A02_-_Scope_of_Work.pdf
PDF 3 MB Posted
- Attached to
- Water Line Life Cycle Replacement Federal contract opportunity
- Solicitation number
- W912P919T0061
About this file
Scope of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Scheduled_Site_Visit.pdf | ||
| A02_-_Attachment_1.pdf | ||
| Solicitation.pdf | ||
| A02_-_Attachment_2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rivers Project Office – Service Base Water Line Life Cycle Replacement March 2019
Scope of Work
1.0 DESCRIPTION OF WORK
The work consists of furnishing all labor, materials, fittings, equipment, tools, power, heat, water, etc., and performing all work to replace an existing fleet potable water system. The demo and proper disposal of the replaced systems is the contractor’s responsibility. Replaced systems will not be abandoned in place. Included below is all work to be completed.
Deliveries and work must be coordinated with the Contracting Officer or other designated Government Authority, such as the Contracting Officer Representative (COR) one week in advance. Contractor representative must be on sight during all deliveries. Contractor is to coordinate with COR on material storage locations. All materials and equipment furnished shall be new, unused, and free from defects or imperfections that might affect the serviceability of the finished product.
Work and components must meet all government and Metropolitan St. Louis Sewer District standards.
Contractor is to use off the shelf components when able. Potable water system will be resistant to Mississippi river conditions. All items provided must meet the requirements of the Buy American clauses referenced. The contractor is responsible for field verifying all measurements.
1.1 Water Line
Demolish and properly dispose of existing potable water system that is to be replaced. Furnish new potable water system meeting the following requirements. Potable water lines will be stainless steel and flexible lines designed for potable water use. Potable water system will not interfere with the removal of the trestle hand rails. Potable water system will not interfere with the trestle to string out access ramp. Contractor will be responsible for integrating replacement fleet potable water system with existing galvanized system at the 3” to 2” reducer located south of the trestle. Contractor will install a locking ball valve on the vessel string out to separate new stainless steel system from existing galvanized system. Contractor is to match existing vessel connections types and locations (Attachment 1). Contractor will be replacing approximately 950 ft. of pipe. Potable water system must be easily drainable utilizing gravity. Potable water system will be resistant to impacts from debris floating on the Mississippi River.
1.2 Heat Trace
The potable water lines including but not limited to connection points, pipes, couplings, and fittings will be heat traced and insulated. System will be designed to prevent pipes from freezing if exposed to Mississippi river conditions at -20 degrees Fahrenheit. Contractor will be responsible for powering the heat trace, 110V AC and 480V AC power is located on the string out.
1.3 Insulation
The insulation will be closed cell foam, when exposed to the elements it will not absorb water.
Insulation will have a minimum service temperature range of -40oF to 250oF. Insulation Tensile Strength will exceed 4,000 PSI with a minimum Shore D Hardness of 57. Insulations average thermal resistance
(R) shale be 12.53 (hr*ft2*oF)/Btu or greater. An example of such insulation would be dragon jacket.
1.4 Close Out
The contractor shall submit to the government a “close out packet” that contains contractor workmanship warranty, final design specs, material lists, material manufacture warranties, and suggested operation and maintenance.
2.1 EPA Designated (CPG): Under the Comprehensive Procurement Guidelines (CPG) program, the
Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials, and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit http://www.epa.gov/epawaste/conserve/tools/cpg/products for a complete list of designated products and the associated recommended content levels. Offerors must be able to demonstrate that each offered product meets minimum content levels upon request.
Option1
Vault Demolish and properly dispose of existing vault system. Furnish and install new vault system meeting the following requirements. Vault will contain new functional displacement-type odometer style water meter, back flow preventer, and redundant shut of valves with a minimum pipe 3” diameter. The vault will be large enough for a worker to preform inspections and replacements in comfortably with a minimum 2 ft. working space. Vault must contain a system to prevent it from retaining water under normal conditions. Existing vault is located on a levee. All excavations must be at least 15’ away from the river wall. All excavated areas excluding the inside of the vault and pipes must be backfilled using flowable fill per I Dot specifications. Shoring will be provided by through the use of H-Pile or sheet piling on the east side of the vault nearest the river.
