Q9-69-381-Plot.pdf
PDF 11 MB Posted
- Attached to
- Kuttawa Sewer Line Replacement Federal contract opportunity
- Solicitation number
- W912P520Q0038
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q9-69-382-Plot.pdf | ||
| Q9-69-389-Plot.pdf | ||
| Q9-69-385-PLOT.pdf | ||
| W912P520Q0038 Solicitation Amendment 0001_Final.pdf | ||
| W912P5-20-Q-0038 (Kuttawa) TSpecs R1.pdf | ||
| W912P5-20-Q-0038 (Kuttawa) TPlans.pdf | ||
| W912P520Q0038 Solicitation.pdf.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE DRAWINGS IS APPROXIMATE.1 FOOT AND AT THE DEPTH REQUIRED BY THE DRAWINGS. LOCATION OF THE NEW MANHOLES SHOWN ON
THE NEW MANHOLES SHALL BE INSTALLED AT THE SAME LOCATIONS AS THE EXISTING MANHOLES (+/-)
®of Engineers
US Army Corps of Engineers
US Army Corps
IS
S
U E D
A T
E
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
1 2 3 4 5
D
C
A
B
J U
N E /2
RTA
LA
K E B
A R
K
LE
Y D
R
IV
E
LEGEND
N
REHAB
RESTROOM
SEWER LINE REPLACEMENT
E X
IS
T
IN
G C
IT
Y S
E W
E R L
IN
E
CITY MANHOLE
CITY SEWER LINE
3. MINIMIZE DISTURBANCE OF ANY EXISTING TREES.
NEEDED DURING THE CONSTRUCTION PERIOD.
REQUIRED WHERE IT IS EVIDENT THAT EROSION OR SEDIMENT CONTROL IS
2. AT A MINIMUM, EROSION CONTROL BEST MANAGEMENT PRACTICES (BMPS) ARE
CONSTRUCTION PERIOD.
COMMENCING EARTHWORK AND SHALL BE MAINTAINED THROUGHOUT THE
1. ALL NECESSARY EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO
ENVIRONMENTAL NOTES:
MANHOLE REPLACEMENT
STEEL ENCASEMENT SLEEVE
LINES
OVERHEAD POWER
WOOD FENCE
METAL GATE W/
OPTION
WITH WATERPROOF COVER
MANHOLE REPLACEMENT
WITH WATERPROOF COVER
MANHOLE REPLACEMENT
RIP RAP
LAYDOWN AREA
TOP OF DITCH
PROFILE GRADE
DRAINAGE DITCH
IN THE BOTTOM RIGHT.
SEE THE RIP RAP DETAIL
WITH FILTER FABRIC.
CLASS II RIP RAP
IN THE BOTTOM RIGHT.
SEE THE RIP RAP DETAIL
WITH FILTER FABRIC.
CLASS II RIP RAP
REPLACEMENT
4" SEWER LINE
RESTROOM FACILITY
REPAIRED. SEE NOTE 14.
SLEEVE AND ASPHALT TO BE
DUCTILE IRON ENCASEMENT
UNDERGROUND ELECTRICAL LINE
P lo t T im e
P lo t
D a te
F il e N a m e
:0
:0
P
M
/5 /2 c d o c u m e n ts a n d s e tt in g s \h e c x fc m \p w w o rk \c e lr n \d m s \Q
-6
9̂ .d g n
X
NASHVILLE DISTRICT
N A
S H
V
IL
L E D
IS
T R
IC
T
Q9-69/381
A N
S I
D
F C
M
R A
G
R A
G
R O
B E
R T W
B A
U L S
IR
II
I P .E
W P -2
-X -X
X X
X
W P
Q
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
X
S E
W E
R L
IN
E R
E P
L A
C E
M E
N T
C U
M B
E R
L A
N D R
IV
E R W
A T
E R
S H
E D
B A
R K
L E
Y D
A M P
R O J E
C T
P U
B L
IC
U
S E A
R E
A S S
IT
E N
O
K U
T T
A W
A
K E
N T
U C
K Y
X
X
P L
A N
Q -6
9̂ .d g n
N A
S H
V
IL
L E T
E N
N E
S S
E E
HDPE - DR11
REPLACEMENT
8" SEWER LINE
REPAIRED. SEE NOTE 14.
AND ASPHALT TO BE
SLEEVE (AWWA C151, CL 350)
DUCTILE IRON ENCASEMENT
1-2'
AND MINOR GRADING
TOPSOIL PLACEMENT
HDPE - DR11
REPLACEMENT
8" SEWER LINE
HDPE - DR11
REPLACEMENT
8" SEWER LINE
150'0 75'
REPLACEMENT
MANHOLE
SHALL BE AT THE CONTRACTOR'S EXPENSE.
