05_-_Attachment_II_-_Drawings.pdf
PDF 977 KB Posted
- Attached to
- Replace Dishwasher System, Bldg # 612, USAG Bavaria - Rose Barracks Federal contract opportunity
- Solicitation number
- W912PB-16-B-8106
About this file
Attachment II - Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_Instructions.doc | DOC document | |
| 07_-_Attachment_IV_-_612_Room_7_POS_44.005.pdf | ||
| W912PB-16-B-8106-0002..pdf | ||
| 06_-_Attachment_III_-_612_Room_7_POS_37.005.pdf | ||
| W912PB-16-B-8106-0001.pdf | ||
| Amendment_Instructions.doc | DOC document | |
| 01_-_02_-Cover_Letter_IFB.pdf | ||
| 04_-_Attachment_I_-_Specification.pdf | ||
| 03_-_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
bindend und können sich auf Grund örtlicher Gegebenheiten ändern.
Lage der vorhandenen und geplanten baulichen Anlagen sind nicht
Dieser Plan dient nur als Kalkulationshilfe. Maße, Querschnitte und structures are not binding and can change due to local conditions.
cross sections and location of existing and planned physical
The purpose of this drawing is to ease calculation. Dimensions, Grafenwoehr Military Community - Rose Barracks
USAG BAVARIA
V NORE
INSTALLATION
PROJECT TITLE
DATE DESCRIPTION DRAWN BY APPROVED
ENGR DIV
SIGNATURE
NAME (PRINT)
DATE USING UNIT DATE
NAME (PRINT)
SIGNATURE
Benno Meier, C/Design Section Vilseck
DATE
NAME (PRINT)
SIGNATURE
DESIGN / PROJ MGMT BR
James M. Beatty, Master Planning
DATE
NAME (PRINT)
SIGNATURE
MASTER PLANNER
DRAWN BY PROJECT ENGR CHECKED BY SHEET
OF
PROJECT NOCALEDATE S
John A. Howard, C/Engr Div
38°C
Machine exhaust air extraction via fan with fresh water inlet temperature about 12 °C air outlet quantity approx. m‡/h, temp. approx. ; relative humidity approx. %, air exhaust openings 28 cm†
6.1
74°C
140 ( 2x70 )air outlet quantity approx. m‡/h, temp. approx. ; relative humidity approx. %, air exhaust openings 2 x 79 cm†
6.2 100
Heat load of wash-up area:
Wichtige Hinweise :
Allgemein
Größen. Rohrdurchführungen und Abflussrohre dürfen max. 50 mm, Versorgungsleitungen 100 mm über OKFF ragen.
Die Darstellung der Medienanschlüsse bezeichnet den Installationsraum und nicht den tatsächlich zu fertigenden Durchbruch.
Alle Leitungen (Wasser, Dampf, Kondensat und PHW) sind vor Inbetriebnahme der Spülmaschine ordnungsgemäß zu reinigen bzw. zu spülen !
Die Reinigung der Anlage darf nur mit geeigneten Produkten erfolgen und der Kontakt mit korrosiven Substanzen ist auszuschließen.
Die Maschine ist für die Aufstellung auf einen geeigneten Fußboden bestimmt.
1.1
DN 70
Pos.: 50
MP000058269.1.0
2.1 3
Verbrauch ca. fuer Tankfuellung (TF) max. 0,54 mmol/l CaCO (max. 3° dH)
Weich - Warmwasser 50°C DN20
G 3/4 a
232 l
2.2 Verbrauch ca. fuer Klarspuelung
max. 0,54 mmol/l CaCO (max. 3° dH)
Weich - Kaltwasser, max.
