Attachment_II_-_Drawings.pdf

PDF 1 MB Posted

Attached to
Replace Transformer Station 204, Bldg 1027 Federal contract opportunity
Solicitation number
W912PB-16-B-8102
Issued by
Department of the Army Materiel Command Expeditionary Contracting Command Regional Contracting Office Bavaria 409th CSB

About this file

Attachment II - Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Replace Transformer Station 204, Bldg 1027, newest first.
File Type Posted
W912PB-16-B-8102.pdf PDF
Cover_Letter_IFB.pdf PDF
Attachment_I_-_Specification.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE S PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla 1

Layout

N

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE S PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

Layout

N

Station new Transform er-

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald

CALE

1 : 50

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, CALE

1 : 50

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, Layoout New Transformer Station 204 Bldg. 1027

9.80

.0

3.60

.6

.4

10.20

8.20

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE S PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

Layout

N

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE S PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

Layout

N

Station new Transform er-

CALE

1 : 50

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, CALE

1 : 50

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, Layoout New Transformer Station 204 Bldg. 1027

9.80

.0

3.60

.6

.4

10.20

8.20 paving / Traufpflaster turf brick stones / Rasengittersteine

Rasenkantensteine grass curb stones

Rasenkantensteine grass curb stones

Rasenkantensteine grass curb stones

John Alan Howard, C/Engr Div

09.03.2016 42A-01076-5P

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE S PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla 1

Layout

N

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE S PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

Layout

N

Station new Transform er-

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald

CALE

1 : 50

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, CALE

1 : 50

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, Layoout New Transformer Station 204 Bldg. 1027

9.80

.0

3.60

.6

.4

10.20

8.20

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE S PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

Layout

N

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE S PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

Layout

N

Station new Transform er-

CALE

1 : 50

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, CALE

1 : 50

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, Layoout New Transformer Station 204 Bldg. 1027

9.80

.0

3.60

.6

.4

10.20

8.20 paving / Traufpflaster turf brick stones / Rasengittersteine

Rasenkantensteine grass curb stones

Rasenkantensteine grass curb stones

Rasenkantensteine grass curb stones

John Alan Howard, C/Engr Div

09.03.2016 42A-01076-5P o3O

.0

0 1 .2

.7

.0

.8

.6

Res

T r a f o

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald 2

Ground Plan Sections and Elevations

1 : 25

6.60

1.60

A

A

09.03.2016

VIEWS / ANSICHTEN

GROUND PLAN / GRUNDRISS SECTIONAL VIEW / SCHNITT A - A

o3O

NS

.0

0 1 .2

.7

.0

.8

.6

Komp

Trafo

T r a f o

MS1MS2MS3MS4

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald 2

Ground Plan Sections and Elevations

1 : 25

6.60

1.60

A

A

RV

John Alan Howard, C/Engr Div

VIEWS / ANSICHTEN

GROUND PLAN / GRUNDRISS SECTIONAL VIEW / SCHNITT A - A

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, New Transformer Station 204 Bldg. 1027

Station

Station

1.601.601.601.60

T r a f o

R e s e r v e z e lle

9.80

0.12

.2

.1

RTRT

C E

E

KV

Niederspannungs-Kabelverteiler low voltage electrical distribution box

42A-01076-5P o3O

.0

0 1 .2

.7

.0

.8

.6

Res

T r a f o

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald 2

Ground Plan Sections and Elevations

1 : 25

6.60

1.60

A

A

09.03.2016

VIEWS / ANSICHTEN

GROUND PLAN / GRUNDRISS SECTIONAL VIEW / SCHNITT A - A

o3O

NS

.0

0 1 .2

.7

.0

.8

.6

Komp

Trafo

T r a f o

MS1MS2MS3MS4

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

Ludwig Gruenwald 2

Ground Plan Sections and Elevations

1 : 25

6.60

1.60

A

A

RV

John Alan Howard, C/Engr Div

VIEWS / ANSICHTEN

GROUND PLAN / GRUNDRISS SECTIONAL VIEW / SCHNITT A - A

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, New Transformer Station 204 Bldg. 1027

