W912JD-18-R-2002 Modify Diesel Fill Stand
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Award_RFI_1.pdf | ||
| 11_Vehicle_Maintenance_Shops.pdf | ||
| ME93.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SC06001800867
FY18 Modify Diesel Fuel Stand project at Maine Air National Guard, 106 Ashley Avenue, Bangor, Maine 04401.
This project consists of the design and construction of an upgraded diesel f ill station for the Maine Air National Guard, 101st ARW, Bangor, Maine. This w ork shall include any required equipment, modifications to existing systems, modifications and/or extensions of existing pavements, containment, lightning protection, f ire suppression, lighting, signage, and connections to existing infrastructure as necessary to provide a complete and useable system.
The North American Industry Classif ication (NAICS) code is 237120 and the Small Business Size Standard is $36.5M in average annual receipts for the previous three years. Project Magnitude is Betw een $100,000 and $250,000.
JASON M. EDWARDS 2074047107
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
31-Aug-2018
(RFP)
(IFB)
X
CALL:
Modify Diesel Fill Stand
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________21 Sep 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
101 MSG/MSC BASE CONTRACTING
BASE CONTRACTING OFFICE
101 MAINEIAC AVENUE, SUITE 505
BANGOR ME 04401-8010
W912JD
PAGE OF PAGES
1 OF
CODE W912JD
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
101 MSG/MSC BASE CONTRACTING
JASON M. EDWARDS
101 MAINEIAC AVENUE, SUITE 505
BANGOR ME 04401-8010
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
FKNN172315
8. ADDRESS OFFER TO (If Other Than Item 7)
207 404 7177FAX:TEL: 207 404 7107 TEL: 207 404 7107 FAX: 207 404 7177
W912JD18R2002 53
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912JD18R2002
Section 00010 - Solicitation Contract Form
MODIFY DIESEL FILL STAND SOO
MAINE AIR NATIONAL GUARD
101st CIVIL ENGINEER SQUADRON (AMC)
106 ASHLEY AVENUE, SUITE 486
BANGOR, MAINE 04401-3051
STATEMENT OF OBJECTIVES:
MODIFY DIESEL FILL STAND
PROJECT NUMBER: FKNN172315
18 January 2018 Revised 27 August 2018
FOR
UNITED STATES PROPERTY AND FISCAL OFFICES
MAINE NATIONAL GUARD
AUGUSTA, MAINE 04333
1. PURPOSE: The purpose of this project is to provide professional design and construction services necessary to upgrade the POL diesel fuel pump station to more effectively accommodate the diesel refueling mission, specifically to refuel the C-301 refueling truck through a bottom feed apparatus in a safe and timely manner.
2. SCOPE: This project shall include the following items:
2.1. On-site review of existing systems and infrastructure.
2.2. The design and construction of an upgraded diesel fill station for the Maine Air National Guard, 101st Air Refueling Wing, Bangor, Maine. This work shall include any required equipment, modifications to existing systems, modifications and/or extensions of existing pavements, containment, canopies, lightning protection, fire suppression, lighting, signage, and connections to existing infrastructure as necessary to provide a complete and useable system.
2.3. Provide site adaptable design drawings, specifications and cost estimates to be customized by multiple locations across the Air National Guard for a similar installation. Provide working files (CAD, Word, Excel), in addition to PDF’s (electronically plus three hard copies).
2.4. Any new or improved paved surfaces shall be designed to accommodate vehicle types ranging in AASHTO classification from P (passenger), to WB-67 (large delivery trucks).
2.5. Provide the government with projected design and construction schedules with significant milestones identified (refer to ANG ETL 10-03 for more design guidance).
