03_-_Attachment_II_Drawings.pdf
PDF 249 KB Posted
- Attached to
- Replace Wooden Walls / Electrical Federal contract opportunity
- Solicitation number
- W912PB-16-T-8019
About this file
W912PB-16-T-8019 Attachment II Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 01_-_W912PB-16-T-8019_Final.pdf | ||
| 02_-_Attachment_I_Specification.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
SHEET TITLE
1 OF
2 OF
3 OF
GRAFENWOEHR TRAINING AREA
FREIHUNG
GRAFENWOEHR
ESCHENBACH
KIRCHENTHUMBACH
HILL 459
KUERMREUTH
SORGHOF
AUERBACH
SITE 17
GRAFENWOEHR
MAIN CAMP
SOUTH CAMP
VILSECK
LOCATION PLAN
LAGEPLAN
SCALE 1 : 25000
MASSTAB 1 : 25000
INSTALLATION
PROJECT TITLE
SHEET TITLE
DATE
DATE
DATE
DATE
DRAWN BY PROJECT ENGR CHECKED BY
DATE PROJECT NO
SHEET
OF
SIGNATURE SIGNATURE
SIGNATURE
Training Area Grafenwoehr GM 31P
SIGNATURE
SIGNATURE
MASTER PLANNER
ENGINEERING DIV
ERWIN SCHMIEGERERWIN SCHMIEGER
DATE DESCRIPTION DRAWN BY APPROVEDREV NO
USER/RANGE OPERATIONS
RTLP
DUWAIN S. MARING, C/RTLP
SAFETY
SIGNATURE
DATE DATE
USAG BAVARIA/RES BRANCH/ENG DIV
USA GARRISON BAVARIA
SCALE
DIRK L. KELLAR, SAFETY DIRECTOR
JAMES M. BEATTY, C/Master Planning
COVER SHEET
COVER SHEET
DECKBLATT
1 : 25000
RANGE ENGINEERING BRANCH
ERWIN RAUCH, C/RES
REVIEW: PREFINAL 11 MAY 2015
Replace Wooden Walls with Gabions at Range 117 Calibration, GTA - Electrical Work
Calibration Range 117
Calibration Schiessbahn 117
Replace Wooden Walls with Gabions at Range 117 Calibration, GTA - Electrical Work
10 MAY 2016
RANGE LAYOUT/ELECTRICAL & DATA CABLING AT TARGET PITS/CJB
JOHN A. HOWARD, C/Engr Div JEFFREY F. ANDERSON, LTC, FA, C/RANGE OPS
PROJECT NO. TI-00818-5J
TI-00818-5J
SEVENTH ARMY JOINT MULTINATIONAL TRAINING COMMAND
FINAL SUBMISSION: 11 MAY 2016
P
M T
A R
V1
V2
V3
V4
V5
V6
V7
V8
V9
V10
V11
V12
V13
V14
V15
V16
V17
V18
V19
V20
MT1
MT2TS4
TS3
TS2
TS1
Z1
Z2
LM1
LM2
500 m TARGET LANE 500 m ZIELLINIE
800 m TARGET LANE
950 m TARGET LANE
800 m ZIELLINIE
950 m ZIELLINIE
1200 m TARGET LANE
1200 m ZIELLINIE
1500 m ZIELLINIE
1500 m TARGET LANE
4 TARGET LANES
4 ZIELBEREICHE
RANGE 117A
LEGEND
LEGENDE
CALIBRATION RANGE
NYY 4x10
A2YF(L)2Y 10x2x0.8
NYY 4x10
A2YF(L)2Y 10x2x0.8
NYY 4x10
A2YF(L)2Y 10x2x0.8
NYY 4x10
A2YF(L)2Y 10x2x0.8
NYY 4x16
A2YF(L)2Y 10x2x0.8
KABEL ABKLEMMEN
KABEL FREILEGEN
KABEL ABKLEMMEN
INSTALLATION
PROJECT TITLE
SHEET TITLE
Training Area Grafenwoehr GM 31P
DATE DESCRIPTION DRAWN BY APPROVEDREV NO
TARGET EMPLACEMENTS
ZIELGRUBEN
MASSTAB 1 : 20
SCALE 1 : 20
ELECTRICAL POWER PANEL
NIEDERSPANNUNGSVERTEILER
DATA CONNECTION BOX
DATENANSCHLUSSKASTEN
CJB
ELECTRICAL POWER PANEL
NIEDERSPANNUNGSVERTEILER
POTENTIAL EQUALIZATION BUSBAR
POTENTIALAUSGLEICHSSCHIENE
PROTECTION CONDUIT
KABELSCHUTZROHR
DATA CONNECTION BOX
DATENANSCHLUSSKASTEN
POTENTIAL EQUALIZATION BUSBAR
POTENTIALAUSGLEICHSSCHIENE
PROTECTION CONDUIT
KABELSCHUTZROHR
NOTES / ANMERKUNGEN :
2. SECURE GROUND WIRE TO BOX UNDER AT EXTERIOR BOLT, M8.
ERDLEITER AM AEUSSEREN BOLZEN, M8, DES KASTENS FESTKLEMMEN.
