17_RTA_PLANS.pdf | ||
| FINAL RTA_SPECS_MF-00004-17 3rd SFG Isolation Kennel.pdf | ||
| W912PM20B0020 MF-0004-17 3rd SFG Isolation Kennel.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MF-00004-17 3rd SFG Isolation Kennel W912PM20B0020
Amendment 02 Aug 19, 2020
TECHNICAL SUMMARY OF CHANGES
1) Changes to Drawings (all changes are captured in revision clouds)
a) CU101 – Drawing was revised to show location of existing Sandhills Utilities transformer and location of existing Control System Panel in Room 101 of Main Kennel Bldg. O-X104.
b) A-401 - Details of Wire Cages were revised.
c) A-602 - Finish Key was revised to add Cabinet and Countertop finishes
d) EL-101 - Fixture Schedule and Notes were revised to change all Lighting Fixtures to LED
Fixtures
e) EP-501 - Notes were revised to locate connection of Isolation Kennel to existing Control
Systems Panel in Room 101 of Main Kennel Bldg. O-X104
2) Revisions/Additions to Specifications
a) 01 00 05 General and Special Provisions, paragraph 3.2.2 - All references to JSOC
Compound OMITTED, this is a USASOC project
b) 01 14 00 Work Restrictions, paragraph 1.3.1.2 - All references to JSOC Compound
OMITTED, this is a USASOC project
c) 01 45 00.00 10 Quality Control, paragraph 3.8.3 - All references to JSOC Compound
OMITTED, this is a USASOC project
d) 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets - This Specification Section was added to the construction documents
e) 09 84 30 Sound-Absorbing Units - This Specification was added to the construction documents
f) 10 22 13 Wire Mesh Partitions - This Specification was added to the construction documents
g) 22 00 00 Plumbing, General Purpose, paragraph 2.4.1 - This paragraph was added to describe specifications for the sink in the Laundry Room 103
h) 26 51 00 Interior Lighting - This entire specification was revised to change all interior light fixtures to LED fixtures
i) 26 56 00 Exterior Lighting - This entire specification was revised to change all exterior light fixtures to LED fixtures