Station

Station

1.601.601.601.60

T r a f o

R e s e r v e z e lle

9.80

0.12

.2

.1

RTRT

C E

E

KV

Niederspannungs-Kabelverteiler low voltage electrical distribution box

42A-01076-5P

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

09.03.2016

Ludwig Gruenwald 3

Electrical Scheme

I>>

L

K

N

X S

Y x x

N

X S x

NYY-O 8x1x240 qmm

A A A A A A A A A A A A A A A A A A

1 1 1 1 1 1 1 1 1 1 1 1 1

400A 400A 400A 400A 400A 400A 400A 400A 160A 160A 160A 160A 160A 160A

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3

20/50kA

24kV

24kV

630A/16kA

24kV

20/50kA

24kV

630A/16kA

24kV

20/50kA

Trafo 1

3 3 3

Einspeisefeld 1

Abgangsfeld 2Abgangsfeld 1

20 kV

400V

MS 1MS 2MS 3MS 4

20/50kA

24kV

Kabelschaltfeld Kabelschaltfeld

Niederspannungs-Klemmbock

Anschlussvorrichtung Erdungsgarnitur

Legend:

M

630A/20kA

630A/16kA

3 20/50kA

1000A

A

0.4kV

630kVA

20kV

160A

P2

P1

24 kV Grounding Switch

24kV/400V Transformer

24 kV medium voltage circuit breaker with motor

24 kV Transformer Switch

400V Transformer Switch

400V Fuse Load Disconnector Switch

Overvoltage Protector

Distance-Protection Relay / Earth-Leakage Relay

Amperemeter

Current Transformer

EMM Energy-Multi-Meter

Phasenueberwachungsrelais

Kabelschaltfeld

R e s e r v e

R s e r v e

24kV

A A

1 1

400A

3 3

400A

New Transformer Station

400/230V, 3 Phasen/PEN, 50 Hz, 2000A

160A

3 3

R e s e r v e

R e s e r

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

160A 160A 160A 160A 160A 160A

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3

3 3 3

Einspeisefeld 1

Abgangsfeld 2Abgangsfeld 1

20 kV

400V

Niederspannungs-Klemmbock

Anschlussvorrichtung Erdungsgarnitur

Legend:

3 20/50kA

24 kV Grounding Switch

24kV/400V Transformer

24 kV medium voltage circuit breaker with motor

24 kV Transformer Switch

400V Transformer Switch

400V Fuse Load Disconnector Switch

Overvoltage Protector

Distance-Protection Relay / Earth-Leakage Relay

Amperemeter

R e s e r v e

N Y

Y J x

400A

3 3

R e s e r v e

R e s e r v e

KV

R e s e r v e

N Y

Y J x

1250A

3 3

NH00

63A

40/0.03A

16AC 16AC 10AC16AC 16AC

S t e c k d o s e r e c e p t a c le h e a t in g

H iz u n g

R e s e r v e

R e s e r v e

10AC

V

16AC

R e s e r v e

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, Layoout New Transformer Station 204 Bldg. 1027

25 kvar

Niederspannungs-Kabelverteiler low voltage electrical distribution box

630A 630A

N Y

Y J x

N Y

Y J x

R in lg ie r

N Y

Y J x

R a c h n o

N Y

Y J x

N Y

Y J x

R c h

W s t

R c h s t

R c h

O s t

N Y

Y J x

A lg ie r t

F e il e it u n g

N Y

Y J x

P

N Y

Y J x

N Y

Y J x

400A 400A

R e s e r v e

R e s e r v e

R e s e r v e

N Y

Y J x

N Y

Y J x

N Y

Y J x

G e b

V e r t e il f o r g e r

S p o r t p la t z

S t r a s s e n b l.

T u r m s t a t io

160A

R e s e r v e

630kVA

S t a t

S t a t

N

X S x

Trafo-Festkompensation

KBR

Dehnbloc maxi/S

Dehnsignal E3

D01D01D01

16/10A16/10A16/6A

S t e u e r u n g

B e le u c h t u n g

D e h n s ig n a l

E

D01

16/6A 3

RTRTCEE

L E

D h a n d la m p

D n d le u c h t e

C

S e c k d o s e

N Y

M J x .5

N Y

M J x .5

N Y

M J x .5

N Y

M J x .5

LWL L1

LWL L2

LWL L3

630 kVA

N Y

M J x .5

16AB

FI/LS

0.3A

RV DDC

John Alan Howard, C/Engr Div

42A-01076-5P

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

09.03.2016

N

X S x

N

X S x

400A 400A 400A 400A 400A 400A 400A 400A 160A 160A 160A 160A 160A 160A

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3

20/50kA

24kV

24kV

630A/16kA

24kV

20/50kA

24kV

630A/16kA

24kV

20/50kA

Trafo 1

3 3 3

Einspeisefeld 1

Abgangsfeld 2Abgangsfeld 1

20 kV

400V

MS 1MS 2MS 3MS 4

20/50kA

Kabelschaltfeld Kabelschaltfeld

Niederspannungs-Klemmbock

Anschlussvorrichtung Erdungsgarnitur

Legend:

3 20/50kA

24 kV Grounding Switch

24kV/400V Transformer

24 kV medium voltage circuit breaker with motor

24 kV Transformer Switch

400V Transformer Switch

400V Fuse Load Disconnector Switch

Overvoltage Protector

Distance-Protection Relay / Earth-Leakage Relay

Amperemeter

Kabelschaltfeld

R e s e r s e r v e

24kV

400A

3 3

400A

New Transformer Station

160A

3 3

R e s e r v e

R e s e r

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

160A 160A 160A 160A 160A 160A

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3

3 3 3

Einspeisefeld 1

Abgangsfeld 2Abgangsfeld 1

20 kV

400V

Niederspannungs-Klemmbock

Anschlussvorrichtung Erdungsgarnitur

Legend:

3 20/50kA

24 kV Grounding Switch

24kV/400V Transformer

24 kV medium voltage circuit breaker with motor

24 kV Transformer Switch

400V Transformer Switch

400V Fuse Load Disconnector Switch

Overvoltage Protector

Distance-Protection Relay / Earth-Leakage Relay

Amperemeter

R e s e r v e

N Y

Y J x

400A

3 3

R e s e r v e

R e s e r v e

KV

R e s e r v e

N Y

Y J x

1250A

3 3

NH00

63A

40/0.03A

16AC 16AC 10AC16AC 16AC

S t e c k d o s e r e c e p t a c le h e a t in iz u n g

R e s e r v e

R e s e r v e

10AC

V

16AC

R e s e r v e

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, Layoout New Transformer Station 204 Bldg. 1027

25 kvar

Niederspannungs-Kabelverteiler low voltage electrical distribution box

630A 630A

N Y

Y J x

N Y

Y J x

R lg ie r

N Y

Y J x

R c h o

N Y

Y J x

N Y

Y J x

R c h s t

R c h s t

R c h

O t

N Y

Y J x

A lg ie

F e il e it u n g

N Y

Y J x

N Y

Y J x

N Y

Y J x

400A 400A

R e s e r v e

R e s e r v e

R e s e r v e

N Y

Y J x

N Y

Y J x

N Y

Y J x

G e b

V e r t e il f o r g e r

S p o r t p la t z

S t r a s s e n b l.

T u r m s t a t

160A

R e s e r v e

630kVA

S t a t

S t a t

N

X S x

Trafo-Festkompensation

KBR

Dehnbloc maxi/S

Dehnsignal E3

D01D01D01

16/10A16/10A16/6A

S t e u e r u n g

B e le u c h t u n g

D e h n s ig n a l

D01

16/6A 3

RTRTCEE

L E

D h a n d la m p

D n d le u c h t e

C

S e c k d o s e

N Y

M J x .5

N Y

M J x .5

N Y

M J x .5

N Y

M J x .5

LWL L1

LWL L2

LWL L3

630 kVA

N Y

M J x .5

16AB

FI/LS

0.3A

RV DDC

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

09.03.2016

Ludwig Gruenwald 4

Transformatorschutz

Erdungsschalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

MS Res

IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8

NSHV

RV GLT

Druck/Termp. Sch.

Druck/Termp. Sch.Druck/Termp. Sch.

NSP SchalterUeberspannungs-

Schutz

1. abisolieren, reinigen, einfuehren, beschriften aufloeten auf Loetstreifenverteiler Loet/Steck (250pol)

2. Anklemmen der DP in den einzelnen Verteilungen

Schaltfelder bzw. Feldgeraeten

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

MS Res

Traforaum 1

IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8

IY(St)Y 10x2x0.8

NSHV

RV GLT

Druck/Termp. Sch.

Druck/Termp. Sch.Druck/Termp. Sch.

