CONTRACT DRAWINGS.pdf
PDF 967 KB Posted
- Attached to
- Barkley Heating, Ventilating and Air Conditioning (HVAC) Replacement Federal contract opportunity
- Solicitation number
- W912P520Q0012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Barkley HVAC Tspecs RTA_R3 1-31-2020.pdf | ||
| MECHANICAL REFERENCE DWGS.pdf | ||
| Foreign_National_Site_Visit_Request_Form.pdf | ||
| W912P520Q0012 BAP Control Room HVAC Replacement.pdf | ||
| Cover Sheet.pdf | ||
| Site_Visit_Request_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"64
3'-5
"16
3'-7
"64
2'-6
®of Engineers
US Army Corps of Engineers
US Army Corps
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
IS
S
U E D
A T
E
X
X
F
E B
A R
C H F
P L
O T S
C A
L E
Q9-M-01
C U
M B
E R
L A
N D R
IV
E R
B A
R K
L E
Y P
R O J E
C T
P O
W E
R H
O U
S E
H V
A C R
E P
L A
C E
M E
N T
NASHVILLE DISTRICT
T H A
V E
N U
E S
O U
T H
N A
S H
V
IL
L E T
N
-3
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
K E
W
D S
L
F E
B
B E
N J
A M
IN
R
O H
R B
A C
H
Q -M
-0 .D
G N
X
P l o t
T i m e
P l
D a t e
F i l e
N m e
:5
:4
A M c u s e r s h e c x d s l\ p w w o r k c e lr n d m s
Q
M .d g n
A
B
C
D
1 2 3 4 5 6
E
F A
N R
O O
M D
E T
A
IL
W P
Q
E-BOARD
PENETRATION FOR AC-2
SUPPLY DUCT FLOOR
IN VERTICAL DUCT RUN
EXISTING DUCT HEATER
LOCK SIDE
O F F
IC
E
D O
W N
S T
R E
A M
HVAC ROOM DETAIL
LAND SIDE
OFFICE
U P
S T
R E
A M
NOT TO BE DISTURBED
EXISTING DUCT HEATER,
LOCATION
SHUTOFF VALVE
COOLING WATER
EXISTING
SEE NOTE 3
PENETRATION FOR AC-2,
RETURN DUCT FLOOR
SCREWS ARE REQUIRED PER EQUIPMENT RACK.
SEE SPECIFICATION SECTION 05 50 13 FOR CONCRETE ANCHOR REQUIREMENTS. 4 ANCHOR
SHALL BE PER MANUFACTURERS RECOMMENDATIONS FOR MOUNTING THE HEAT EXCHANGER.
PLUMBING SCHEMATIC ON DRAWING Q9-M-03. MOUNTING SUPPORTS AND BOLT PATTERN
UPPER SECTION IS TO BE USED FOR MOUNTING STRAINERS AND BALL VALVES PER
ACCORDINGLY TO PROVIDE A SECURE MOUNTING LOCATION FOR THE HEAT EXCHANGER.
2. EQUIPMENT RACK LAYOUT SHOWN IS REFERENCE ONLY. ADJUST SUPPORTS AND STRAPS
AIR HANDLERS IN PLACE.
THIS SHEET ARE APPROXIMATIONS OF HOW THE FINAL LAYOUT MAY LOOK WITH THE NEW
BE OF EQUAL OR LESS FOOT PRINT OF THE EXISTING UNITS. DUCT RUNS DEPICTED ON
1. AIR HANDLER LOCATIONS SHOWN ARE APPROXIMATE. NEW AIR HANDLERS SHALL
NOTES:
6. FOR EQUIPMENT SCHEDULE SEE DWG Q9-M-04.
5. FOR PIPING DIAGRAM SEE DWG Q9-M-03.
EXISTING AC UNIT AND CONDENSERS PRIOR TO HANDING OVER TO GOVERNMENT.
