Amendment_3_19Mar2015.pdf

PDF 207 KB Posted

Attached to
Cleveland Harbor Dredging Federal contract opportunity
Solicitation number
W912P4-15-B-0001
Issued by
Department of the Army Corps of Engineers Engineering District Buffalo

About this file

Please see attached amendment 3 correcting admin errors to bid schedules.

View the file

Other files for this federal contract opportunity

Other files attached to Cleveland Harbor Dredging, newest first.
File Type Posted
Bid_Abstract_Schedule_B_24Mar2015.pdf PDF
Bid_Abstract_Schedule_A_24Mar2015.pdf PDF
Bid_Abstract_Schedule_C_24Mar2015.pdf PDF
Amendment_2_13March2015.pdf PDF
Amendment_1_05Mar2015.pdf PDF
Solicitation_Final_24Feb2015(2).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00010

SOLICITATION, OFFER, AND AWARD (SF1142) AND BIDDING SCHEDULE

BIDDING SCHEDULE "A"

Bids on Bidding Schedule “A” will be based upon dredging and disposal of dredged material from the Cuyahoga River in the Government-furnished Confined Disposal Facility (CDF) #10B, and Open Lake Placement Site #1, as shown on the contract drawings, in accordance with these specifications.

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

SPRING/SUMMER 2015 DREDGING PERIOD

1 Mobilization and Demobilization JB $ $

Maintenance Dredging: Upper Cuyahoga River (STA 735+00 to 799+92) w/ placement in Open Lake Site #1)

155,000

CY

Maintenance Dredging: Lower Cuyahoga River (Sta. 499+34 to 735+00) and Old River w/ placement in Government-furnished CDF #10B)

45,000

Total Estimated Amount (Items 1 ~ 3) $

OPTION "A" FALL 2015 DREDGING PERIOD

4 Mobilization and Demobilization JB $ $

5 Maintenance Dredging: Upper Cuyahoga River (Sta. 749+00 to 799+92) w/ placement in Open Lake Site #1)

25,000

CY $ $

Total Estimated Option "A" Amount (Items 4-5) $

Total Estimated Amount (Items 1 through 5) $

(Cont.)

SCHEDULE "A" CONTINUED:

NOTE 1: BIDDERS ARE REQUIRED TO BID ON ALL SCHEDULES. THE GOVERNMENT

RESERVES THE RIGHT TO MAKE AWARD TO THE LOWEST BIDDER (BASE + OPTIONS)

ON "SCHEDULE A", "SCHEDULE B", OR "SCHEDULE C". THE CONTRACTING OFFICER

WILL DETERMINE AN OFFER UNRESPONSIVE FOR FAILURE TO BID ON ALL SCHEDULES.

NOTE 2: FOR BID EVALUATION PURPOSES, THE TOTAL BID WILL BE BASED UPON THE

TOTAL OF THE BASE BID (ITEMS 1 ~ 3) AND OPTIONS (ITEMS 4 THROUGH 5) SHOWN

ABOVE. EACH SCHEDULE WILL BE EVALUATED INDIVIDUALLY AND NO

COMBINATION OF SCHEDULES WILL BE PERMITTED.

NOTE 3: THE GOVERNMENT MAY ELECT TO AWARD ANY OPTION ON AN INDIVIDUAL

SCHEDULE OR NO OPTIONS. IF ANY OF THESE OPTION ITEMS ARE AWARDED, THE

GOVERNMENT RESERVES THE RIGHT TO LIMIT THE QUANTITY OF MATERIAL UP TO

THE ESTIMATED QUANTITY OF EACH OPTION ITEM.

NOTE 4: ANY OPTIONS AWARDED ON SCHEDULE "A" WILL BE AWARDED WITHIN THE

FOLLOWING SCHEDULE:

(1) OPTION A (FALL DREDGING) - BY 01 OCTOBER, 2015

BIDDING SCHEDULE "B"

Bids on Bidding Schedule “B” will be based upon dredging and disposal of dredged material from the Cuyahoga River in the Government-furnished Confined Disposal Facility (CDF) #10B, and a contractor-furnished placement area, as shown on the contract drawings, in accordance with these specifications.

Item Estimated Unit Estimated

2 Maintenance Dredging: Lower

Cuyahoga River (Sta. 499+34 to 735+00) and Old River w/ furnished CDF 10B) 45,000

Total Estimated Amount (Items 1-2) $

OPTION "A"SPRING/SUMMER 2015 DREDGING PERIOD

3 Maintenance Dredging: Upper

799+92) w/ placement in Government-furnished CDF 10B)

70,000

OPTION "B"SPRING/SUMMER 2015 DREDGING PERIOD

4 Maintenance Dredging: Upper

799+92) w/ placement in Contractor-furnished Placement Area) 45,000

SCHEDULE "B" CONTINUED:

OPTION "C" FALL 2015 DREDGING PERIOD

5 Mobilization and Demobilization JB $ $

6 Maintenance Dredging: Upper

Cuyahoga River (Sta. 749+00 to 799+92) w/ placement in Government-furnished CDF #10B) 20,000

Total Estimated Option "C" Amount (Items 5-6) $

Total Estimated Amount (Items 1 ~6) $

RESERVES THE RIGHT TO MAKE AWARD TO THE LOWEST BIDDER (BASE + OPTIONS)

TOTAL OF THE BASE BID (ITEMS 1 ~ 2) AND OPTIONS (ITEMS 3 THROUGH 6) SHOWN

NOTE 4: ANY OPTIONS AWARDED WILL BE AWARDED WITHIN THE FOLLOWING

SCHEDULE:

(1) OPTION A - WITHIN 60 DAYS OF CONTRACT AWARD

(2) OPTION B - WITHIN 75 DAYS OF CONTRACT AWARD

(3) OPTION C (FALL DREDGING) - BY 01 OCTOBER, 2015

BIDDING SCHEDULE "C"

Bids on Bidding Schedule “C” will be based upon dredging and mechanical placement of all dredged material from the Cuyahoga River in the Government-furnished Confined Disposal Facility (CDF) #10B as shown on the contract drawings, in accordance with these specifications.

Item Estimated Unit Estimated

2 Maintenance Dredging: Upper

799+92) w/ w/ mechanical furnished CDF #10B) 115,000

3 Maintenance Dredging: Lower

Cuyahoga River (STA 499-34 to 735+00) and Old River w/ mechanical placement in Government-furnished CDF #10B)

45,000

4 Temporary CDF Improvement JB $ $

Total Estimated Amount (Items 1 ~ 4) $

OPTION "A" FALL 2015 DREDGING PERIOD

5 Mobilization and Demobilization JB $ $

6 Maintenance Dredging: Upper

Cuyahoga River (STA 749+00 to 799+92) w/ mechanical placement in Government-furnished CDF #10B)

20,000

Total Estimated Option "A" Amount (Items 5-6) $

SCHEDULE "C" CONTINUED:

Total Estimated Amount (Items 1 through 6) $

RESERVES THE RIGHT TO MAKE AWARD TO THE LOWEST BIDDER (BASE + OPTIONS)

TOTAL OF THE BASE BID (ITEMS 1 ~ 4) AND OPTIONS (ITEMS 5 THROUGH 6) SHOWN

NOTE 4: ANY OPTIONS AWARDED ON SCHEDULE "C" WILL BE AWARDED WITHIN THE

FOLLOWING SCHEDULE:

(1) OPTION A (FALL DREDGING) - BY 01 OCTOBER, 2015