This Amendment is to correct Block 10 magnitude, this is the only item that is changed in Block 10.

View the file

Other files for this federal contract opportunity

Other files attached to Lorain Breakwater, newest first.
File Type Posted
Abstract_IGE_adjusted_Lorain_19.xls XLS spreadsheet
W912P419B0026-0003.pdf PDF
AmendmentQA.pdf PDF
amendment1.pdf PDF
SolicitationFull.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Is to correct Block 10

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P419B0026

X 9B. DATED (SEE ITEM 11)

22-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0003

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Aug-2019

CODE

U.S. ARMY ENGINEER DISTRICT, BUFFALO

1776 NIAGARA STREET

BUFFALO NY 14207-3199

W912P4 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P419B0026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

From:

SECTION 00 10 00 - SOLICITATION

The required performance has changed from The USACE Buffalo District is currently soliciting an award a contract for Lorain Breakwater Repair.Work at the Lorain Detached Breakwater includes but is not limited to supplying all plant, labor, equipment, and materials necessary to repair the structure and construct a standalone rectangular cell, approximately 51 feet long by 31 feet wide, within the existing breakwater's gap. The Government intends to award on a Firm Fixed Price contract for the Lorain Breakwater as a result of this solicitation. The contract willhave a period of performance of 12 months on base work from issuance of Notice to Proceed. Please see Section 01 35 13 of thespecification and FAR Clause 52.211-10 for more information.This will be a full and open, unrestricted procurement. The applicable Wage Determination is IL 190018. The Wage Determination is attachedin the solicitation.The cost of this project is estimated at $5,000,000 to $10,000,000. The Buy American Act is applicable to this acquisition. A Bid Guaranteeshall be submitted with the bid to be the considered responsive.

The amount of the guarantee shall be 20% of bid amount or $3,000,000whichever is less, see FAR Clause 52.228- 1.Subcontracting Plan is required for Large Business after bid opening See Instructions to bidders. to The USACE Buffalo District is currently soliciting an award a contract for Lorain Breakwater Repair.Work at the Lorain Detached Breakwater includes but is not limited to supplying all plant, labor, equipment, and materials necessary to repair the structure and construct a standalone rectangular cell, approximately 51 feet long by 31 feet wide, within the existing breakwater's gap.

To:

The Government intends to award on a Firm Fixed Price contract for the Lorain Breakwater as a result of this solicitation. The contract willhave a period of performance of 12 months on base work from issuance of Notice to Proceed. Please see Section 01 35 13 of thespecification and FAR Clause 52.211-10 for more information.This will be a full and open, unrestricted procurement. The applicable Wage Determination is IL 190018. The Wage Determination is attachedin the solicitation.The cost of this project is estimated at $1,000,000 to $5,000,000. The Buy American Act is applicable to this acquisition. A Bid Guaranteeshall be submitted with the bid to be the considered responsive. The amount of the guarantee shall be 20% of bid amount or $3,000,000whichever is less, see FAR Clause 52.228-1.Subcontracting Plan is required for Large Business after bid opening See Instructions to bidders..

(End of Summary of Changes)