4. SEE SPECIFICATIONS FOR DISCONNECTION AND PREPARATIONS FOR STORAGE OF
REQUIREMENTS. 2 ANCHORS PER SHORT SIDES AND 4 ANCHORS PER LONG SIDES.
ADDITIONAL DETAILS. SEE SPECIFICATION SECTION 05 50 13 FOR CONCRETE ANCHOR
EXISTING FLOOR OPENING FOR THE AC UNIT 2 RETURN DUCT. SEE SPECIFICATIONS FOR
3. NEW FLASHING, WITH HEIGHT OF 2" AND LEG OF 2", SHALL BE INSTALLED AROUND THE
8. SEE DWG Q9-M-05 FOR EQUIPMENT RACK DETAILS.
EQUIPMENT RACK AND ADDITIONAL DETAILS.
7. SEE SPECIFICATION SECTION 05 50 13 FOR WELDING REQUIREMENTS FOR THE
EXISTING 2"� PIPE PIPE REDUCER
NEW 2" TO 3"
NEW 3"� PIPE
FLOOR DRAIN
NOT TO SCALE
DIRECTION (TYP.)
WATER FLOW
TO EXISTING FLOOR DRAIN
NEW WATER DISCHARGE PIPE
MODIFY AS NEEDED
22" x 14" RETURN DUCT
RACK
NEW EQUIPMENT
SUPPORTED OVERHEAD
MODIFY AS NEEDED,
26" x 14" SUPPLY DUCT
MIXING BOX
NEW RETURN
NEW AC-2
TO BE REPLACED
COOLING WATER HEADER
NEW AC-1
ENTERS OVERHEAD
MODIFY AS NEEDED,
23" x 14" RETURN DUCT
MIXING BOX
NEW RETURN
RACK
NEW EQUIPMENT
EXITS OVERHEAD
MODIFY AS NEEDED,
26" x 14" SUPPLY DUCT
EXISTING FLOOR DRAIN
NEW WATER DISCHARGE PIPE TO
RTA CERTIFIED FINAL
®of Engineers
US Army Corps of Engineers
US Army Corps
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
IS
S
U E D
A T
X
E B
A
B
C
D
1 2 3 4 5 6
E
A R
C H F
P L
O T S
C A
L E
P l m e
P l t e
F i m e
:0
:3
P c u s e r s h e c x d s l\ p w w o r k c e lr n d m s
Q
M .d g n
Q9-M-02
C U
M B
E R
L A
N D R
IV
E R
B A
R K
L E
Y P
R O J E
C T
P O
W E
R H
O U
S E
H V
A C R
E P
L A
C E
M E
N T
NASHVILLE DISTRICT
T H A
V E
N U
E S
O U
T H
N A
S H
V
IL
L E T
N
-3
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
K E
W
D S
L
F E
B
B E
N J
A M
IN
R
O H
R B
A C
H
Q -M
-0 .D
G N
X
F A
N R
O O
M P
L A
N
W P
Q
LAND SIDE
D O
W N
S T
R E
A M
O F F
IC
E
E-BOARD
LOCK SIDE
RETURN MIXING BOX
AC-2
AC-1
PENETRATION FOR AC-2
SUPPLY DUCT FLOOR
NOT TO BE DISTURBED
EXISTING DUCT HEATER,
ENTERS OVERHEAD
RETURN DUCT,
EXISTING 23" x 14"
MIXING BOX
EXISTING RETURN
EXITS OVERHEAD
SUPPLY DUCT,
EXISTING 26" x 14"
NOT TO BE DISTURBED
IN VERTICAL DUCT RUN,
EXISTING DUCT HEATER
SUPPORTED OVERHEAD
SUPPLY DUCT,
EXISTING 26" x 14"
FLOOR PENETRATION
RETURN DUCT
EXISTING 22" x 14"
3. EXISTING POWER FEEDERS FROM THE BREAKER ARE TO BE REPLACED.
TO OPERATE IN IDENTICAL MANNER AS THEY DO NOW.