3. APPLICABLE CODES: Project shall be design and constructed in compliance with the following codes:
3.1. ANG ETL 10-03 Tab C Design Objectives
3.2. ANG ETL 15-01 Air National Guard Design Policy. Applicable sections include, but are not limited to:
3.2.1. ANG ETL 15-01-04 Mechanical Engineering
3.2.2. ANG ETL 15-01-05 Electrical and Communications Engineering
3.2.3. ANG ETL 15-01-06 Roof Design
3.2.4. ANG ETL 15-01-07 Airfield and Vehicle Pavement Design Guidance
3.3. Unified Facilities Criteria (UFC) 3-460-01 Design of Petroleum Fuel Facilities
3.4. UFC 1-200-01 DoD Building Code (General Building Requirements)
3.5. UFC 3-110-03, Roofing
3.6. UFC 3-250-01FA, Pavement Design for Roads, Streets, Walks
3.7. UFC 3-301-01 Structural Engineering
3.8. NFPA 30A Code for Motor Fuel Dispensing Facilities and Repair Garages
3.9. NFPA 77 Recommended Practice on Static Electricity
3.10. API RP 2003 Protection Against Ignitions
3.11. API RP 1004 Bottom Loading and Vapor Recovery
3.12. Spill prevention, control and countermeasure per 40 CFR Part 112 and 33 CFR part 154
3.13. This project shall comply with facility design and construction related provisions of the Energy Policy Act of 2005 (EPAct 05) and Executive Order E.O. 13423.
3.14. Project shall also comply with the Energy Independence and Security Act of 2007 (EISA 07) including, but not limited to Section 438.
3.15. National Electrical Code
3.16. Installation (AF Form 103) and State of Maine DigSafe requirements
3.17. All other applicable DoD, Federal, State, and Local requirements
4. PERFORMANCE REQUIREMENTS:
4.1. General: Provide turnkey design and installation of a diesel refueling station, specifically to refuel the C- 301 refueling truck through a bottom feed apparatus. In accordance with all federal, state and local laws and requirements, provide labor, equipment and supervision to complete the installation of the above described system.
Proposals are to include all third party inspections including, but not limited to, soil boring compaction, concrete air and slump testing. Commissioning of the system shall be included in the proposal, as well as operator and maintenance training and manuals.
4.1.1. Shall have a flexible hose with quick-disconnect single point nozzle.
4.1.2. Shall have grounding capabilities.
4.1.3. Shall drain into existing Oil Water Separator.
4.1.4. Shall have ability to meter fuel discharged from bulk storage into fuel trucks.
4.1.5. Shall have shelter over exposed fill stand.
4.2. Site: Existing site layout and as-built drawings are provided for reference. Contractor is encouraged to utilize existing equipment and infrastructure to the extent possible. The contractor is responsible for final layout, integration, and site grading elements including erosion and sedimentation controls (if required). Contractor shall be responsible for all permitting requirements.
4.3. System: The system shall be capable of pumping rates of 100 – 125 gpm, and provide overfill protection / shut-off capability.
5. PERIOD OF PERFORMANCE:
5.1. Total Design and Construction Period of Performance shall be 180 days.
6. OPERATING CONSTRAINTS:
6.1. Contractor shall ensure minimal shut-down of existing fueling station in order to maximize availability of the fueling station to base occupants.
6.2. Contractor shall provide a minimum of 72 hours’ notice to the Government prior to closure of any roads, shut-down of any utilities, or closure of the existing fueling station.
6.3. Work areas shall be properly marked and cordoned off to prevent unnecessary entrance of base personnel into construction zone.
7. PROPOSAL SUBMISSION REQUIREMENTS: Offerors shall provide a detailed narrative explaining how the proposal meets, exceeds or deviates from the performance requirements provided in paragraph 4 above. If offerors desire to deviate from any of the project performance requirements, the specific deviations must be identified and justification provided.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Construct: Diesel Fill Stand
FFP
Design and Construction: The contractors shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to perform all work associated with the design and construction of a diesel refueling station, specifically to refuel the C-301 refueling truck through a bottom feed apparatus.
This work shall include any required equipment, modifications to existing systems, modifications and/or extensions of existing pavements, containment, lightning protection, fire suppression, lighting, signage, and connection to the existing infrastructure as necessary to provide a complete and useable system. All work shall be built as described in the Statement of Objectives and specifications. Period of performance is 180 days from notice to proceed.
FOB: Destination
PURCHASE REQUEST NUMBER: SC06001800867
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job eCMRA Reporting
FFP
The contractor shall completely fill in all required data fields using the following web address: https://www.ecmra.mil.