DN20
G 3/4 a
150 l/h
18 °C
3.1
El. Zuleitung zur Maschine
Anschlussdimensionierung freies Kabelende ab OKFF max. Anschlussquerschnitt
ca. 4,0 m
/Nominalstrom / - Leistung
Potentialausgleichsleitung
3N PE 400V 50Hz
61 kW
35 mm†
88,5 A
88,5 A zulauftemperatur von ca. 12°C
Abluftventilator der Maschine bei einer Frischwasser -
Abluftmenge ca. 150 m‡/h, Ablufttemp. ca. 38°C
Rel. Feuchte ca. 90 %, Luftaustrittsflaeche 28 cm†
6.1
Abluftmenge ca. 140 (2x70) m‡/h, Ablufttemp. ca. 74°C
Rel. Feuchte ca. 100 %, Luftaustrittsflaeche 158 (2*79) cm† 6.2
Waermebelastung des Spuelraumes:
Sensibel ca.
Gesamt ca.
Latent ca.
55% rel. Feuchte.
zogen auf eine Raumtemperatur von 22°C bei der Maschine angepassten Spuelgutmenge, be-
Spuelgut, gilt fuer einen Spuelbetrieb mit einer ohne inkl. Abluft 6.1 Gesamtlast der Maschine hinzuzurechnen. Die Raumbelueftung ist nach VDI 2052 auszulegen.
Fuer die gesamte Restraumbelastung ist das Spuelgut nach VDI 2052
8,2 kW
5,5 kW
2,7 kW
Siphon
Ablauf
Important information:
General
The representation of the media connections in the drawings describes the installation space and not the opening that actually needs to be made.
All lines (water, steam, condensate and hot water pump) must be cleaned and/or flushed thoroughly before starting up the washer!
The plant may only be cleaned with suitable products; all contact with corrosive agents must be avoided. The machine is destined for installation onto an appropriate floor.
2.1 3
Soft - hot water 50°C max. 0,54 mmol/l CaCO / 53,4 ppm/CaCO (max.3°GH) consumption approx. for tank filling (TF)
DN20
G 3/4 a
232 l
1.1
DN 70
drain position in floor, allowing for trap from machine
Typ:Item: 50
2.2 consumption approx. for final rinse max. 0,54 mmol/l CaCO / 53,4 ppm/CaCO (max.3°GH)
Soft - mains cold water, max.
DN20
G 3/4 a
150 l/h
18 °C
3.1 electrical supply to the machine power cord designed for free cable end from FFL max. cable cross section approx. 4,0 m standard electrical current / power
Voltage equalising cable
3N PE 400V 50Hz
61 kW
88,5 A
88,5 A
35 mm† percept. approx.
total approx.
latent approx.
of 55% to a room temperature of 22°C with rel. humidity quantities adapted to the machine size, referring without dishes, valid for operation of dishware
, incl. waste air 6.1Total heat load of machine
VDI 2052.
added acc. to VDI 2052. The room ventilation has to be sized acc. to
For the complete remaining heat load of the room the washware has to be
2,7 kW
5,5 kW
8,2 kW
Pipe feed-through and drain pipe ends must protrude max. 50 mm, supply lines 100 mm above top edge finished floor.
10 Rundriemenförderband / RF conveyor
20 Tablettstapler / tray stacker
30 Abwurfschaechte / waste chute
40 Sortiertisch fuer Kleinteile, fahrbar / sorting table for small pa rts, mobile
50 Geschirrspülmaschine B-M54 V8 P6 / dish washing machine
B-M54 V8 P6
FRANZ WISMET FRANZ WISMET FRANZ WISMET
06.04.2016 3GM-08715-5J
REPLACE DISHWASHER, BUILDING # 612
FLOOR / INSTALLATION PLAN, ROOM 7
A
Stauschaltung
Umschalter fuer
Ein-Aus, Not-Halt
Hoehenbegrenzung
550850 800 800 600 6001000 600 400
1400 2200 1000
6.2
MP000058248.1.0
1.1
6.1
3.1
2.2
2.1
Trennung/Separation
400500
6.2
2302000
22306920620
9770 10
N is c h e
A
B A-B
A
B
Ansicht A
/on site odour trap
(above or underneath the floor level) height limiting on-off, emergency-stop alteration switch for queue-up device
30 50
A queue-up device
/ Light sensor for
Stauschaltung
Lichttaster fuer
Passblende nach Aufmass
Siphon bauseits
(über oder unter der Decke)
450 365
MP000058248.1.0
2240 Nische
NOT-AUS
eingemuldet
Sicherheitshinweis:
Zur Vermeidung von Unfaellen u.Verletzungen, kann die Foerderanlage nur mit einer montierten Unterbauverkleidung in Betrieb genommen werden.