THEM TO THE NEW THERMOSTATS ONCE INSTALLED SO THAT THEY CONTINUE
2. NO WORK IS TO BE DONE ON THE EXISTING DUCT HEATERS OTHER THAN TO WIRE
APPROXIMATE. DIMENSIONS AND LOCATIONS ARE TO BE FIELD VERIFIED.
1. DUCT DIMENSION ARE TAKEN FROM REFERENCE DRAWINGS. DUCT LOCATIONS ARE
NOTES:
FAN ROOM PLAN
FLOOR DRAIN
NOT TO SCALE
of Engineers
US Army Corps
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
IS
S
U E D
A T
X
E B
A
B
C
D
1 2 3 4 5 6
E
A R
C H F
P L
O T S
C A
L E
P l m e
P l t e
F i m e
:1
:1 c u s e r s h e c x d s l\ p w w o r k c e lr n d m s
Q
M .d g n
Q9-M-03
C U
M B
E R
L A
N D R
IV
E R
B A
R K
L E
Y P
R O J E
C T
P O
W E
R H
O U
S E
H V
A C R
E P
L A
C E
M E
N T
NASHVILLE DISTRICT
T H A
V E
N U
E S
O U
T H
N A
S H
V
IL
L E T
N
-3
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
K E
W
D S
L
F E
B
B E
N J
A M
IN
R
O H
R B
A C
H
Q -M
-0 .D
G N
X
P
IP
IN
G S
C H
E M
A T
IC
W P
Q
EXISTING 2" PVC
NEW 3" STAINLESS STEEL PIPE
NEW 2" STAINLESS STEEL PIPE
NEW 2" STAINLESS STEEL PIPE
NEW 2" STAINLESS STEEL PIPE
NEW 3" STAINLESS STEEL PIPE
EXISTING FLOOR DRAIN
EXISTING SHUT OFF VALVE
HX-1
HX-2HX-4
HX-3
N.O. N.O.
N.C.N.C.
N.O. N.O.
N.C. N.C.
NEW 2" TO 3" DIA. PIPE REDUCER
CAPPED TEE
HEAT EXCHANGER(CONDENSER )
CONTROL VALVE
STRAINER
BALL VALVE
LEGEND:
F.D. : FLOOR DRAIN
N.O. : NORMALLY OPEN
N.C. : NORMALLY CLOSED
F.D.
DIRECTION (TYP.)
WATER FLOW
AC 1 AC 2
NEW 3" STAINLESS STEEL.
IS TO BE REPLACED IN THE FUTURE BY OTHERS TO MATCH THE
7. THE EXISTING PIPE BEFORE THE EXISTING SHUTOFF VALVE
SO THAT THE CAPPED PORT IS HORIZONTAL TO FLOOR.
6. TEES ON EITHER SIDE OF CONDENSERS SHALL BE INSTALLED
MANUFACTURER RECOMMENDATION.
CONDENSER TO FACILITATE CLEANING OF THE UNITS PER
5. PROVIDE A CAPPED PIPE CONNECTION ON BOTH SIDES OF THE
ANY SPLASHING.
4. MODIFY EXISTING FLOOR DRAIN AS NECESSARY TO ELIMINATE
BOARD.
3. CONTROL ACTUATORS TO BE WIRED TO AIR HANDLER CONTROL
WHILE LEAVING THE REST OF THE SYSTEM FUNCTIONING.
MANNER SO THAT EACH INDIVIDUAL PIECE CAN BE ISOLATED
2. EACH STRAINER AND CONDENSER SHALL BE PLUMBED IN A
DETAILS.