15. THE WATER LINE SHALL HAVE IN PLACE PROTECTION AND ANY DAMAGES TO THE WATER LINE
REPAIRS SHALL NOT BE COLD PATCH.
ASPHALT WILL HAVE TO BE REMOVED FOR NEW SEWER LINE AND ENCASEMENT PIPES. ROADWAY
14. ASPHALT TO BE REPLACED WHERE CAST IRON ENCASEMENT SLEEVES ARE LOCATED. CURRENT
THE CONTRACTING OFFICER AT THE CONTRACTOR'S EXPENSE.
LAYDOWN AREA SHALL BE RESTORED TO PRE-CONSTRUCTION CONDITIONS TO THE SATISFACTION OF
DAMAGES TO THE LAYDOWN AREA DURING CONSTRUCTION. UPON CONSTRUCTION COMPLETION, THE
13. THE LAYDOWN AREA SHALL BE LOCATED AS INDICATED IN THE DRAWING. MINIMIZE FOOTPRINT AND
CONSTRUCTION RIPRAP ENCAPSULATES PRE-CONSTRUCTION LIMITS.
12. NOTE LIMITS OF EXISTING RIPRAP ON THE NORTH END PRIOR TO CONSTRUCTION TO ENSURE POST
MATERIALS ARE PLACED AT PRE-CONSTRUCTION ELEVATIONS.
11. INVERT ELEVATIONS SHOULD BE CAPTURED WITH EXISTING CONDITIONS TO ENSURE THAT NEW
CONTRACTOR WILL BE COMPLETE WITH ALL TASKS INCLUDING CLEAN UP, BY MARCH 1, 2021.
10. CONSTRUCTION SHALL NOT COMMENCE PRIOR TO SEPTEMBER 30, 2020. THE
A MANNER SO THAT THE CONTRACTOR CAN BACKFILL ALL OPEN TRENCHES WITHIN 48 HOURS.
9. UNLESS OTHERWISE APPROVED, TRENCH EXCAVATION AND PIPE PLACEMENT SHALL PROGRESS IN
CONTRACTOR AND SHALL BE DISPOSED OF IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS.
8. EXISTING SEWER LINE REMOVED DURING CONSTRUCTION SHALL BECOME THE PROPERTY OF THE
CONSTRUCTION.
7. SEE ELECTRICAL LINE REFERENCE FOR SPLICING REQUIREMENT NOTES IF A LINE IS SEVERED DURING
6. REFER TO BID SCHEDULE FOR APPROXIMATE LENGTHS OF PIPE REQUESTED.
THE DETAILS. LOCATION OF THE NEW SEWER LINE SHOWN ON THE DRAWINGS IS APPROXIMATE.
5. THE NEW SEWER PIPING SHALL BE HDPE DR11 AND SHALL BE PLACED AT THE DEPTH REQUIRED BY
AND FINAL PIPE ALIGNMENT WITH THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION.
UTILITIES AND SITE FEATURES PRIOR TO BEGINNING CONSTRUCTION. COORDINATE DISCREPANCIES
4. THE CONTRACTOR SHALL FIELD VERIFY ALL PROPOSED ALIGNMENTS WITH RESPECT TO EXISTING
3. XYZ CAD DATA WILL BE MADE AVAILABLE UPON CONTRACTOR'S REQUEST.
ESTIMATE PIPE LENGTH BASED ON DRAWINGS PROVIDED.
2. IMAGERY PROVIDED FOR GENERAL SITE ORIENTATION. IMAGERY WAS ALSO USED TO SCALE AND
THE IMAGERY WAS CAPTURED ON MARCH 15, 2019.
1. IMAGERY WAS IMPORTED INTO MICROSTATION FROM GOOGLE EARTH. ACCORDING TO THE SOFTWARE, GENERAL NOTES:
A M
D
E X
IS
T
W A
T E
R L
IN
E A
D D
E D T
O P
L A
N V
IE
W R
A W
/0
/2
WATER
WATER SHUTOFF
FABRIC AND STONE
AND PLACE GEOTEXTILE
EXCAVATE EXISTING SOIL
EXCAVATION)
(BOTTOM AND SIDES OF
GEOTEXTILE FILTER FABRIC
12" CLASS II CHANNEL LINING
1 (MIN)
12.5
RIPRAP DETAIL - TYPICAL CROSS SECTION
File details come from the government source that posted it. Updated .