4. ALL CABLE LEAD-IN TO BE WATER TIGHT, IN STEEL.
6. THE INSTALLATION CARRIER MUST BE EQUPPED WITH FOUR BOLTS M5 X 30MM FOR LATER
CABLE AT THE POINT OF ENTRANCE.
1. ENCLOSURE SHALL BE HIGH-GRADE STEEL, DIMENSIONS: 500mm x 4OOmm x 210mm.
GEHAEUSE AUS EDELSTAHL, ABMESSUNGEN: 500mm x 400mm x 210mm, IP 66, NEMA 4X
ALLE KABELEINFUEHRUNGEN SIND WASSERDICHT, IN EDELSTAHL, AUSZUFUEHREN.
ALL OPENINGS WITHOUT CABLES MUST BE CLOSED WITH PLASTIC BLIND STOPPER
TO BE WATER TIGHT.
ALLE OEFFNUNGEN OHNE KABEL SIND MIT KUNSTSTOFFBLINDSTOPFEN, WASSERDICHT, ZU SCHLIESSEN.
UM DIE MONTAGE DER VIER GEWINDEBOLZEN M5 X 30MM (PARAGRAPH 6) ZU ERMOEGLICHEN.
DIE MONTAGEPLATTE IST MIT VIER STEHBOLZEN M5 X 30MM ZU BESTUECKEN ZUR SPAETEREN
OF THE CARRIER TO ALLOW THE INSTALLATION OF THE TREADED BOLTS M5 X 30MM (PARAGRAPH 6).
8. DATACABLES MUST BE GROUNDED AT THE CJB CASING
DATENKABELSCHIRME AM GEHAEUSE DATENANSCHLUSSKASTEN ERDEN
9. ALL CABLE PIGTAILS WILL BE TAGGED WITH PERMANENT TAGS ATTACHED TO THE
IP 66, NEMA 4X
CABLE JUNCTION BOX
KABELANSCHLUSSKASTEN
DATA OUT (IF REQUIRED)
DATA IN
CJB SIDE VIEW
CJB SEITENANSICHT
DATENWEITERFUEHRUNG (WENN BENOETIGT)
DATENZULEITUNG
SCALE 1 : 5
MASSTAB 1 : 5
BOLT M5 x 30
BOLZEN M5 x 30
BOLT M5 x 30
BOLZEN M5 x 30
SCHARNIER
HINGE
CJB DRAUFSICHT
CJB TOP VIEW
TRENNKLEMMEN
D A
T E
N
D A
T A
CONTROL CABLE
TO TARGET
ZUM ZIEL
5. INSTALLATION CARRIER MUST BE INSTALLED AT BOLTS AND EQUIPPED WITH 20 SEPARATION
SEPARATION TERMINALS
INSTALLATION OF AN ADDITIONAL CARRIER FOR ELECTRONIC EQUIPMENT.
MONTAGE EINER ZUSAETZLICHEN MONTAGEPLATTE FUER ELEKTRONIKBAUTEILE.