PURCHASE REQUEST NUMBER: SC06001800867
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 180 dys. ADC 1 101 ARW/CE
ELIZABETH LIBBY
CIVIL ENGINEERS - F7QJCE
106 ASHLEY AVENUE
SUITE 486
BANGOR ME 04401-8029
207-404-7367
F7QJCE
0002 180 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
F7QJCE
CLAUSES INCORPORATED BY REFERENCE
52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-22 Limitations on Pass-Through Charges--Identification of
Subcontract Effort
OCT 2009
52.225-10 Notice of Buy American Requirement--Construction Materials
MAY 2014
52.236-28 Preparation of Proposals--Construction OCT 1997 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
CLAUSES INCORPORATED BY FULL TEXT
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)
(a) Definitions. As used in this provision--
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) database means that--
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into the SAM database;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in the SAM database;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record ``Active''.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b)(1) By submission of an offer, the Offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in the SAM database.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state, and Zip Code.
(4) Company mailing address, city, state and Zip Code (if separate from physical).
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) Offerors may obtain information on registration at https://www.acquisition.gov.
(End of clause)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed-Price contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
0.8% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Bangor, Maine, Penobscot County.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Office of Chief Counsel ATTN: NGB Protest Decision Authority 111 S. George Mason Drive Arlington, VA 22204-1373 FAX: (703) 607-3684 or 3682
OR
101 MSG/MSC
ATTN: Base Contracting Officer 101 Maineiac Ave., STE 505 Bangor, ME 04401
FAX: (207) 404-7177
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- 10 September 2018 at 9:00 AM EST
(c) Participants will meet at-- Maine Air National Guard Civil Engineering Squadron Classroom 106 Ashley Ave, STE 486 Bangor, ME 04401
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.215-7009 PROPOSAL ADEQUACY CHECKLIST (JAN 2014)
The offeror shall complete the following checklist, providing location of requested information, or an explanation of why the requested information is not provided. In preparation of the offeror's checklist, offerors may elect to have their prospective subcontractors use the same or similar checklist as appropriate.
PROPOSAL ADEQUACY CHECKLIST
REFERENCES
SUBMISSION
ITEM
PROPOSAL
PAGE No.
If not provided EXPLAIN (may use continuation pages)
GENERAL INSTRUCTIONS
1. FAR 15.408, Table 15-2, Section I Paragraph A
Is there a properly completed first page of the proposal per FAR 15.408 Table 15-2 I.A or as specified in the solicitation?
2. FAR 15.408, Table
Paragraph A(7)
Does the proposal identify the need for Government-furnished material/tooling/test equipment? Include the accountable contract number and contracting officer contact information if known.
3. FAR 15.408, Table
Paragraph A(8)
Does the proposal identify and explain notifications of noncompliance with Cost Accounting Standards Board or Cost Accounting Standards (CAS); any proposal inconsistencies with your disclosed practices or applicable CAS; and inconsistencies with your established estimating and accounting principles and procedures?
4. FAR 15.408, Table 15-2, Section I, Paragraph C(1)
FAR 2.101, “Cost or pricing data”
Does the proposal disclose any other known activity that could materially impact the costs?
This may include, but is not limited to, such factors as—
(1) Vendor quotations;
(2) Nonrecurring costs;
(3) Information on changes in production methods and in production or purchasing volume;
PROPOSAL
PAGE No.
If not provided EXPLAIN (may use continuation pages)
(4) Data supporting projections of business prospects and objectives and related operations costs;
(5) Unit-cost trends such as those associated with labor efficiency;
(6) Make-or-buy decisions;
(7) Estimated resources to attain business goals; and
(8) Information on management decisions that could have a significant bearing on costs.
5. FAR 15.408, Table
Paragraph B
Is an Index of all certified cost or pricing data and information accompanying or identified in the proposal provided and appropriately referenced?
6. FAR 15.403-1(b) Are there any exceptions to submission of certified cost or pricing data pursuant to FAR 15.403-1(b)? If so, is supporting documentation included in the proposal?