Water meter accuracy shall be such that at a water temperature less than 80ºF (27ºC):
1. Normal flow limits. At any rate of flow within the normal test-flow limits of meter design, the meter shall register not less than 98.5 percent and not more than 101.5 percent of the water that actually passes through it.
2. Minimum flow rate. At the minimum test-flow rate to the lowest normal test-flow rate of meter design, the meter shall register not less than 95 percent and not more than 101 percent of the water that actually passes through it.
Inspection All materials and workmanship shall be subject to inspection at all times by an inspector or inspectors appointed by the contracting Officer to ensure strict compliance with the terms of the contract in accordance with Contract The presence or absence of the inspector shall not relieve the Contractor or his responsible agent of the responsibility for the proper execution of the contract. The Contractor shall at all times permit the Government inspector(s) free access to the shops where work is being carried on under the contract, and shall provide the necessary facilities and assistance for making thorough examinations. Government inspectors shall have power to reject any workmanship and material which do not conform to the specifications. Inspections shall be made within 10 calendar days after system complete installation.
Acceptance When final inspection of potable water system has been satisfactorily completed it will be formally approved by the Contracting Officer or his /her representative for their behalf of the Government.
Conditions of Operations The Potable water system supplies drinking water to our vessels throughout the year at different locations along the string out. Vessels connect to the potable water line by removable hoses. Sections of the potable water line may be submerged in the Mississippi river at different times throughout the year. Water usage by the Vessels is monitored by Metropolitan St. Louis Sewer District and the service base
Contract Drawings
Drawing 1 Drawing 2 Attachment 1 Attachment 2
EPA Designated (CPG) Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials, and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit http://www.epa.gov/epawaste/conserve/tools/cpg/products for a complete list of designated products and the associated recommended content levels. Offerors must be able to demonstrate that each offered product meets minimum content levels upon request.
Place of Work The item(s) supplied under this contract shall be delivered F.O.B. Destination to:
Department of the Army St. Louis District, Corps of Engineers Service Base 100 Arsenal Street St. Louis, Missouri 63118-3394
F.O.B. Destination The term “F.O.B. Destination” as used in the clauses, means…..
Free of expense to the Government, on board the carrier’s conveyance, at a specified delivery point where the consignee’s facility is located
Supplies shall be delivered to the destination consignee’s wharf, warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage demurrage, accessorial, or other charges involved before the actual delivery of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity.
The Contractor Shall…..
Prepare and distribute the commercial bill of lading Be responsible for any loss of and/or damage to the goods occurring before the shipment by the consignee at the delivery point specified in the contract Furnish a delivery schedule and designate the mode of delivering carrier Pay and bear all charges to the specified point of delivery
AT/OPSEC
Access and General Protection/Security Policy and Procedures:
"All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training
Access Control List: The Contractor will provide the Contracting Officer an Access Control List (ACL) which lists all employees to be on site during the duration of contract. Employees not listed on the approved ACL but are on site will be required to leave. As employees are added or deleted from the submitted and approved ACL, this information must be reported immediately to the Contracting Officer.
Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved. In the event that an unexpected change in personnel is required, due to sudden absence of a critical employee or unforeseen change in work site condition, the Contractor shall immediately contact the Contracting Officer to obtain written approval for new/additional personnel to be brought on site prior to background check acceptance.”
Proposal The contractor shall provide proposals with the following cost breakdown:
Water line Heat trace Insulation Close Out
Option 1 Vault
Point of Contact
Neal Windhorst –314-331-8380 Star Loftus – 314-331-8145 Steven Branstetter – 314 865-6335
Drawing 1: Section to be replaced (from attachment 2 Existing V3 Page 1)
Drawing 2: Proposed Run Concept
Attachement1: Trestle and String Out Original Design PDF
Attachment 2: Water line Vault Proposal dwg 1.03 PDF
C
B
A
4 3 2
RAILROAD
1RES1LE
B
DCB 724
DECK CARGO BARGE, TYP
MISSISSIPPI RIVER
CIN FLOATS, TYP
LOCATION PLAN
SCALE; 1"= 100'