Schnitt A-B Ansicht B is mounted.
into operation if the substructure cladding the transport system can only be set
To avoid any accidents and injuries, / Safety note:
recessed
/safety off switch
Pos. 40
500 360
520 WD
W
D
1:20
6.1
Trennung/Separation
Rundriemenfoerderanlage
Round Belt Conveyor System
Rundriemenfoerderanlage
Round Belt Conveyor System
R u n d r ie m e n f o e r d e r a n la g e
R o u n d
B e lt
C o n v e y o r
S y s t e m
Foerderanlage
Conveyor System
G e s c h ir r b r a u s
T a b le w a r
B r a u s e
Geschirrspuellmaschine
Disch Wasching Machine
S c h r e ib p u lt
W r it
C o n s o le
Demolition Sanitary
Abbruch Sanitaer
Demolition of Dish Washing System
Abbruch Geschirrspuelanlage
Demlition Structur
Abbruch Bau
Structur Work
Arbeiten Bau
B e s t a n d
E x is t in g
New/Neu
New/Neu
New/Neu
New/Neu
B o d e n s c h li t z
G r o u n d
S lo t
.0
ca. 2.60
.3
1.95
.1
4.30
5.60
2.25
.0
.1
BH 86 2.25
1.38
SCHRANK 1500*600*1200MM
CABINET 1500*600*1200MM
WASSERANSCHLUSS
WATER CONNECTION
28/28/15
Sanitary
Sanitaer
DN100
Neu
DN100
New
Neu DN100
New DN100
Neu DN50
New DN50
VENT HUT
ABLUFTHAUBE
DN300
D N
D N
DN200
UK205
U K
RH bis Decke 325
RH bis Rohdecke 4.60
VENTILATION
LUEFTUNG
25 25 25 25 25
WARMWASSERANSCHLUSS
HOT WATER CONECTION
KALTWASSERANSCHLUSS
COLD WATER CONECTION
25 25 25 25 25
HWS HWS
THERM
Trinkwasser Zirkulation
ZIRCULATION
WASTE WATER GROUNDLINE
Schmutzwasser-Grundleitung
Trinkwasser warm
WARM WATER
COLD WATER
Trinkwasser kalt
SHUT OFF VALVE
Absperrventil
CLACK VALVE
Entleerungsventil
WASTE VALVE
FUNNEL OUTLET
Trichterauslauf
SOFTENING EQUIPMENT
EH
Rohrtrenner
PIPE DISCONNECTOR
HWS
Absperrventil mit Rueckflussverhinderer
HAUSWASSERSTATION
HOUSE WATER STATION
Enthaertungsanlage
EH EH
Raum 7
Room 7
Raum 7
Room 7
Raum 7
Room 7
Raum 7
Room 7
Raum 7
Room 7
Raum 7
Room 7
28/28
50/40/2550/40/25
Grafenwoehr Military Community - Rose Barracks
USAG BAVARIA
V NORE
INSTALLATION
PROJECT TITLE
DATE DESCRIPTION DRAWN BY APPROVED
ENGR DIV
SIGNATURE
NAME (PRINT)
DATE USING UNIT DATE
NAME (PRINT)
SIGNATURE
Benno Meier, C/Design Section Vilseck
DATE
NAME (PRINT)
SIGNATURE
DESIGN / PROJ MGMT BR
James M. Beatty, Master Planning
DATE
NAME (PRINT)
SIGNATURE
MASTER PLANNER
DRAWN BY PROJECT ENGR CHECKED BY SHEET
OF
PROJECT NOCALEDATE S
John A. Howard, C/Engr Div bindend und können sich auf Grund örtlicher Gegebenheiten ändern.
