This abstract of bids summarizes a solicitation for regional harbor dredging services across multiple locations. The U.S. Army Corps of Engineers, Wilmington District is seeking a contractor to provide maintenance dredging for Brunswick Harbor, Georgia; Savannah Harbor, Georgia; Wilmington Harbor, North Carolina; and Morehead City Harbor, North Carolina. Services include hopper dredging to depths of 40 to 51 feet below MLLW, transporting dredged materials up to 15 miles for offshore disposal. The solicitation is unrestricted and will result in a firm fixed-price contract valued between $10-25 million. Bids were due September 4, 2020 and the North American Industry Classification System code is 237990.

View the file

Other files for this federal contract opportunity

Other files attached to South Atlantic Regional Harbor Dredging, newest first.
File Type Posted
B1 - Bid Opening Attendance Sheet.pdf PDF
A21 - FINAL_0Bto97 plus 700_SHEP-20.txt TXT text file
A21 - RHDC_Amdt0001_Summary of Changes.pdf PDF
A21 - FY21_RHDC_RTA_PLANS_unlocked.pdf PDF
A21 - FY21_RHDC_RTA_PLANS.pdf PDF
A21 - W912PM20B0008.pdf PDF
A21 - RTA_SPECS FY21_RHDC.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF BIDS 1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED

4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

U. S. Department of the Army, Corps of Engineers I CERTIFY that I have opened, read, and Rosalind M. Shoemaker, Contracting Officer Wilmington Contracting Office recorded on this abstract all offers received SIGNATURE 69 Darlington Ave. In response to this solicitation.

Wilmington, North Carolina 28403

PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. BIDDERS

(Check A, B or C and complete D, E and F.)

A. OFFEROR A. OFFEROR

A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

(WITHOUT PROFIT)

NUMBER OF ADDENDA ISSUED 1 C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

(INCLUDING PROFIT)

All Projects

Base - Mobilization and Demobilization for all Base Items

1 Job $1,550,000.00 $1,550,000.00 $2,075,000.00 $2,075,000.00 $3,450,000.00 $3,450,000.00

0002 Performance and Payment Bonds for all Base Items 1 Job $75,800.00 $75,800.00 $50,000.00 $50,000.00 $100,000.00 $100,000.00

Option- Inter-project Transit Miles for unexpected moves for reasons to include environment concerns, navigational needs, funding purposes and more advantageous to the Government

0003AA Option - First 235 Miles 235 Miles $420.00 $98,700.00 $250.00 $58,750.00 $700.00 $164,500.00 0003AB Option - All Over 235 Miles *(NTE) 1,000 Miles $420.00 $420,000.00 $250.00 $250,000.00 $700.00 $700,000.00

Brunswick Harbor

Base - Maintenance Dredging, St Simons Range, Station 0+000 to -45+000B (Bin limits are required for placement in the Brunswick ODMDS)

0004AA First 1,100,000 cys 1,100,000 Cubic Yard $4.10 $4,510,000.00 $2.20 $2,420,000.00 $4.30 $4,730,000.00 0004AB All over 1,100,000 cys 200,000 Cubic Yard $4.10 $820,000.00 $2.20 $440,000.00 $3.50 $700,000.00

Cedar Hammock Range Stations 12+750 to 22+000

0005AA First 50,000 cys 50,000 Cubic Yard $8.55 $427,500.00 $6.30 $315,000.00 $13.00 $650,000.00 0005AB All over 50,000 cys 5,000 Cubic Yard $8.55 $42,750.00 $6.30 $31,500.00 $10.00 $50,000.00 0006 Option - Stand By Time Brunswick -------------- -------------- -------------- -------------- -------------- -------------- -------------- -------------- 0006AA Option - First day 1 Day $65,000.00 $65,000.00 $45,000.00 $45,000.00 $65,000.00 $65,000.00 0006AB Option - All over One Day *(NTE) 1 Day $65,000.00 $65,000.00 $45,000.00 $45,000.00 $75,000.00 $75,000.00

Option - Trawling Requirements (capture/relocation) Brunswick

0007AA Option - First 5 days 5 Days $5,600.00 $28,000.00 $4,200.00 $21,000.00 $6,500.00 $32,500.00 0007AB Option - All over 5 days *(NTE) 30 Days $5,600.00 $168,000.00 $4,200.00 $126,000.00 $6,500.00 $195,000.00

Savannah Harbor

Base - Maintenance Dredging, Tybee Knoll Cut Range, Jones Island/Bloody Point Range,Station 0+000 to -14+000B (Bin limits are required for placement in the Savannah ODMDS)

0008AA First 122,000 cys 122,000 Cubic Yard $4.85 $591,700.00 $4.00 $488,000.00 $5.50 $671,000.00 0008AB All over 122,000 cys 23,000 Cubic Yard $4.85 $111,550.00 $4.00 $92,000.00 $4.20 $96,600.00

Yes

REGIONAL HARBOR DREDGE FOR USACE SOUTH ATLANTIC

DIVISION, UNRESTRICTED

20% 20%

2122 York Road

Seattle, WA 98134

X

Oak Brook, IL 60523

Yes

5209 East Marginal Way S.

W912PM20B0008 5-Aug-20 4-Sep-20

Great Lakes Dredge & Docks Co., LLC Manson Constreuction Compnay

Electronic Equivalent OF 1419

Base - Maintenance Dredging, Bloody Point Range, Tybee Range,Station -14+000B to -50+000B (Bin limits are required for placement in the Savannah

ODMDS)

0009AA First 451,000 cys 451,000 Cubic Yard $4.05 $1,826,550.00 $4.10 $1,849,100.00 $4.50 $2,029,500.00 0009AB All over 451,000 cys 81,000 Cubic Yard $4.05 $328,050.00 $4.10 $332,100.00 $3.10 $251,100.00 0010 Option - Stand By Time Savannah -------- ------ ------ ------ ------ ------ ------ ------ 0010AA Option - One Day 1 Day $65,000.00 $65,000.00 $45,000.00 $45,000.00 $65,000.00 $65,000.00 0010AB Option - All over One Day *(NTE) 1 Day $65,000.00 $65,000.00 $45,000.00 $45,000.00 $75,000.00 $75,000.00

Option- Trawling Requirements (capture/relocation) Savannah

0011AA Option- First 5 days 5 Days $5,600.00 $28,000.00 $4,200.00 $21,000.00 $6,500.00 $32,500.00 0011AB Option- All over 5 days *(NTE) 30 Days $5,600.00 $168,000.00 $4,200.00 $126,000.00 $6,500.00 $195,000.00

Wilmington Harbor (OPTION) 0012 Option - Mob/Demob - Wilmington Harbor 1 Job $875,000.00 $875,000.00 $500,000.00 $500,000.00 $350,000.00 $350,000.00

Option - Maintenance Dredging, Wilmington Harbor, Baldhead Shoal Channel Reach 3

800,000 Cubic Yard $3.65 $2,920,000.00 $3.70 $2,960,000.00 $4.00 $3,200,000.00

Option - Peformance and Payment Bonds - Wilmington Harbor

1 Job $40,000.00 $40,000.00 $10,000.00 $10,000.00 $25,000.00 $25,000.00

0015 Option - Stand By Time Wilmington Harbor -------- ------ ------ ------ ------ ------ ------ ------ 0015AA Option - One Day 1 Days $58,000.00 $58,000.00 $45,000.00 $45,000.00 $65,000.00 $65,000.00 0015AB Option - All Over One Day *(NTE) 10 Days $58,000.00 $580,000.00 $45,000.00 $450,000.00 $75,000.00 $750,000.00

Option - Trawling Requirements (non-capture) Wilmington

0016AA Option - First Five Days 5 Days $3,600.00 $18,000.00 $4,000.00 $20,000.00 $8,000.00 $40,000.00 0016AB Option - All Over Five Days *(NTE) 10 Days $36,000.00 $360,000.00 $4,000.00 $40,000.00 $6,500.00 $65,000.00

Morehead City (OPTION) 0017 Option - Mob/Demob - Morehead City Harbor 1 Job $875,000.00 $875,000.00 $200,000.00 $200,000.00 $350,000.00 $350,000.00

Option - Maintenance Dredging, Morehead City Harbor, Range A Station 110+00-165+00

600,000 Cubic Yard $3.85 $2,310,000.00 $4.25 $2,550,000.00 $5.50 $3,300,000.00

Option - Performance and Payment Bonds, Morehead City Harbor

1 Job $32,700.00 $32,700.00 $10,000.00 $10,000.00 $25,000.00 $25,000.00

0020 Option - Stand By Time Morehead City -------------- -------------- -------------- -------------- -------------- -------------- -------------- -------------- 0020AA Option - One Day 1 Day $58,000.00 $58,000.00 $45,000.00 $45,000.00 $65,000.00 $65,000.00 0020AB Option - All Over One Day *(NTE) 10 Days $58,000.00 $580,000.00 $45,000.00 $450,000.00 $75,000.00 $750,000.00

Option - Trawling Requirements (Non-Capture) Morehead City

0021AA Option - First Five Days 5 Day $3,600.00 $18,000.00 $4,000.00 $20,000.00 $8,000.00 $40,000.00 0021AB Option - All Over Five Days *(NTE) 10 Days $3,600.00 $36,000.00 $4,000.00 $40,000.00 $6,500.00 $65,000.00

Option- Trawling Requirements (capture/relocation) Morehead City

0022AA Option- First 5 days 5 Days $4,800.00 $24,000.00 $4,200.00 $21,000.00 $8,000.00 $40,000.00 0022AB Option- All over 5 days *(NTE) 30 Days $4,800.00 $144,000.00 $4,200.00 $126,000.00 $6,500.00 $195,000.00

*NTE: Not to be Evaluated

TOTAL AS READ AT OPENING

$1,724,500.00 $2,183,750.00 $2,433,750.00 $3,714,500.00

$5,893,250.00 $3,272,500.00 $3,443,500.00 $6,227,500.00

$2,950,850.00 $2,827,200.00 $2,998,200.00 $3,145,700.00

$3,911,000.00 $3,535,000.00 $4,025,000.00 $3,680,000.00

$3,317,700.00 $2,846,000.00 $3,462,000.00 $3,820,000.00

$17,797,300.00 $14,664,450.00 $16,362,450.00 $20,587,700.00

*Electronic Equivalent OF 1419

TOTAL AMOUNT OF LINE ITEMS 0001 - 0003AB

TOTAL AMOUNT OF LINE ITEMS 0004 - 0007AB

TOTAL AMOUNT OF LINE ITEMS 0008 - 0011AB

TOTAL AMOUNT OF LINE ITEMS 0012 - 0016AB

TOTAL AMOUNT OF LINE ITEMS 0017 - 0022AB

TOTAL AMOUNT OF LINE ITEMS 0001 - 0022AB

Electronic Equivalent OF 1419

2020-09-04T16:08:04-0400