GENERAL CONSTRUCTION NOTES
1. ALL WORK SHOWN ON THE MECHANICAL PIPING DRAWINGS !S BASE BID.
2. ALL PIPING SHALL FOLLOW THE GENERAL ARRANGEMENT SHOWN. PIPING SHALL BE
RUN ESSENTIALLY AS INDICATED, CARE BEING TAKEN TO AVOID INTERFERENCE WITH
OTHER PIPING, CONDUIT, OR EQUIPMENT. THE LOCATION OF PIPING TO BE RUN ON
DOCKS SHALL BE CAREFULLY COORDINATED WITH DOCK STRUCTURE AND ELECTRICAL
CONDUITS SPECIFIED. BEFORE JOINTING AND ERECTION OF PIPING, THOROUGHLY
CLEAN INTERIORS OF PIPE AND COMPONENTS. MAINTAIN CLEANLINESS BY CLOSURE
OF PIPE OPENINGS WITH CAPS OR PLUGS.
3. THE CONTRACTOR SHALL MAINTAIN THAT SUFFIC!ENT PIPE FLEXIBILITY AND ANCHORAGE
IS PROVIDED FOR ALL LINES FOR THERMAL EXPANSION AND CONTRACTION, PRESSURE
AND DOCK FLEXING, THE PIPING SHALL BE PROPERLY SUPPORTED AND ANCHORED.
SHORT SECTIONS OF HOSE MAY BE CONSIDERED FOR PW AND SEWER SERVICE, UPON
APPROVAL.
4. CONTRACTOR SHALL INSPECT MATERIALS DELIVERED TO SITE FOR DAMAGE. UNLOAD
AND STORE WITH MINIMUM HANDLING. STORE MATERIALS ON SITE IN ENCLOSURES OR
UNDER PROTECTIVE COVERING. DO NOT STORE MATERIALS DIRECTLY ON THE GROUND.
KEEP JNSIDE OF PIPES, FITTINGS AND EQUIPMENT FREE OF DIRT AND DEBRIS.
HANDLE PIPE, FITTINGS, VALVES, AND OTHER ACCESSORIES IN SUCH MANNER AS TO
ENSURE DELIVERY TO THE DOCKS AND INSTALLATION LOCATION IN A SOUND
UNDAMAGED CONDITION.
5. ALL MATERIALS (PIPE, VALVES, ETC.) SHALL BE FURNISHED BY THE CONTRACTOR. ALL
SUCH MATERIALS SHALL BE NEW, SHALL MEET CllY, COUNlY, AND WATER UTllllY
COMPANY AND OTHER AHJ SPECIFICATION REQUIREMENTS FOR EACH ITEM, AND PR!OR
TO INSTALLATION, BE APPROVED IN WRITING BY THE ARMY CORPS OF ENGINEERS.
6. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE UNIFORM PLUMBING
CODE, LATEST EDITIONS, AS APPLICABLE.
7, THE CONTRACTOR SHALL VERIFY ALL EXISTJNG UTILllY LOCATIONS IN THE FIELD
BEFORE STARTING WORK. THE CONTRACTOR SHALL FIELD VERIFY THE POINT OF
CONNECTIONS AND MATERIALS AT POINT OF CONNECTION. LOCATIONS OF PIPING AND
APPURTENANT FITTINGS SHOWN ON THE PLANS (DRAWINGS) ARE APPROXIMATE. lT JS
INTENDED THAT SUCH ITEMS BE LOCATED BASED ON EXACT LOCATIONS DETERMINED
IN THE FIELD AND THE DIMENSIONS, ANCHORING REQUIREMENTS, ACCESS
REQUIREMENTS, ETC., OF THE SUPPLIED MATERIALS.
P:\6873 St Louis Mooring Replacemeot\CADD\SU8MITTAL\276B•M1,dwg 13 Jul 2010 -2:26pm
8. THE CONTRACTOR SHALL PROVIDE PROTECTIVE MfASURES TO SAFEGUARD EXISTING
UTILITIES TO REMAIN FROM DAMAGE DURING CONSTRUCTION OF THIS PROJECT.