Lage der vorhandenen und geplanten baulichen Anlagen sind nicht
Dieser Plan dient nur als Kalkulationshilfe. Maße, Querschnitte und structures are not binding and can change due to local conditions.
cross sections and location of existing and planned physical
The purpose of this drawing is to ease calculation. Dimensions, 1: 5006.04.2016
FRANZ WISMET FRANZ WISMET FRANZ WISMET
REPLACE DISHWASHER, BUILDING # 612
GM-08715-5J
UTILITYS PLAN, ROOM 7
bindend und können sich auf Grund örtlicher Gegebenheiten ändern.
Lage der vorhandenen und geplanten baulichen Anlagen sind nicht
Dieser Plan dient nur als Kalkulationshilfe. Maße, Querschnitte und structures are not binding and can change due to local conditions.
cross sections and location of existing and planned physical
The purpose of this drawing is to ease calculation. Dimensions, Grafenwoehr Military Community - Rose Barracks
USAG BAVARIA
V NORE
INSTALLATION
PROJECT TITLE
DATE DESCRIPTION DRAWN BY APPROVED
ENGR DIV
SIGNATURE
NAME (PRINT)
DATE USING UNIT DATE
NAME (PRINT)
SIGNATURE
Benno Meier, C/Design Section Vilseck
DATE
NAME (PRINT)
SIGNATURE
DESIGN / PROJ MGMT BR
James M. Beatty, Master Planning
DATE
NAME (PRINT)
SIGNATURE
MASTER PLANNER
DRAWN BY PROJECT ENGR CHECKED BY SHEET
OF
PROJECT NOCALEDATE S
John A. Howard, C/Engr Div
JULIANA FUCHS-HOECHT
06.04.2016 3GM-08715-5J
REPLACE DISHWASHER, BUILDING # 612
1:20
ELECTRICAL INSTALLATION, ROOM 7
3JOHANNES LEDWAJOHANNES LEDWA
A
MP000058248.1.0
A
Ansicht A
LEGENDE
LEGEND
ZLT
SUB-DISTRIBUTION
UNTERVERTEILUNG
E
1 ELEKTROANSCHLUSS (GESCHIRRSPUELER)
E
ELECTRICAL CONNECTION (CONVEYOR)
ELEKTROANSCHLUSS (FOERDERBAND)
KOPPELRELAIS - ZLT GESCHIRRSPUELER (NEU)
ERDUNGSBAND (a.P. AN DER WAND VORHANDEN)
ERDUNGSANSCHLUSSPUNKT (NEU), GESCHIRRSPUELER UND FOERDERBAND
JS(ST)Y ZLT-SCHWACHSTROMLEITUNG
NYY UND NYM - LEITUNGEN
ERDUNGSANSCHLUSSPUNKT ERDUNGSBAND FUER NYM / NYY KABEL
E3
E
E
ERDUNGSBAND VORHANDEN, AUF PUTZ
NIROKABELKANAL VERLEGEN.
FUER DAS FOERDERBAND MIT
VON DER NEUEN UNTERVERTEILUNG
MIT EINER NYM-I 5x4qmm LEITUNG
HERSTELLEN DES ELEKTROANSCHLUSSES
ERDUNGSBAND UND NEUES FOERDERBAND
MIT NYM-I 1x16 qmm AM VORHANDENEN
HERSTELLEN DER POTI-LEITUNG
ERDUNGSBAND UND GESCHIRRSPUELER
NYM-I 1x16 qmm AM VORHANDENEN
HERSTELLEN DER POTI-LEITUNG MIT
FUER DEN GESCHIRRSPUELER.