1. SEE SPECIFICATIONS FOR ADDITIONAL PIPE AND EQUIPMENT
NOTES:
of Engineers
US Army Corps
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
IS
S
U E D
A T
X
E B
A
B
C
D
1 2 3 4 5 6
E
A R
C H F
P L
O T S
C A
L E
P l m e
P l t e
F i m e
:1
:3 c u s e r s h e c x d s l\ p w w o r k c e lr n d m s
Q
M .d g n
Q9-M-04
C U
M B
E R
L A
N D R
IV
E R
B A
R K
L E
Y P
R O J E
C T
P O
W E
R H
O U
S E
H V
A C R
E P
L A
C E
M E
N T
E Q
U
IP
M E
N T S
C H
E D
U L E
NASHVILLE DISTRICT
T H A
V E
N U
E S
O U
T H
N A
S H
V
IL
L E T
N
-3
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
K E
W
D S
L
F E
B
B E
N J
A M
IN
R
O H
R B
A C
H
Q -M
-0 .D
G N
X
W P
Q
MARK TYPE MISCELLANEOUS MANUFACTURER MODEL NO.
ID TYPE (BTU/H)
MAX COOLING
(BTU/H)
MAX HEATING
(DB)
PRESSURE
SOUND
RATING
SEER
TYPE
MOUNTING
ACCESSORIES MANUFACTURER MODEL QTY.
QTY.
72,000 81,000 12.9
PLUMBING ITEMS
UNIT, 10 TON
VERTICAL DISCHARGE AIR HANDLER FLOOR4,000
(CFM)
AIR FLOW
91.6
(V-PH-HZ)
POWER
40RUAA12A5A9-0A1A0THERMOSTAT WITH HUMIDITY SENSING
STRAINER
CONTROL VALVE
BALL VALVE
ID TYPE (BTU/H)
MAX COOLING
TYPE
MOUNTING
MANUFACTURER MODEL QTY.
60,000BRAZED PLATE HEAT EXCHANGER
(GPM)
FLOW RATE
WATER
STUDS
BACK
TYPE
FLOW
CURRENT
COUNTER
(DEGREE F)
INLET TEMP
COOLING WATER
(DEGREE F)
OUTLET TEMP
COOLING WATER
(DEGREE F)
INLET TEMP
REFRIGERANT
165 120
(DEGREE F)
OUTLET TEMP
REFRIGERANT
(INLET/OUTLET)
PIPE SIZE
COOLING
(INLET/OUTLET)
PIPE SIZE
REFRIGERANT
2" / 2" 1-1/8" / 5/8"40 B35TM2X18/1P
KECKLEY 21THY-BCM20M34-FTI
KECKLEY BVS2THFSSRGSL-200
OPEN AREA
MINIMUM 20 GAGE MESH STAINLESS STEEL SCREEN WITH 49%
2" PIPE CONNECTION, Y-STRAINER, THREADED CONNECTIONS,
STEEL HANDLES
NACE MR0175 COMPLIANT, STANDARD LOCKING STAINLESS
2" PIPE CONNECTION, W.O.G. 2160 PSI @ 100 DEGREE F,
AIR HANDLER
ST
CV
BV
HEAT EXCHANGER
JOHNSON CONTROLS
DIVERSIFIED HEAT TRANSFER, INC
CARRIER
REMARKS
1, 2, 3, 4, 5, 6, 7, 9, 10
REMARKS
1, 7, 8, 10
REMARKS
1, 3, 10
1, 3, 10
(HP)
FAN MOTOR
3.7
FLA
FAN MOTOR
10.5/10.5 13.3/13.3
MIN CIRCUIT AMPS
POWER SUPPLY
MOCP
POWER SUPPLY
1, 3, 10, 11
460-3-60
VG7441ST
VA-4233-BGA-2,
STAINLESS STEEL VALVE CONSTRUCTION
DESIGN, SPRING-RETURN CLOSED, MANUAL HAND CRANK,
ELECTRIC ACTUATOR WITH 24VDC, MAINTENANCE- FREE
2" PIPE CONNECTION, 400 PSI STATIC PRESSURE RATING,
AC-1
172,000 81,000 12.9
UNIT, 10 TON
VERTICAL DISCHARGE AIR HANDLER FLOOR4,000 91.6 40RUAA12A5A9-0A1A0THERMOSTAT WITH HUMIDITY SENSING CARRIER 1, 2, 3, 4, 5, 6, 7, 9, 103.7 10.5/10.5 13.3/13.3 20460-3-60AC-2
HX-1
HX-2
60,000BRAZED PLATE HEAT EXCHANGER 2
STUDS
BACK
CURRENT
COUNTER 85 88 165 1202" / 2" 1-1/8" / 5/8"40 B35TM2X18/1PDIVERSIFIED HEAT TRANSFER, INC 1, 7, 8, 10HX-3
HX-4
INSTRUCTIONS FOR FOR ADDITIONAL DETAILS.
