Amendment_0004.pdf
PDF 888 KB Posted
- Attached to
- AOG BEDDOWN BLDG 430, PROJECT NO. FFAN139009 Federal contract opportunity
- Solicitation number
- W912LP-16-B-0001
About this file
Amendment 0004 to W912LP-16-B-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AWARD_NOTICE_W912LP-16-C-0008.pdf | ||
| Amendment_3.pdf | ||
| Amendment_2.pdf | ||
| Amendment_0001_to_W912LP-16-B-0001.pdf | ||
| W912LP-16-B-0001.pdf | ||
| Attachment_1_J A_for_Brand_Name_Items.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FFAN139009
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0004 to Solicitation W912LP-16-B-0001, Project Number FFAN139009, Construct AOG Beddow n in Building 430 located at Des Moines, Iow a, is as follow s:
(Continued on Page 2)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jul-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912LP-16-B-0001
X 9B. DATED (SEE ITEM 11)
26-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jul-2016
CODE
USPFO FOR IOWA
7105 NW 70TH AVE
CAMP DODGE
JOHNSTON IA 50131-1824
W912LP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912LP-16-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
1. ATTACHMENT #1 CONTAINS QUESTIONS AND CONTAINS QUESTIONS AND ANSWERS, WHICH
DID NOT RESULT IN CLARIFICATIONS TO THE PLANS AND SPECIFICATIONS.
2. ATTACHMENT #2 CONTAINS ARCHITECTURAL CLARIFICATIONS TO THE PLANS AND
SPECIFICATIONS FOR AMENDMENT 0004.
3. ATTACHMENT #3 CONTAINS MEP CLARIFICATIONS TO THE PLANS AND SPECIFICATIONS FOR
AMENDMENT 0004.
3. THE BID OPENING DATE REMAINS UNCHANGED AT 1:00 P.M. C.S.T. ON FRIDAY, 8 JULY 2016, AT
THE IOWA AIR NATIONAL GUARD BASE, 3100 MCKINLEY AVENUE, DES MOINES INTERNATIONAL
AIRPORT, DES MOINES, IOWA, 50321.
4. ALL OTHER TERMS OF THE SOLICITATION REMAIN UNCHANGED.
(End of Summary of Changes)
Q1. Frame HM‐6 is shown on sheet 3A3.1 as having glass type G2 & G3.
Response: Incorrect, HM‐6 is shown on sheet 3A3.1 as having glass type G2 & G6
G2 is 1/4" Clear Tempered. G3 is 1/4" Clear Tempered Laminated.
Response: Correct
I only see two of those frames, right next to each other in room CP Console 1126.
Response: Correct
I’m not sure why each opening would have different glass.
Response: The openings have the same glass.
Q2. Glazing specs, paragraph 2.9, B, 2, specifies a “Sun Control” film. And then lists what windows are to receive that film. We’re all good until it says east wall of rom 1126. Why do you need a Sun
Control film at the interior locations? Just making sure that isn’t a typo.
Response: This is not a typo. The film is reflective and is being used in this location to create one way mirrored glass.
Q3. Door 1145.1 is listed on the door schedule with a type B door but no glass type is listed.
Response: Glass to be G2‐ Tempered Glass
Door D1.2 is listed on the door schedule with a type B door, glass type G3 (1/4” Laminated), rated “60M” and noted as “Blast Rated” in the Comments column.
Response: Change Glass to type G5‐ Fire Rated Tempered Glass
Door D2.1 is listed same as D1.2, but without the “Blast Rated” comment.
Response: Correct, door D2.1 is not “Blast Rated” Change Glass to type G5‐ Fire Rated
Tempered Glass
The “Glass Legend” lists glass type G5 (fire‐rated) and glass type G6 (one‐way mirror film) but glass specifications list only types G1, G2, G3, G4.
Response: Glass type G5: Refer to Glazing spec section 08800‐ paragraph 2.5; Glass type G6:
Refer to Glazing spec section 08800‐ paragraph 2.9B
ATTACHMENT #1
Page 1 of 2 ARCHITECTURE / ENGINEERING / INTERIORS
6 0 4 E AS T GRA ND A VE NU E
D ES MO I NES , IO W A 5 0 30 9
5 1 5 28 8 20 00
AMENDMENT NO. 04
DESIGN AOG BEDDOWN - BUILDING 430
IOWA AIR NATIONAL GUARD
DES MOINES INTERNATIONAL AIRPORT
DES MOINES, IOWA
Project No.: FFAN 139009
ARCHITECT'S FILE NO. 2010207.17
FEH DESIGN
604 East Grand Avenue Des Moines, Iowa 50309
PHONE: (515) 288-2000
DATE ISSUED: JULY 7, 2016
TO ALL BIDDING DOCUMENT HOLDERS OF RECORD:
A. REFER TO DRAWINGS
1. Sheet 3A3.1
a. Door Schedule
1) Door 1145.1
a. Glass Type: G2 (Tempered Glass)
2) Doors D1.2, D2.1
a. Change Glass type to G5 (Fire Rated Tempered Glass)
2. Sheet 3A7.1: At Rooms Elevations indicted below, add 6” h. x 8” w. ceramic tile wall base (CT-1), change 5’-0” high CT-2 section to 4’-0” h, and change 2’-6” high CT-2 section to 3’-0” h.
a. Room 1127: Elevations 23, 24, 25, 26
b. Room 1130: Elevations 18, 19, 20, 21
c. Room 1141: Elevations 27, 28, 29 30
3. Sheet 3A7.1: At Plan detail 2, delete keynote 224000.B1 pointing to shower floor. Floor finish to be Tile Type F10.
4. Sheet 3A9.1
a. Wall Material Legend
1) Change W2 to read: FRP at mop sink; see comments
b. Material Legend For Room Finish Schedule
1) Change remark 9 to read: Provide FRP Panel 8’-0” High.
2) Add Note 11: East wall, South wall to door, North wall 2’-0” wide
ATTACHMENT #2
Page 2 of 2 ARCHITECTURE / ENGINEERING / INTERIORS
6 0 4 E AS T GRA ND A VE NU E
D ES MO I NES , IO W A 5 0 30 9
5 1 5 28 8 20 00
c. Room Finish Schedule
1) 1117 Mech: N,S, & E Walls- W2,W5; Remarks: 9, 11
2) 1134 Jan: N,S,E,W Walls- W2,W5
3) 2096 Jan: N,S,E, W Walls- W6; Delete Remark 9
4) 2100 Jan: N,S,E,W Walls- W2, W5; Remarks: 9
5) Room 1135: change Wall Base from “B1” to “B2”.
d. At “Base” material legend, change B2 to read “Ceramic Tile Wall Base: 6” h. x 8” w.
(Same color/tile as floor)
5. Sheet 3A9.2
a. Plan 1 – First Floor Finish Plan: At room RRA 1130, add floor finish Type F10 at shower portion of room. Add marble threshold transition between tile types F10 & F11 per detail 12/3A9.2. Slope shower floor to drain.
B. REFER TO SPECIFICATIONS
1. 088000 Glazing
a. Paragraph 2.5
1) Add Sub heading A: Glass Type: G5: Fire rated tempered glass
b. Paragraph 2.9B
1) Change title to read: Glass Type G6: Exterior Sun Control Films
C. APPROVED MANUFACTURERS - Subject to compliance with requirements of the specifications and drawings, the following manufacturers are approved for use. All approved manufacturers must provide that each item and piece of equipment conforms to the design, quality and requirements of the specifications and drawings.
1. 08 1113 Hollow Metal Doors
a. Mesker Doors
i. Approved for Standard Hollow Metal Frames (Paragraph 2.2) Not approved for Blast Resistant Metal Doors & Frames (Paragraph 2.3)
2. 08 5113 Aluminum Windows
a. EFCO- 321X Series
i. Product will be approved upon successful installation provided that it matches the existing window profile exactly, as determined by Owner.
Contractor will be responsible for matching the new window frame and tinting to the existing windows of the building 430. If color cannot be matched, the product will be rejected and the contractor will be responsible for providing a window that meets the minimum requirements and matches the frame and tint colors.
END OF AMENDMENT 04
ATTACHMENT #2
AMENDMENT 4
10636 Justin Drive Des Moines, Iowa 50322 P: 515.331.0981 F: 515.331.0982 farris-usa.com engineering excellence
Date: 07/01/2016 Date of Issuance: 07/07/2016
Project Name: DESIGN AOG BEDDOWN Date of Opening: July 8, 2016
FE Project No.: 148005
NOTICE: This addendum is applicable to the referenced project and is issued to all known planholders prior to receipt of proposals. The information contained herein shall be fully incorporated into the Bid Contract Documents as though originally incorporated. Failure to acknowledge all amendments may be cause for rejection of the bid.
TO: Bidders and Others Concerned
Changes to the Project Manual
1. 281300 SECURITY SYSTEM
A. ADD SECTION 2.3 BADGING SYSTEM.
1) 2.3A PROVIDE COMPLETE BADGING SYSTEM AND CONTROL SUIT AS PART
OF DESIGN. BADGING SYSTEM SHALL CONSIST OF THE FOLLOWING ITEMS:
a) ALL INTERCONNECTED CABLES.
b) 1500 VA UPS WITH UPS MONITORING TO THE BADGING SYSTEM.
c) ALL LICENSING AND VPN SOFTWARE.
d) BADGE PRINTER, COLOR RIBBONS,
e) 10 PK CLEANING CARDS, 5 PPK SWABS, ADHESIVE CLEANING
SLEEVES 5PK
f) BADGE SLOT PUNCH
g) BADGE CLIP OF 1000 CT BADGES
h) 100 BLANK PVC CARDS
i) 300 PROXIMITY CARD PRINTABLE
j) ALL LABOR FOR THE INSTALLATION EQUIPMENT AND TRAINING OF
BADGE CREATION, INCLUSIVE OF TRAVEL TIME FOR
MANUFACTURES INTEGRATORS.
2. 271000 STRUCTURED CABLE SYSTEM
A. THE TELECOMMUNICATIONS ROOMS BEING PROVIDED AS PRIOR PROJECT WORKS
(WITHIN THE BUILDING) WILL BE USED (IN PART) FOR THE TERMINATION OF THE
STRUCTURED CABLING WITHIN THIS PROJECT. AS A RESULT, THE STRUCTURED
CABLING COMPONENTS (JACKS, CABLING, ETC.) FOR THIS CONTRACT SHALL
MATCH THE COMPONENTS USED FOR PHASE 2 TO PROVIDE COMPATIBILITY.
IMPLEMENTED PRODUCT FROM PAST PROJECTS WITHIN THE BUILDING: JACKS:
PANDUIT ENTERPRISE SOLUTIONS, COPPER CABLING: PANDUIT FOR 6A NON-
SHIELDED CABLES, SIEMON FOR 6A SHIELDED CABLES. FIBER OPTIC CABLES AND
TERMINATIONS: CORNING CONNECTIVITY.
Changes to the Drawings
3. 3P6.1 PLUMBING FIXTURE SCHEDULE
A. SHOWER SH-1, SH-2, AND SH-3. REPLACE WITH WRITEUPS BELOW.
B. SHOWER: SH-1
FIXTURE
IN-WALL SHOWER VALVE TO INCLUDE THE FOLLOWING STANDARD EQUIPMENT:
STANDARD FIXED DIRECTION ADJUSTABLE SPRAY SHOWERHEAD (2.0 GPM).
ATTACHMENT #3
http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ engineering excellence
AMENDMENT 4
INCLUDE (6'-0") STANDARD SHOWER HEAD HEIGHT (S1), (EF) EQUA-FLO PRESSURE
BALANCED MIXING VALVE, AND STOPS (ST) IN SUPPLIES.
BRADLEY 1C/EF/S1/ST OR APPROVED EQUAL.
C. SHOWER: SH-2
FIXTURE
IN-WALL SHOWER VALVE (A.D.A. COMPLIANT) WITH THE FOLLOWING STANDARD
EQUIPMENT. SHOWERHEAD (STANDARD FIXED DIRECTION ADJUSTABLE
SPRAYHEAD) (S1). DIVERTER VALVE (LEVER HANDLE OPERATION FOR TRANSFER
OF WATER FLOW BETWEEN FIXED AND HAND-HELD SHOWER SPRAY) (DV). HAND-
HELD SHOWER SPRAY (60" STAINLESS STEEL FLEXIBLE HOSE, 24” METAL SLIDE
BAR, VACUUM BREAKER AND QUICK DISCONNECT. (SB). EQUA-FLO PRESSURE
BALANCING VALVE W/2.0 GPM FLOW CONTROL. INCLUDE (6'-0") SHOWERHEAD
HEIGHT, STOPS IN SUPPLIES (ST),
BRADLEY 1C/EF/S1/DV/SB/ST OR APPROVED EQUAL.
D. SHOWER: SH-3
FIXTURE
IN-WALL SHOWER VALVE (A.D.A. COMPLIANT) WITH THE FOLLOWING STANDARD
EQUIPMENT. SHOWERHEAD (STANDARD FIXED DIRECTION ADJUSTABLE
SPRAYHEAD) (S1). DIVERTER VALVE (LEVER HANDLE OPERATION FOR TRANSFER
OF WATER FLOW BETWEEN FIXED AND HAND-HELD SHOWER SPRAY) (DV). HAND-
HELD SHOWER SPRAY (60" STAINLESS STEEL FLEXIBLE HOSE, 24” METAL SLIDE
BAR, VACUUM BREAKER AND QUICK DISCONNECT. (SB). EQUA-FLO PRESSURE
BALANCING VALVE W/2.0 GPM FLOW CONTROL. INCLUDE (6'-0") SHOWERHEAD
HEIGHT, STOPS IN SUPPLIES (ST),
BRADLEY 1C/EF/S1/DV/SB/ST OR APPROVED EQUAL.
FLOOR DRAIN
CAST IRON FLOOR DRAIN, TWO-PIECE BODY, NON-PUNCTURING FLASHING
COLLAR, SEEPAGE OPENINGS, BOTTOM OUTLET, 5"∅ ROUND NICKEL BRONZE
STRAINER.
J.R. SMITH 2005-NB OR APPROVED EQUAL.
ELASTOMERIC FLEXIBLE SEAL AND 2" INSERT FOR PRESSED FIT INTO THE
TAILPEICE OF THE DRAIN.
PROSET TRAP GUARD MODEL NO. TG2H OR APPROVED EQUAL.
4. 3EP2.1 SECOND FLOOR POWER PLAN
A. AT ROOM 2074 NORTH WALL RECEPTACLE, ADD ‘TV’ NOTATION.
5. 3EY1.2 FIRST FLOOR SPECIAL SYSTEMS PLAN - TELECOMMUNICATIONS
A. KEYNOTE 19 – REPLACE REFERENCE TO “MODEL FF1L-N11B-C62B” WITH REVISED
REFERENCE TO “MODEL FF1N-113B-C22B”. IMPACTS RACKS IN ROOM 1123.
6. 3EY1.3 FIRST FLOOR SPECIAL SYSTEMS PLAN – PUBLIC ADDRESS & AUDIO VISUAL
A. AT ROOM 1108, 1153 AVCB, 1094, & 1142 JUNCTION BOXES FOR TV CONNECTIONS,
ADD REFERENCE TO KEYNOTE 30.
7. 3EY2.2 SECOND FLOOR SPECIAL SYSTEMS PLAN - TELECOMMUNICATIONS
A. GENERAL NOTES: ADD NOTE 6:
1) ALL CABLES WITHIN THE SECURE PERMITER BOUNDARY SHALL BE
SHIELDED. CABLE OUTSIDE THE SECURE AREA BOUNDARY DO NOT
REQUIRE SHIELDED CABLES.
B. TELECOMMUNICATION OUTLET (T.O.) LEGEND, NOTE AQUA A A SUITABLE
ALTERNATE TO LIGHT BLUE.
ATTACHMENT #3
http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ engineering excellence
AMENDMENT 4
C. KEYNOTE 10 – REPLACE REFERENCE TO “MODEL FF1J-R11B-C62B” WITH REVISED
REFERENCE TO “MODEL FF1N-113B-C22B”. IMPACTS RACKS IN ROOM 2087.
D. KEYNOTE 19 – REPLACE KEYNOTE WITH:
1) PROVIDE A COMBINATION POWER/SIGNAL RAISED FLOOR BOX UNDER THE
WORKSTATION TABLE. PROVIDE FSR FLOOR BOX MODEL RFL4.5-D2G AND
BLACK CARPET TRIM COVER OR APPROVED EQUAL PROVIDE ALL
NECESSARY ADAPTER PANELS FOR THE SIGNAL DEVICES, DECORA COVER
PLATES FOR THE RECEPTACLES AND BLANK PANELS AS REQUIRED FOR
THE CONFIGURATION INDICATED.
8. 3EY2.3 SECOND FLOOR SPECIAL SYSTEMS PLAN – PUBLIC ADDRESS & AUDIO VISUAL
A. AT ROOM 2080, 2101 AVCB, JUNCTION BOXES FOR TV CONNECTIONS, ADD
REFERENCE TO KEYNOTE 32.
B. AT ROOM 2074, ADD JUNCTION BOX AT DISPLAY ON GRID C1, ADD REFERENCE TO
KEYNOTE 32.
9. 3E5.3 ADD DETAIL 5 “TYPICAL FLOOR BOX CONNECTION” FROM ADD4_3E5.3_DET5
Clarifications
10. MECHANAICAL
A. There are differences in ductwork insulation specifications and the schedule on the drawings.
Use the schedule on the drawings for ductwork insulation requirements.
B. Question: The secure bar detail 2 on sheet 3M5.1 states that the secure bars are to be located in secured perimeter.
Answer: Detail 2 on sheet 3M5.1 is reference twice on sheet 3MH2.1. Once on the 1/8” scale drawing for the ventilation air ductwork and once on the ¼” scale drawing for the ventilation exhaust air ductwork.
C. Question: Where are the secure perimeters that the duct penetrates requiring these secure bars?
Answer: See answer above.
D. Question: Are these required in any roof or floor penetrations?
Answer: No
E. If these are required, what are the fabrication details?
Question: What size and material are required for the bars?
Answer: Bars are to be a minimum of ¾”steel rods.
F. Question: What size and material is required for the frame?
Answer: 2-1/2” x ¼” bars.
These can also be purchase through the grilles, registers, and diffuser supplier.
Attachments
ADD4_3E5.3_DET5 (DRAWIING 8.5 X 11 HORIZONTAL)
ATTACHMENT #3
http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ engineering excellence
AMENDMENT 4
Miscellaneous
1. PRODUCT APPROVALS:
The following manufacturers are approved as substitute products of the named Base Bid manufacturer(s).
Approval is contingent upon manufacturers fulfilling all specification requirements, tangible and intangible, equally as well as specified product.
References/Item Manufacturer/Supplier 3EY6.1 Acceptable Lighting Manufactures
Type K, KB, KC, KC1 Peachtree Lighting Type L, L1 Pinnacle Architectural Lighting Type S1, S1A, S4 Phillips Gardco Type M1 Luminaire led
--END--
430 Phase 3 MEP Amendment #4
ATTACHMENT #3
http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/ http://www.farris-usa.com/
FLEX TO EMT COUPLING
CONCRETE FLOOR
FLOOR BOX
RAISED FLOOR
1" (25mm) CONDUIT (TYPICAL)
U-BOLT TYPE SUPPORT
1" (25mm) FLEXIBLE
METALLIC CONDUIT
PROVIDE A 3' (914mm) LOOP
OF FLEXIBLE CONDUIT
(AT THIS LOCATION)
FOR MINOR
RELOCATION OF
FLOOR BOX IN THE
FUTURE.
FARRIS ENGINEERING | OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS | farris-usa.com
DATE: CHECKED BY: APPROVED BY:
PROJECT NO: DRAWN BY: DRAWING NO:
SHEET TITLE:
PROJECT:
C:\Users\kpk\Documents\138030_Bldg 430 - Central - 14_kpk.rvt
7/7/2016 8:15:09 AM
ADD4_3E5.3_DET5 KPK07/07/16
2010207.11
MDW
IA ANG-FFAN139009 2MSK - 2MH2.2 - RFP 29KPK
SCALE: 12" = 1'-0"
1 TYPICAL FLOOR BOX CONNNECTION
ATTACHMENT #3
| Amendment W912LP-16-B-0001-0004 |
| Attachment #1 - Q&A |
| Attachment #2 - Architectural |
| Attachment #3 - MEP |
File details come from the government source that posted it. Updated .