NSP SchalterUeberspannungs-

Schutz

1. abisolieren, reinigen, einfuehren, beschriften

2. Anklemmen der DP in den einzelnen Verteilungen

Schaltfelder bzw. Feldgeraeten

NYM-I-10x1.5

DGPT2

2x NYM-I-10x1.5 qmm

EMCS Scheme

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, Layoout New Transformer Station 204 Bldg. 1027

Trafo 1Station 203

Trafo 1 ausgeloest

Trafo 1 Warnung

Trafo 1

25 kvAr

IY(St)Y 4x2x0.8

Station 205

Trafo-Festkompensation

12x IY(St) 4 x 2 x 0.8

2x IY(St) 10 x 2 x 0.8 aufloeten auf Loetstreifenverteiler Loet/Steck (250pol)

A2YFL2Y 20 x 2 x 0,8A2YFL2Y 20 x 2 x 0,8

A2YFL2Y 20 x 2 x 0,8 A2YFL2Y 20 x 2 x 0,8

Bldg. # 2127

Bldg. # 1003

Bldg. # 2000

Bldg. # 2281

BuskabelBuskabel

MuffeMuffe

Muffe Muffe

4x A2YFL2Y 20 x 2 x 0.8

John Alan Howard, C/Engr Div

42A-01076-5P

DATE DESCRIPTION DRAWN BY APPROVED

PROJECT TITLE

USING UNITDATE

DATE

DATE

DATE

PROJECT ENGR CHECKED BY

DATE SCALE PROJECT NO

SHEET

OF

REV NO

NAME (PRINT) NAME (PRINT)

NAME (PRINT)NAME (PRINT)

SIGNATURE SIGNATURE

SIGNATURESIGNATURE

MASTER PLANNER

DRAWN BY

ENGR DIV

DESIGN / PROJ MGMT BR

USA GARRISON, BAVARIA

INSTALLATION

TOWER BARRACKS

P. SossallaP. Sossalla

Ludwig Gruenwald, C/Design & Proj Mgmt Br James M. Beatty, C/Master Planning

09.03.2016

Ludwig Gruenwald 4

Transformatorschutz

Erdungsschalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

MS Res

IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8

NSHV

RV GLT

Druck/Termp. Sch.

Druck/Termp. Sch.Druck/Termp. Sch.

NSP SchalterUeberspannungs-

Schutz

1. abisolieren, reinigen, einfuehren, beschriften aufloeten auf Loetstreifenverteiler Loet/Steck (250pol)

2. Anklemmen der DP in den einzelnen Verteilungen

Schaltfelder bzw. Feldgeraeten

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

Erdungsschalter

MSP - Schalter

MS Res

Traforaum 1

IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8 IY(St)Y 4x2x0.8

IY(St)Y 10x2x0.8

NSHV

RV GLT

Druck/Termp. Sch.

Druck/Termp. Sch.Druck/Termp. Sch.

NSP SchalterUeberspannungs-

Schutz

1. abisolieren, reinigen, einfuehren, beschriften

2. Anklemmen der DP in den einzelnen Verteilungen

Schaltfelder bzw. Feldgeraeten

NYM-I-10x1.5

DGPT2

2x NYM-I-10x1.5 qmm

EMCS Scheme

USAG Bavaria, Grafenwoehr Military Community-Tower Barracks

Replace Transformer Station 204 Building # 1027 at Camp Aachen, Layoout New Transformer Station 204 Bldg. 1027

Trafo 1Station 203

Trafo 1 ausgeloest

Trafo 1 Warnung

Trafo 1

25 kvAr

IY(St)Y 4x2x0.8

Station 205

Trafo-Festkompensation

12x IY(St) 4 x 2 x 0.8

2x IY(St) 10 x 2 x 0.8 aufloeten auf Loetstreifenverteiler Loet/Steck (250pol)

A2YFL2Y 20 x 2 x 0,8A2YFL2Y 20 x 2 x 0,8

A2YFL2Y 20 x 2 x 0,8 A2YFL2Y 20 x 2 x 0,8

Bldg. # 2127

Bldg. # 1003

Bldg. # 2000

Bldg. # 2281

BuskabelBuskabel

MuffeMuffe

Muffe Muffe

4x A2YFL2Y 20 x 2 x 0.8

Trafostation Bldg. 1027 Camp Aachen Grafenwoehr-Default-001
Trafostation Bldg. 1027 Camp Aachen Grafenwoehr-Default-002
Trafostation Bldg. 1027 Camp Aachen Grafenwoehr-Default-003
Trafostation Bldg. 1027 Camp Aachen Grafenwoehr-Default-004

File details come from the government source that posted it. Updated .