9. CONSTRUCTION EQUIPMENT AND MATERIAL MAY BE STORED ONLY IN AREAS
DESIGNATED FOR CONTRACTOR'S USE.
10. THE CORPS SERVICE BASE OFFICER JN CHARGE WILL HAVE THE AUTHORllY TO
DESIGNATE AND/OR LIMIT AREAS OF CONSTRUCTION. DRAWINGS INDICATE EXISTING
PIPING TO BE REMOVED, BUT CONFIGURATION OF PIPING TO BE REMOVED VARIES ON
EACH FLOAT. CONTRACTOR SHALL VERIFY WITH BASE OFFICER IN CHARGE SPECIFIC
PIPING WHICH IS TO BE REMOVED.
11. SUPPORTS AND HARDWARE SHALL BE FROM MANUFACTURED SHAPES, FIELD BENDING
!S NOT PERMITTED. SUBMIT SHOP DRAWINGS OR CATALOG DATA FOR REVIEW AND
APPROVAL.
12. DIELECTRIC COUPLINGS SHALL BE USED AT DISSIMILAR METAL PIPING CONNECTIONS.
13. CONTRACTOR SHALL PROVIDE TEMPORARY BLOW OFF VALVES AT THE END OF EACH
WATER LINE, TO BE REMOVED WHEN INSTALLATION IS COMPLETE.
DELONG BARGE
LEGEND AND ABBREVIATIONS
Sl'.Ml.lQl.S hllBBEI' DESCRIPTION
AHJ AUTHORITY HAVING JURISDICTION
BFP BACKFLOW PREVENTION DEVICE
BV BALL VALVE
CONN CONNECTION
CONT CONTINUATION
DIA DIAMETER
DWG DRAWING
ELL ELBOW
EXIST. EXISTING
FT FEET
GALV GALVANIZED
GV GATE VALVE
_f_ HB HOSE BIBB LOPE LOW DENSllY POLYETHYLENE
MAX MAXIMUM
MIN MINIMUM
MFR MANUFACTURER
NPT NATIONAL PJPE THREAD
NTS NOT TO SCALE
� POC POINT OF CONNECTION
-PW- PW POTABLE WATER
RED REDUCER
ss STAINLESS STEEL
STD STANDARD
STL STEEL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
W/ l',qTH
100' o· 100' 200·
SCALE: 1"=100'
m USArmyCorp• of Engineers Marina Deslgo canter 100 Penn Sqo�re Ea.I PMlad�lphla, PA 19,07
Zl!6lic.oJ.JFOON"'il.VO,:a..tE.OO Wi.JurCRW<."""""'° j l ii� � 5 ii g
� 0
1;; .... !;: !;l � m � I ; 0 � I I . '
3 l,I I;� " ' 0 o 0 f
§ ffi '� w � tU � i � Q � �
Ii 1o l :rn l � fii
• C I ! ffi � • I w z UJ Q CJ) t,z
� :::,Q a: I-t;!f
� zil'.i Oa:
""' ...,m
0 << 0 a: 0 :,; Wz
Z<(
UJ UJ"
i "zz�� UJ ::Sw Id C...., 5c 5 fff
�b� uz
Sheet reference number
M1 b3odnnrw Line b3odnnrw Line b3odnnrw Line b3odnnrw Line b3odnnrw Line b3odnnrw Text Box Existing V3 Page 1 b3odnnrw Line b3odnnrw Line b3odnnrw Text Box Pipes to be replaced b3odnnrw Line b3odnnrw Oval
Text Box Existing V3 Page 2
Existing V3 Page 3 b3odnnrw Line b3odnnrw
3” to 2” reducer located south of the trestle
Existing V3 Page 4
Existing V3 Page 5
Existing V3 Page 6
Existing V3 Page 7
Historical V2
Historical V2 Page 2
Historical V1 Page 1
| A02 - Scope of Work |
| 1 |
| [Untitled] |
| Warf Drawing Capture |
| [Untitled] |
File details come from the government source that posted it.