(Note questions 18-20.)
7. FAR 15.408, Table
Paragraph C(2)(i)
Does the proposal disclose the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data?
8. FAR 15.408, Table
Paragraph C(2)(ii)
Does the proposal disclose the nature and amount of any contingencies included in the proposed price?
9. FAR 15.408 Table 15-2, Section II, Paragraph A or B
Does the proposal explain the basis of all cost estimating relationships (labor hours or material) proposed on other than a discrete basis?
10. FAR 15.408, Table
Paragraphs D and E
Is there a summary of total cost by element of cost and are the elements of cost cross-referenced to the supporting cost or pricing data? (Breakdowns for each cost element must be consistent with your cost accounting system, including breakdown by year.)
PROPOSAL
PAGE No.
If not provided EXPLAIN (may use continuation pages)
11. FAR 15.408, Table 15-2, Section I Paragraphs D and E
If more than one Contract Line Item Number (CLIN) or sub Contract Line Item Number (sub-CLIN) is proposed as required by the RFP, are there summary total amounts covering all line items for each element of cost and is it cross-referenced to the supporting cost or pricing data?
12. FAR 15.408, Table
Paragraph F
Does the proposal identify any incurred costs for work performed before the submission of the proposal?
13. FAR 15.408, Table
Paragraph G
Is there a Government forward pricing rate agreement (FPRA)? If so, the offeror shall identify the official submittal of such rate and factor data. If not, does the proposal include all rates and factors by year that are utilized in the development of the proposal and the basis for those rates and factors?
COST ELEMENTS
MATERIALS AND SERVICES
14. FAR 15.408, Table 15-2, Section II Paragraph A
Does the proposal include a consolidated summary of individual material and services, frequently referred to as a Consolidated Bill of Material (CBOM), to include the basis for pricing? The offeror’s consolidated summary shall include raw materials, parts, components, assemblies, subcontracts and services to be produced or performed by others, identifying as a minimum the item, source, quantity, and price.
SUBCONTRACTS (Purchased materials or services)
15. DFARS 215.404-3 Has the offeror identified in the proposal those subcontractor proposals, for which the contracting officer has initiated or may need to request field pricing analysis?
16. FAR 15.404-3(c)
FAR 52.244-2
Per the thresholds of FAR 15.404-3(c), Subcontract Pricing Considerations, does the proposal include a copy of the applicable subcontractor’s certified cost or pricing data?
PROPOSAL
PAGE No.
If not provided EXPLAIN (may use continuation pages)
17. FAR 15.408, Table 15-2, Note 1;
Section II Paragraph A
Is there a price/cost analysis establishing the reasonableness of each of the proposed subcontracts included with the proposal?
If the offeror’s price/cost analyses are not provided with the proposal, does the proposal include a matrix identifying dates for receipt of subcontractor proposal, completion of fact finding for purposes of price/cost analysis, and submission of the price/cost analysis?
EXCEPTIONS TO CERTIFIED COST OR PRICING DATA
18. FAR 52.215-20
FAR 2.101,
“commercial item”
Has the offeror submitted an exception to the submission of certified cost or pricing data for commercial items proposed either at the prime or subcontractor level, in accordance with provision 52.215-20?
a. Has the offeror specifically identified the type of commercial item claim (FAR
2.101 commercial item definition, paragraphs (1) through (8)), and the basis on which the item meets the definition?
b. For modified commercial items (FAR
2.101 commercial item definition paragraph (3)); did the offeror classify the modification(s) as either—
i. A modification of a type customarily available in the commercial marketplace (paragraph (3)(i)); or
ii. A minor modification (paragraph (3)(ii)) of a type not customarily available in the commercial marketplace made to meet Federal Government requirements not exceeding the thresholds in FAR 15.403- 1(c)(3)(iii)(B)?
c. For proposed commercial items “of a type”, or “evolved” or modified (FAR
2.101 commercial item definition paragraphs (1) through (3)), did the contractor provide a technical description of the differences between the proposed item and the comparison item(s)?
19.