VON DER NEUEN UNTERVERTEILUNG
MIT EINER NYY-I 5x35qmm LEITUNG
HERSTELLEN DES ELEKTROANSCHLUSSES
GESCHIRRSPUELER IN BETONBODENSCHLITZ
NEUE ANSCHLUSSLEITUNG NYY-I 5x35qmm
WASCHSTRASSE
IP 65 NEUE UNTERVERTEILUNG
UND ALS SCHUTT ENTSORGEN
ALTE UNTERVERTEILUNG DEMONTIEREN
ERDUNGSBAND VORHANDEN, AUF PUTZ
NIRO-KABELKANAL SOWIE IN DER DECKE MIT PVC ROHR
IM BETONBODENSCHLITZ MIT FLEX-SCHUTZROHR,
ZUM ZLT-STEUERSCHRANK, DACHBODEN VERLEGEN
ZLT - SCHWACHSTROMLEITUNG I-Y(ST) Y 2x2x0,8
3.1
3.1
El. Zuleitung zur Maschine
Anschlussdimensionierung freies Kabelende ab OKFF max. Anschlussquerschnitt
ca. 4,0 m
/Nominalstrom / - Leistung
Potentialausgleichsleitung
3N PE 400V 50Hz
61 kW
35 mm†
88,5 A
88,5 A
3.1 electrical supply to the machine power cord designed for free cable end from FFL max. cable cross section approx. 4,0 m standard electrical current / power
Voltage equalising cable
3N PE 400V 50Hz
61 kW
88,5 A
88,5 A
35 mm†
E3
E
3.1
ZUM ZLT-STEUERSCHRANK, DACHBODEN
ZLT - SCHWACHSTROMLEITUNG I-Y(ST) Y 2x2x0,8
3.1
E
3.1
E
NYY 4x50qmm LEITUNG NEU
FUER 2 STUECK NYY-4x50qmm LEITUNGEN
IP 66 NEUER KLEMMKASTEN
NYY 4x50qmm LEITUNG NEU
NYY-I 1x25qmm ERDUNGSLEITUNG NEU
NYY-I 1x25qmm ERDUNGSLEITUNG NEU
NYY-I 5x35qmm
BETONBODENSCHLITZ / NIRO-KABELKANAL
NYM-I 5x4qmm
IN NIRO-KABELKANAL
GESCHIRRSPUELER
FOERDERBAND
GESCHIRRSPUELER
FOERDERBAND
AUF PUTZ
ERDUNGSBAND VORHANDEN,
ELEKTROANSCHLUESSE WASCHSTRASSE ERDUNGS- UND POTENTIALANSCHLUESSE WASCHSTRASSE VORHANDENE SPS BE- UND ENTLUEFTUNGSTEUERUNG
E3
ZLT
ZLT - SCHWACHSTROMLEITUNG I-Y(ST) Y 2x2x0,8
GESCHIRRSPUELER (MEIKO)
NEUES KOPPELRELAIS
E
3.1
COUPLING RELAY - EMCS DISH WASHER (NEW)
ELECTRICAL CONNECTION (DISH WASHER)
TERMINAL BOX IP66 FOR 2 EACH NYY-450 SQMM LINES
KLEMMKASTEN IP66 FUER 2 STUECK NYY-450qmm LEITUNGEN
ENERGY CONTROL TECHNOLOGY CONTROL BOARD (EXISTING, IN THE ATTIC)
ZENTRALE LEITTECHNIK STEUERSCHRANK (IM DACHBODEN VORHANDEN)
GROUNDING STRAP (EXISTING, SURFACE-MOUNTED ON WALL)
GROUNDING CONNECTION POINT (NEW), DISH WASHER AND CONVEYOR
GROUNDING CONNECTION POINT GROUNDING STRAP FOR NYM / NYY LINES
JS(ST)Y EMCS WEAK CURRENT LINE
NYY AND NYM LINES
File details come from the government source that posted it. Updated .