THERMOSTAT, SEE MANUFACTURERS INSTALLATION, START-UP AND SERVICE
OTHERWISE CV ARE TO REMAIN CLOSED. CONTROL SIGNAL IS 24VDC FROM THE
11. CONTROL VALVE (CV )TO RECEIVE SIGNAL FROM THERMOSTAT TO OPEN FOR COOLING.
10. SEE SPECIFICATIONS FOR ADDITIONAL EQUIPMENT REQUIREMENTS.
OF THE ADJACENT DOOR OF AT LEAST 3' IN FRONT OF IT.
9. AC NO. 2 SHALL BE INSTALLED SO THAT THERE IS A CLEAR AREA DIRECTLY IN FRONT
BE INSTALLED TO FACILITATE DRAINING AND CLEANING OF THE HEAT EXCHANGER.
8. THREADED CAPPED TEE CONNECTIONS TO EITHER SIDE OF A HEAT EXCHANGER SHALL
A MANNER TO MINIMIZE POTENTIAL FOR DAMAGE FROM FALLING TOOLS OR MATERIAL.
7. ROUTING OF REFRIGERANT LINES FROM AC UNIT TO CONDENSERS SHALL BE DONE IN
DISCHARGE LINES TO THE FLOOR DRAIN.
MOUNTING DOES NOT PROVIDE ADEQUATE SLOPE FOR THE CONDENSATE OR
6. NEW AC UNIT CAN BE RAISED ON MANUFACTURER PROVIDED FEET IF FLOOR
MANUFACTURERS RECOMMENDATIONS.
VAPOR BARRIER. ANY DAMAGE TO THE VAPOR BARRIER SHALL BE REPAIRED PER
INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND HAVE A CONTINUOUS
VEINS. ALL NEW SECTIONS ARE TO HAVE 2 INCHES OF FIBERGLASS INSULATION
AND RETURN CONNECTIONS. ALL REPLACED 90 DEGREE TURNS SHALL HAVE TURNING
5. EXISTING DUCTWORK IS TO BE MODIFIED AS REQUIRED FOR THE NEW AC UNIT SUPPLY
RECOMMENDATIONS AS BEST PRACTICAL.
LOCATION AND INSTALLATION ARE TO BE PER MANUFACTURER REQUIREMENTS AND
4. POSITION OF NEW AIR HANDLERS ARE TO BE CLOSE TO AS SHOWN ON DRAWING Q9-M-01.
DETAILS.
3. QUANTITIES SHOWN ARE FOR BOTH AIR HANDLER ASSEMBLIES. SEE Q9-M-03 FOR ASSEMBLY
EQUIPMENT IS CONSIDERED A SECOND ASSEMBLY.