[Reserved]
20. FAR 15.408, Table 15-2, Section II Paragraph A(1)
Does the proposal support the degree of competition and the basis for establishing the source and reasonableness of price for each subcontract or purchase order priced
PROPOSAL
PAGE No.
If not provided EXPLAIN (may use continuation pages) on a competitive basis exceeding the threshold for certified cost or pricing data?
INTERORGANIZATIONAL TRANSFERS
21. FAR 15.408, Table 15-2, Section II Paragraph A.(2)
For inter-organizational transfers proposed at cost, does the proposal include a complete cost proposal in compliance with Table 15-2?
22. FAR 15.408, Table 15-2, Section II Paragraph A(1)
For inter-organizational transfers proposed at price in accordance with FAR 31.205- 26(e), does the proposal provide an analysis by the prime that supports the exception from certified cost or pricing data in accordance with FAR 15.403-1?
DIRECT LABOR
23. FAR 15.408, Table 15-2, Section II Paragraph B
Does the proposal include a time phased (i.e.; monthly, quarterly) breakdown of labor hours, rates and costs by category or skill level? If labor is the allocation base for indirect costs, the labor cost must be summarized in order that the applicable overhead rate can be applied.
24. FAR 15.408, Table
Paragraph B
For labor Basis of Estimates (BOEs), does the proposal include labor categories, labor hours, and task descriptions, (e.g.;
Statement of Work reference, applicable CLIN, Work Breakdown Structure, rationale for estimate, applicable history, and time-phasing)?
25. FAR subpart 22.10 If covered by the Service Contract Labor Standards statute (41 U.S.C. chapter 67), are the rates in the proposal in compliance with the minimum rates specified in the statute?
INDIRECT COSTS
26. FAR 15.408, Table 15-2, Section II Paragraph C
Does the proposal indicate the basis of estimate for proposed indirect costs and how they are applied? (Support for the indirect rates could consist of cost breakdowns, trends, and budgetary data.)
OTHER COSTS
PROPOSAL
PAGE No.
If not provided EXPLAIN (may use continuation pages)
27. FAR 15.408, Table 15-2, Section II Paragraph D
Does the proposal include other direct costs and the basis for pricing? If travel is included does the proposal include number of trips, number of people, number of days per trip, locations, and rates (e.g. airfare, per diem, hotel, car rental, etc)?
28. FAR 15.408, Table
Paragraph E
If royalties exceed $1,500 does the proposal provide the information/data identified by Table 15-2?
29.
FAR 15.408, Table
Paragraph F
When facilities capital cost of money is proposed, does the proposal include submission of Form CASB-CMF or reference to an FPRA/FPRP and show the calculation of the proposed amount?
FORMATS FOR SUBMISSION OF LINE ITEM SUMMARIES
30. FAR 15.408, Table 15-2, Section III
Are all cost element breakdowns provided using the applicable format prescribed in FAR 15.408, Table 15-2 III? (or alternative format if specified in the request for proposal)
31. FAR 15.408, Table 15-2, Section III Paragraph B
If the proposal is for a modification or change order, have cost of work deleted (credits) and cost of work added (debits) been provided in the format described in FAR 15.408, Table 15-2.III.B?
32. FAR 15.408, Table 15-2, Section III Paragraph C
For price revisions/redeterminations, does the proposal follow the format in FAR 15.408, Table 15-2.III.C?
OTHER
33. FAR 16.4 If an incentive contract type, does the proposal include offeror proposed target cost, target profit or fee, share ratio, and, when applicable, minimum/maximum fee, ceiling price?
34. FAR 16.203-4 and
FAR
15.408 Table 15-2, Section II, Paragraphs A, B, C, and D
If Economic Price Adjustments are being proposed, does the proposal show the rationale and application for the economic price adjustment?
35.
FAR 52.232-28 If the offeror is proposing Performance- Based Payments did the offeror comply with FAR 52.232-28?
PROPOSAL
PAGE No.
