Fairport Amendment #1.doc

DOC document 91 KB Posted

Attached to
Fairport Harbor Ohio Maintenance Dredging Federal contract opportunity
Solicitation number
w912p4-09-b-0005
Issued by
Department of the Army Corps of Engineers Engineering District Buffalo

About this file

Update the bidding schedule.

View the file

Other files for this federal contract opportunity

Other files attached to Fairport Harbor Ohio Maintenance Dredging, newest first.
File Type Posted
FY09 Fairport Dredging.pdf PDF
Fairport Amendment 3.doc DOC document
Fairport,Amendment 2.doc.pdf PDF
Fairport Final Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been modified:

BID SCHEDULE

SECTION 00010

SOLICITATION, OFFER, AND AWARD (SF 1442) AND BIDDING SCHEDULE

MAINTENANCE DREDGING

FAIRPORT HARBOR/GRAND RIVER

FAIRPORT, LAKE COUNTY, OHIO

BIDDING SCHEDULE “A”

Bid on Bidding Schedule “A” will be based upon dredging and disposal of dredged material from Fairport Harbor & Grand River in the Government-designated Open-Lake and Nearshore Disposal Area (-11’ LWD to Ordinary High Water Mark), as shown on the contract drawing, and in accordance with these specifications.

(See Section 35 20 23, MAINTENANCE DREDGING, Paragraph 3.3.2)

Item

No.

Description
Estimated

Quantity

Unit
Unit

Price

Estimated

Amount

1
Mobilization and Demobilization

LS

2
Maintenance Dredging:

Fairport Harbor (Inner Harbor & Grand River) w/ Open-Lake Disposal

100,000
CY
$______
3
Maintenance Dredging:

Fairport Harbor (Lake Approach Channel) w/ Nearshore Disposal in Disposal Area 2 (-11’ LWD to Ordinary High Water Mark)

50,000
CY
$______

Total Estimated Amount (Items 1, 2 & 3)

Option “A”:

Item

Estimated

Unit

No.

Quantity Unit Price Amount Additional Maintenance Dredging:

Fairport Harbor (Inner Harbor &

Grand River) w/ Open-Lake Disposal 70,000

CY $ ______ $ _________

Total Estimated Amount (Items 1, 2, 3 & 4)

Option “B”:

Additional Maintenance Dredging:

Fairport Harbor (Lake Approach Channel) w/ Nearshore Disposal in Disposal

Area 2 (-11’ LWD to Ordinary

High Water Mark)

40,000

Total Estimated Amount (Items 1, 2, 3, 4 & 5)

NOTE 1: The above “estimated quantity” pay items for dredging are based upon total estimated quantity of material available within the “required pay prism” plus a portion of the available “overdepth” material noted below. These quantities are approximate and do not indicate limitations in channel work areas:

Item Estimated Quantity in Quantity of Allowable

No. Required Pay Prism Overdepth Material Included

2 80,000 20,000

3 40,000 10,000

4 60,000 15,000

32,000 8,000

NOTE 2: BIDS MAY BE SUBMITTED ON ANY OR ALL OF THE BIDDING SCHEDULES. BIDS MUST BE COMPLETE AS TO ALL THE ITEMS ON THE SCHEDULE. FAILURE TO COMPLETE ALL ITEMS ON A BID SCHEDULE WILL RENDER THE BID NON-RESPONSIVE.

NOTE 3: Regarding Option Items “A” and/or “B”, the Government may elect to award either or both of these Option Items. If Options “A” and/or “B” are awarded, the Government reserves the right to limit the quantity of material up to the Estimated Quantity of the Option Item. Additionally, the Government may elect to award either Option “A” or “B” within a period of sixty (60) calendar days from the date of Contract Award.

NOTE 4: For bid evaluation purposes, the total bid will be based upon the base bid amount shown above (Items 1, 2 & 3) and the total of the Options (Items 4 & 5) shown above. The Government reserves the right to award to the lowest bidder on Bidding Schedule A, B, or C.

BIDDING SCHEDULE “B”

Bid on Bidding Schedule “B” will be based upon dredging and disposal of dredged material from Fairport Harbor & Grand River in the Government-designated Open-Lake and Nearshore Disposal Area (-8’ LWD to Ordinary High Water Mark), as shown on the contract drawing, and in accordance with these specifications.

(See Section 35 20 23, MAINTENANCE DREDGING, Paragraph 3.3.2)

Item

No.