Prefab 80x100x50
Gabion
Gabion
Gravel/Schotter
Existing Prefab 180x200x15cm
Besteh. Fertigteil 180x200x15cm
Fertigteil 80x100x50
SCALE 1 : 2000
MASSTAB 1 : 2000
Replace Wooden Walls with Gabions at Range 117 Calibration, GTA - Electrical Work
TYPICAL TARGET PIT
TYPISCHE ZIELGRUBE
SAND
CABLE HOOD
KABELHAUBE
WARNING RIBBON
KABELWARNBAND
GROUNDING STEEL V4A
ERDUNGSSTAHL V4A
NYY 4x10 qmm
V3
NV
500m
NV
800m
NV
950m
NV
NV
1500m
1200m
NYY 4x10 qmm
NYY 4x10 qmm
NYY 4x10 qmm
NYY 4x16 qmm
SCHEMATIC LOW VOLTAGE CONNECTIONS TARGETS
SCHEMATIK NIEDERSPANNUNGSANSCHLUSS ZIELE
new existing existing existing existing
REVIEW: PREFINAL 11 MAY 2015
DATE
DATE
DATE
DATE
DRAWN BY PROJECT ENGR CHECKED BY
DATE PROJECT NO
SHEET
OF
SIGNATURE SIGNATURE
SIGNATURE
SIGNATURE
SIGNATURE
MASTER PLANNER
ENGINEERING DIV
ERWIN SCHMIEGERERWIN SCHMIEGER
USER/RANGE OPERATIONS
RTLP
DUWAIN S. MARING, C/RTLP
SAFETY
SIGNATURE
DATE DATE
USAG BAVARIA/RES BRANCH/ENG DIV
SCALE
DIRK L. KELLAR, SAFETY DIRECTOR
JAMES M. BEATTY, C/Master Planning
RANGE ENGINEERING BRANCH
ERWIN RAUCH, C/RES
JOHN A. HOWARD, C/Engr Div JEFFREY F. ANDERSON, LTC, FA, C/RANGE OPS
RANGE LAYOUT WITH CABLING
SCHIESSBAHNUEBERSICHT MIT VERKABELUNG
L1 L1
L1
L1
L1L1
L1
L2
L2 L2
L2
L2
L2L2
L3
L3
L3 L3
L3
L3
ZIEL ANGESCHLOSSEN AN PHASE L1 (L2, L3)
L1 (L2, L3)
TARGET CONNECTED TO PHASE L1 (L2, L3)
USA GARRISON BAVARIA
FINAL SUBMISSION: 11 MAY 2016
L3 L3 L3 L3L1 L1 L1 L1L2 L2 L2
DIE MONTAGEPLATTE IST AUF STEHBOLZEN ZU MONTIEREN UND MIT 20 TRENNKLEMMEN UND EINER
ERDUNGSKLEMME AUF TRAGSCHIENE ZU BESTUECKEN. MINDESTABMESSUNG DER MONTAGEPLATTE BEACHTEN, TERMINALS AND ONE GROUNDING TERMINAL, MOUNTED AT A CARRIER RAIL. NOTICE MINIMUM SIZE
7. MOUNTING OF THE BOX AT CONCRETE WALL - BOX EQUIPPED WITH FOUR HIGH GRADE
STEEL SUPPORTS
DER KASTEN WIRD AN EINE BETONWAND MONTIERT - KASTEN BESTUECKT MIT VIER
EDELSTAHLLASCHEN
3. DOOR HINGES MOUNTED LEFT, INCLUDING INTERIOR GROUNDING CONNECTION OF THE DOOR
WITH THE BOX ITSELF
DECKELSCHARNIERE LINKS, INKLUSIVE ERDUNGSVERBINDUNG INNEN VON DECKEL MIT DEM GRUNDKASTEN
BOLZEN ERDUNG M8
GROUNDING BOLT M8
BOLZEN ERDUNG M8
GROUNDING BOLT M8
A2YF(L)2Y 10x2x0.8
GROUNDING STEEL V4A
CABLE TRENCH
KABELGRABEN
STEUERKABEL
SCALE 1 : 10
MASSTAB 1 : 10
V4 V5
V9 V10
ALLE KABELENDEN SIND DAUERHAFT, AN DER EINLASS-STELLE, ZU KENNZEICHNEN.
DATA CABLES
DATENKABEL
POWER CABLE
STROMKABEL
TI-00818-5J1 : 5/10/20/200010 MAY 2016
Beton-Fertigteil, Bestand und neu (11 Stck)
Prefab Concrete Element, existing & new (11 each)
NYY 4x10/NYY 4x16
VEHICLE TARGET PIT, EXISTING
FAHRZEUGZIELEINHEIT, BESTAND
CABLE NYY 4x10
KABEL NYY 4x10
DATA CABLE A2YF(L)2Y 10x2x0.8
DATENKABEL A2YF(L)2Y 10x2x0.8
ELEKTROVERTEILER, BESTAND
ELECTRICAL DISTRIBUTION, EXISTING
ELECTRICAL DISTRIBUTION, NEW
ELEKTROVERTEILER, NEU
DATA MAIN DISTRIBUTION, NEW
DATENHAUPTVERTEILER, NEU
| TI 00818 5J_1 Drawing |
| TI 00818 5J_2 Drawing |
File details come from the government source that posted it. Updated .