RFQ_Inquiries.pdf

PDF 122 KB Posted

Attached to
Temporary Fire Department Quarters Federal contract opportunity
Solicitation number
W912PM18QVI01
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

RFQ Q&A

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Inquiries: W912PM18QVI01

1. Combined Synopsis/Solicitation calls for delivery of 60 days from date of notice to proceed. The Scope of Work, Paragraph 7, Period of Performance calls for delivery of 45 days from date of notice to proceed. Which is correct?

60 days from notice to proceed is correct. The SOW will be corrected in Amendment 0003.

2. There is no SF 1449 attached to the solicitation, will one be forthcoming?

An SF 1449 will be issued at time of award.

3. There is no SF 30 attached to Amendment 1, will one be forthcoming?

Amendments to a Combined Synopsis Solicitation do no utilize an SF 30.

4. Amendment 1 modifies the required submission date to 09 December 2017.

Proposal due dates are normally not on a Saturday. Is it your intent for the submission to be due on that Saturday?

The intent was to receive proposals 15 days after solicitation date. 09 December just so happens to be on a Saturday.

5. The Scope of Work, Paragraph 3.2 CLIN 0002 includes the term “(Optional)”. In no other place in the Combined Synopsis/Solicitation or the Scope of Work, is the terminology of optional used. Is there any “optional” consideration that needs to be taken into account in preparing a response to this solicitation?

The original intent was to issues CLIN 0002 as an optional item. This has since changed. Both CLIN 0001 and 0002 will be awarded under this solicitation.

6. The Scope of Work ATTACHMENT B Conceptual Modular Structure Layout contains a floor plan figure depicting dimensions 23’- 0” x 60’– 0”. Is there anything that would preclude this foot print to be modified to 30’-0” x 60’- 0” (provided at no additional cost to the Government) to accommodate our most readily available modular structure and still be considered in compliance with the Scope of Work?

A 30’-0” x 60’- 0” structure is acceptable.

7. Are the structures required to be new, or may they be used?

The structures must be new.