Description
Estimated

Quantity

Unit
Unit

Price

Estimated

1
Mobilization and Demobilization

LS

2
Maintenance Dredging:

Fairport Harbor (Inner Harbor & Grand River) w/ Open-Lake Disposal

100,000
CY
$______
3
Maintenance Dredging:

Fairport Harbor (Lake Approach Channel) w/ Nearshore Disposal in Disposal Area 3 (-8’ LWD to Ordinary High Water Mark)

50,000
CY
$______

Total Estimated Amount (Items 1, 2 & 3)

Additional Maintenance Dredging:

Fairport Harbor (Inner Harbor &

Additional Maintenance Dredging:

Fairport Harbor (Lake Approach Channel) w/ Nearshore Disposal in Disposal

Area 3 (-8’ LWD to Ordinary

NOTE 1: The above “estimated quantity” pay items for dredging are based upon total estimated quantity of material available within the “required pay prism” plus a portion of the available “overdepth” material noted below. These quantities are approximate and do not indicate limitations in channel work areas:

Item Estimated Quantity in Quantity of Allowable

No. Required Pay Prism Overdepth Material Included

2 80,000 20,000

3 40,000 10,000

4 60,000 15,000

32,000 8,000

NOTE 2: BIDS MAY BE SUBMITTED ON ANY OR ALL OF THE BIDDING SCHEDULES. BIDS MUST BE COMPLETE AS TO ALL THE ITEMS ON THE SCHEDULE. FAILURE TO COMPLETE ALL ITEMS ON A BID SCHEDULE WILL RENDER THE BID NON-RESPONSIVE.

NOTE 3: Regarding Option Items “A” and/or “B”, the Government may elect to award either or both of these Option Items. If Options “A” and/or “B” are awarded, the Government reserves the right to limit the quantity of material up to the Estimated Quantity of the Option Item. Additionally, the Government may elect to award either Option “A” or “B” within a period of sixty (60) calendar days from the date of Contract Award.

NOTE 4: For bid evaluation purposes, the total bid will be based upon the base bid amount shown above (Items 1, 2 & 3) and the total of the Options (Items 4 & 5) shown above. The Government reserves the right to award to the lowest bidder on Bidding Schedule A, B, or C.

BIDDING SCHEDULE “C”

Bid on Bidding Schedule “C” will be based upon dredging and disposal of dredged material from Fairport Harbor & Grand River in the Government-designated Open-Lake and Nearshore Disposal Area (-2’ LWD to Ordinary High Water Mark), as shown on the contract drawing, and in accordance with these specifications.

(See Section 35 20 23, MAINTENANCE DREDGING, Paragraph 3.3.2)

Item

No.

Description
Estimated

Quantity

Unit
Unit

Price

Estimated

1
Mobilization and Demobilization

LS

2
Maintenance Dredging:

Fairport Harbor (Inner Harbor & Grand River) w/ Open-Lake Disposal

100,000
CY
$______
3
Maintenance Dredging:

Fairport Harbor (Lake Approach Channel) w/ Nearshore Disposal in Disposal Area 4 (-2’ LWD to Ordinary High Water Mark)

50,000
CY
$______

Total Estimated Amount (Items 1, 2 & 3)

Additional Maintenance Dredging:

Fairport Harbor (Inner Harbor &

Additional Maintenance Dredging:

Fairport Harbor (Lake Approach Channel) w/ Nearshore Disposal in Disposal

Area 4 (-2’ LWD to Ordinary

NOTE 1: The above “estimated quantity” pay items for dredging are based upon total estimated quantity of material available within the “required pay prism” plus a portion of the available “overdepth” material noted below. These quantities are approximate and do not indicate limitations in channel work areas:

Item Estimated Quantity in Quantity of Allowable

No. Required Pay Prism Overdepth Material Included

2 95,000 25,000

3 40,000 10,000

4 24,000 6,000

8,000 2,000

NOTE 2: BIDS MAY BE SUBMITTED ON ANY OR ALL OF THE BIDDING SCHEDULES. BIDS MUST BE COMPLETE AS TO ALL THE ITEMS ON THE SCHEDULE. FAILURE TO COMPLETE ALL ITEMS ON A BID SCHEDULE WILL RENDER THE BID NON-RESPONSIVE.

NOTE 3: Regarding Option Items “A” and/or “B”, the Government may elect to award either or both of these Option Items. If Options “A” and/or “B” are awarded, the Government reserves the right to limit the quantity of material up to the Estimated Quantity of the Option Item. Additionally, the Government may elect to award either Option “A” or “B” within a period of sixty (60) calendar days from the date of Contract Award.

NOTE 4: For bid evaluation purposes, the total bid will be based upon the base bid amount shown above (Items 1, 2 & 3) and the total of the Options (Items 4 & 5) shown above. The Government reserves the right to award to the lowest bidder on Bidding Schedule A, B, or C.