2. AC-2 AND ASSOCIATED EQUIPMENT IS CONSIDERED ONE ASSEMBLY; AC-1 AND ASSOCIATED
1. EQUIPMENT AS SPECIFIED OR APPROVED EQUAL.
9"
6"
"211'-
®of Engineers
US Army Corps of Engineers
US Army Corps
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
IS
S
U E D
A T
X
E B
A R
C H F
P L
O T S
C A
L E
Q9-M-05
C U
M B
E R
L A
N D R
IV
E R
B A
R K
L E
Y P
R O J E
C T
P O
W E
R H
O U
S E
H V
A C R
E P
L A
C E
M E
N T
NASHVILLE DISTRICT
T H A
V E
N U
E S
O U
T H
N A
S H
V
IL
L E T
N
-3
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
K E
W
D S
L
F E
B
B E
N J
A M
IN
R
O H
R B
A C
H
Q -M
-0 .D
G N
X
P l m e
P l t e
F i m e
:2
:4 c u s e r s h e c x d s l\ p w w o r k c e lr n d m s
Q
M .d g n
A
B
C
D
1 2 3 4 5 6
E
C O
N D
E N
S E
R R
A C
K D
E T
A
IL
S /2
W P
Q
SCALE: 6" = 1' - 0"
VIEW A-A
SCALE: 6" = 1' - 0"
VIEW B-B
B B
SCHEMATIC LAYOUT & LEGEND
SEE DWG Q9-M-03 FOR
EQUIPMENT LAYOUT
HANDLER (TYP.)
FACING THE AIR
PORTS TO BE
REFRIGERANT
HANDLER (TYP.)
FROM THE AIR
TO BE FACING AWAY
COOLING WATER PORTS
SEE NOTE 1
VERTICAL SUPPORTS
MATERIAL: SEE NOTE 1 AND SPECS.
MK. 1 MAKE: 1
EQUIPMENT RACK LAYOUT
SEE NOTE 2 & 3
RETAINING SUPPORTS
SEE SPECIFICATIONS
CONCRETE ANCHORS (TYP.)
A
A
HX-2
HX-1
THE WALL.
HEAT EXCHANGERS AND BE ROUTED TO THE FLOOR DRAIN, SHOWN ON Q9-M-01, ALONG
THE PIPE AT THIS POINT IS DISCHARGED AND IS TO CONNECT DISCHARGE FROM BOTH
FOLLOWED BY A CAPPED TEE UPSTREAM OF IT FOLLOWED BY A TEE AND BALL VALVE DOWNSTREAM.
WILL SEPARATE THE FLOW FOR THE HEAT EXCHANGER WHICH WILL HAVE A CONTROL VALVE
PIPES ARE THAN TO TEE TOGETHER AND COME DOWN THE RIGHT SIDE OF THE RACK. A TEE
BALL VALVES SERVING TWO STRAINERS WITH ADDITIONAL BALL VALVE DOWNSTREAM.
5. COOLING WATER PIPES TO COME IN OVERHEAD ON LEFT SIDE OF RACK. THEN TEE OFF TO
4. ALL WELDS TO COMPLY WITH SPECIFICATION SECTION 05 50 13.
RECOMMENDED BY THE MANUFACTURER TO ELIMINATE VIBRATION.
CHANNEL COMBINATION. USE RUBBER INSERT AND EXPANDING DEVICE AS
3. RETAINING SUPPORT CAN BE BENT INTO SHAPE AND WELDED OR BOLTED TO FRAME /
2. RETAINING SUPPORT TO MATCH PLACEMENT OF BOLT PATTERN ON HEAT EXCHANGER.
SEE SPECIFICATION SECTION 05 50 13 FOR CONCRETE ANCHOR REQUIREMENTS.
SHALL BE PER MANUFACTURERS RECOMMENDATIONS FOR MOUNTING THE HEAT EXCHANGER.
PLUMBING SCHEMATIC ON DRAWING Q9-M-03. MOUNTING SUPPORTS AND BOLT PATTERN
UPPER SECTION IS TO BE USED FOR MOUNTING STRAINERS AND BALL VALVES PER
ACCORDINGLY TO PROVIDE A SECURE MOUNTING LOCATION FOR THE HEAT EXCHANGER.
1. EQUIPMENT RACK LAYOUT SHOWN IS REFERENCE ONLY. ADJUST SUPPORTS AND STRAPS
| Q9-M-01 |
| Q9-M-02 |
| Q9-M-03 |
| Q9-M-04 |
| Q9-M-05 |
File details come from the government source that posted it. Updated .