If not provided EXPLAIN (may use continuation pages)
36. FAR 15.408(n)
FAR 52.215-22
FAR 52.215-23
Excessive Pass-through Charges– Identification of Subcontract Effort: If the offeror intends to subcontract more than 70% of the total cost of work to be performed, does the proposal identify: (i) the amount of the offeror’s indirect costs and profit applicable to the work to be performed by the proposed subcontractor(s); and (ii) a description of the added value provided by the offeror as related to the work to be performed by the proposed subcontractor(s)?
Section 00100 - Bidding Schedule/Instructions to Bidders
SECTION 00100
Section 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. SCOPE
1.1. You are invited to submit a proposal in response to our Request for Proposal W912JD-18-R-2002 for Project No. FKNN172315 at Maine Air National Guard Base, Bangor, ME 04401. As a result of this solicitation, the Government intends to award a single Firm Fixed Price (FFP) contract to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
1.2. This solicitation is set-aside 100% for small businesses.
2. NOTICE OF PRE-PROPOSAL CONFERENCE
2.1. A pre-proposal conference will be conducted on 10 September 2018 at 9:00 AM EST for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at the Maine Air National Guard Base, Bldg. 486, Civil Engineering Squadron Classroom, Bangor, ME 04401.
Interested Contractors are highly encouraged to attend the pre-proposal conference. The site visit will be held following the conference.
2.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to jason.m.edwards1.mil@mail.mil.
Visitor’s Name Last Four Digits of Social Security No.
Driver’s License No., State Issued and Expiration Date Date of Birth Citizenship
2.3. This information must be provided in advance, not later than 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees.
Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
2.4. Visitors must pick up their passes at the Installation’s Main Entry Gate prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Driver’s License, (3) Proof of Insurance for Vehicle, and/or (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
2.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
2.6. A record of the conference shall be made and furnished to all prospective offerors via posting to http://www.fbo.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS
3.1. Submit all questions via email to the contracting office at the address shown below. Do NOT contact the A-E or Engineering personnel directly. Doing so will only delay the response to your question.
Subject Line: Reference No. W912JD-18-R-2002 Email: jason.m.edwards1.mil@mail.mil
INQUIRIES SHALL BE SUBMITTED VIA EMAIL AND INCLUDE THE FOLLOWING INFORMATION:
Date of Proposal Inquiry:
From: ______________________________
Company Name: ___________________________
Phone Number: ____________________________
Email address: _____________________________
Proposal Inquiry: Be specific as to part of solicitation you are questioning.
3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.
3.3. The Contracting Officer reserves the right to address questions received after the fifth day prior to solicitation closing with those offers deemed compliant and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to closing and will be posted not later than two working days prior to closing. OFFERORS ARE STRONGLY ENCOURAGED
TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.
3.4. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to www.fbo.gov.
3.4.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.
3.4.2. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (www.FedBizOpps.gov or www.fbo.gov) system. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Plans and specifications are locked on FBO and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See the instructions on FBO regarding registration as Interested bidders/offerors must register with FedBizOpps before accessing the system. (Please note the registration for access to the secure site takes approximately 15 business days, so plan accordingly.)
3.4.2.2. Interested offerors must be registered in the System for Award Management (SAM). To register go to:
www.sam.gov. You will need your DUNS number to register. Instructions for registering are on the web page.
4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS
4.1. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Proposal. All information relating to this
RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted at www.fbo.gov.
4.2. Offerors are strongly cautioned to check this site frequently and to “refresh” their web page to ensure they have the lasted information.
5. HAND CARRIED PROPOSALS/INVITATIONS
5.1. A bid repository is provided for hand carried proposals and is located at: Maine Air National Guard, Base Contracting Office, 103 Maineiac Ave., STE 505, Bangor, ME 04401.
5.2. Hand carried proposals must be deposited in the repository prior to the time established for receipt of proposals.
5.3. Offerors are cautioned that approval to enter the base must be obtained prior to the closing date for receipt of proposals. Follow the procedures outlined above in paragraph 2.1.2. for entry. Delays are probable at the entry point and should be accounted for. Late receipt of proposals due to base entry delays may not be deemed excusable and the Contracting Officer may declare the proposal late and remove it from consideration.
