Plans_6

7 MB Posted

Attached to
The Tucson Drainage Area Project - Phase 2B Federal contract opportunity
Solicitation number
W912PL-10-B-0010
Issued by
Department of the Army Corps of Engineers Engineering District Los Angeles

About this file

Plans 6

Text of this file

...\Pdiv4751-W01.dgn 5/25/2010 6:06:43 PM

...\Pdiv4751-W02.dgn 5/25/2010 6:08:08 PM

...\Pdiv4751-W03.dgn 5/25/2010 6:08:30 PM

Table 700-1: Wire Color Codes

Color Source White New Transmission Main Blue Casing Pipe (Jack and Bores) Black Foreign Metallic Pipeline Yellow Permanent Reference Cell Orange Isolated Pipe, Valve, Fitting, or existing pipeline, etc..

Red Anode

Green Negative Structure Lead to Rectifier off of Protected Pipe

Table 700-2: Exothermic Welding Materials for DIP

Erico-Cadweld:

Welder Weld Metal Conductor Sleeve Pipe Dia.

CAHBA-1G-16 CA25XF-19 #10 B133-1L 16”

CAHBA-1H-16 CA25XF-19 #6 -- 16”

CAHBA-1V-16 CA45XF-19 #6 B112 16”

CAHBA-1V-16 CA45XF-19 #2 -- 16”

CAHBA-1G-24 CA25XF-19 #10 B133-1L 24”

CAHBA-1H-24 CA25XF-19 #6 -- 24”

CAHBA-1V-24 CA45XF-19 #6 B112 24”

CAHBA-1V-24 CA45XF-19 #2 -- 24”

CAHBA-1G CA25XF-19 #10 B133-1L OVER 24”

CAHBA-1H CA25XF-19 #6 -- OVER 24”

CAHBA-1V CA45XF-19 #6 B112 OVER 24”

CAHBA-1V CA45XF-19 #2 -- OVER 24”

Continental-Thermoweld:

Welder Weld Metal Conductor Sleeve Pipe Dia.

M-159-16 45CI #10 A-201 16”

M-157-16 25CI #6 -- 16”

M-161-16 45CI #6 A-202 16”

M-161-16 45CI #2 -- 16”

M-159-24 45CI #10 A-201 24”

M-157-24 25CI #6 -- 24”

M-161-24 45CI #6 A-202 24”

M-161-24 45CI #2 -- 24”

M-159 45CI #10 A-201 OVER 24”

M-157 25CI #6 -- OVER 24”

M-161 45CI #6 A-202 OVER 24”

M-161 45CI #2 -- OVER 24”

Table 700-5: Pipeline Contact Information

Company Contact Name Phone Number Notification Requirements

El Paso Natural Gas Richard Welch (520) 574-4924 72 Hours El Paso Natural Gas Rudy Marquez (520) 574-4929 72 Hours

Southwest Gas Corporation Pat Campbell (520) 794-6021 48 Hours Central Arizona Project Sharon Hood (623) 869-2387 Min. One Month

Kinder Morgan Energy Partners Dale Ross (520) 514-1065 x984 48 Hours

...\Pdiv4751-W04.dgn 5/25/2010 6:09:29 PM

...\Pdiv4751-W05.dgn 5/25/2010 6:09:51 PM

...\Pdiv4751-W06.dgn 5/25/2010 6:10:29 PM

...\Pdiv4751-W07.dgn 5/25/2010 6:11:20 PM

...\Pdiv4751-W08.dgn 5/25/2010 6:13:05 PM

...\Pdiv4751-W09.dgn 5/25/2010 6:14:37 PM

...\Pdiv4751-W10.dgn 5/25/2010 6:15:20 PM

...\Pdiv4751-W11.dgn 5/25/2010 6:16:13 PM

Pdiv4751-W01
Pdiv4751-W02
Pdiv4751-W03
Pdiv4751-W04
Pdiv4751-W05
Pdiv4751-W06
Pdiv4751-W07
Pdiv4751-W08
Pdiv4751-W09
Pdiv4751-W10
Pdiv4751-W11

Other files for this federal contract opportunity

Other files attached to The Tucson Drainage Area Project - Phase 2B, newest first.
File Type Posted
Am5.pdf PDF
Spec_Am4.pdf PDF
Plans_Am4.pdf PDF
Plans_Am3.pdf PDF
Spec_Am3.pdf PDF
Am2.pdf PDF
Plans_Am1.pdf PDF
Spec_Am1.pdf PDF
Plans_3 —
W912PL-10-B-0010_Spec.pdf PDF
Plans_5 —
Plans_4 —
Plans_2 —
Plans_1 —
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .