Site_Visit_Questions_and_Responses_09162015_(3).docx
DOCX document 16 KB Posted
- Attached to
- Replacement Fire Hydrant, Valve, and PVI Assembly Federal contract opportunity
- Solicitation number
- W912K6-15-Q-0060-ANG
About this file
Site visit question and answer
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EXHIBIT_F.docx | DOCX document | |
| Davis_Bacon_GD_NO_MD150044_073115_-_MD44.docx | DOCX document | |
| 175th_WING_INSTALLATION_ACCESS_APPLICATION-1w.docx.pdf | ||
| SOW_PJMS_152013_Replace_Fire_Hydrant_ _Valve.doc | DOC document | |
| Bollard_Detail.pdf | ||
| Hydrant_With_Tee_ _Valve_STD_No_BC833.02.pdf | ||
| W912K6-15-Q-0060.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit – Fire Hydrant, Solicitation W912K6-15-Q-0060-ANG held at Maryland Air National Guard Base 9/16/2015, 9:00am Questions and Responses
REF: Hydrant Q: Are the pipes ductile or cast iron pipes? The pipes are believed to be cast iron.
Q: Are we able to provide exact problem of non-working hydrant? This is not required information for bidders since the scope of work is to replace the complete hydrant and valve assembly.
Q: What is the fire hydrant standard? As noted per specification attachment, shall be in accordance with Baltimore City specifications.
REF: PVI, should read PIV Q: Is it PVI or PIV? There was a typo and where it reads PVI should read PIV (Post Indicator Valve) Q: Is the main a 10” main? The existing water main is 10”.
Q: Is the contractor responsible for capping the old one? The contractor is not required to cap the old system.