6. WAGE DETERMINATION
6.1. The Construction Wage Rate Requirements formerly known as Davis Bacon Wage Rates are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are ME180093 06/01/2018 for Penobscot County, Maine.
In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of the solicitation, the most current wage determination is in effect. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes.
If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404- 5(c)(4) will apply.
6.2. Applicable wage rates can be found at http://wdol.gov/dba.aspx.
7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.
8. REMOVAL OF SECTIONS AT TIME OF AWARD
Sections 00100, 00110, 00120, 00600 and all exhibits will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.
9. DISPOSITION OF UNSUCCESSFUL PROPOSALS
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals. The Government will destroy extra copies of unsuccessful proposals. No destruction certificate will be provided.
10. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES
It has been determined that all temporary utilities shall be the responsibility of the contractor. The contractor will pay all charges (hook up fees, metering, monthly usage, etc.) resulting from temporary utilities. The offerors shall take this into consideration when computing their offers. (FAR Clause 52.236-14, Availability and Use of Utility Services.)
11. BID BONDS
An Original Bid bond is required with submission of the proposal. The bid bond is due on the date as stated on the SF1442 block 13. The bid bond must be on a SF24 form. Rejection of a bid bond shall be in accordance with FAR 28.101-4 Noncompliance with bid guarantee requirements.
12. EXCEPTIONS
If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00010 through 00800) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.
13. CLAUSES
12.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
12.2. Clauses and provisions in this document may not appear in consecutive order.
14. BRAND NAME REQUIREMENTS
N/A.
End of Section 00100
INSTRUCTIONS TO OFFERORS
INSTRUCTION TO OFFERORS ON PROPOSAL PREPARATION AND EVALUATION OF OFFERS AND
AWARD
Instructions: Provide a Project Plan in any format with a Tentative NTP date of 30 September 2018. Additionally, provide a brief synopsis (NTE 3 pages) describing your technical solution to augment and support the Project Plan to meet the period of performance accordingly.
Evaluation: Low Price Technically Acceptable (LPTA). The offeror’s technical proposal shall be evaluated on an Acceptable/Unacceptable basis. Offerors who rate unacceptable in Technical will be removed from further consideration for award. Price will be evaluated to determine reasonableness of the proposed price. Unreasonable Offers cannot be selected for award.
a) A successful project plan will provide the Government confidence that the project is structured to be executable for the resources indicated. The Project Plan and products proposed should clearly demonstrate an adequate understanding of the tasks and resources necessary to necessary to design and construct a diesel fill stand in accordance with the attached Statement of Objectives.
b) Project Schedule. A successful project schedule will provide the Government confidence that the project is structured to be executable for the resources indicated, is task oriented and indicates dates on which milestones will be achieved, and shows a total completion date of NLT 180 days after issuance of NTP.
c) Submittal with cut sheets. Acceptable cut sheets will indicate that the equipment/products offered meet the minimum requirements as detailed in the Statement of Objectives and/or Specifications and Drawings.
d) Provide an AF Form 3052 or similar format that includes detailed costs associated with work.
Subcontracted work should also be submitted in the same format.
• ACCEPTABLE: -Proposal meets the requirements of the solicitation.
• UNACCEPTABLE: -Proposal does not meet the requirements of the solicitation
Past Performance: The Government will evaluate the quality, timeliness, management and safety of the offeror's past performance considering currency, relevancy, sources, context, and trends on recent (within the last 3 years) projects performed under open market projects performed in support of locations serviced by National Guard Contracting Offices and other agencies. Also, evaluations available through the Past Performance Information Retrieval System (PPIRS) may be used. Past Performance is being used as an evaluation factor within the LPTA process. Past Performance will be rated on an acceptable or unacceptable basis using the rating in Table A-1.
Table A-1. Past Performance Evaluation Ratings Rating Description Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below.)
Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”
Section 00600 - Representations & Certifications
52.209-7 Information Regarding Responsibility Matters JUL 2013 52.211-6 Brand Name or Equal AUG 1999 52.222-38 Compliance With Veterans' Employment Reporting
Requirements
FEB 2016
252.203-7005 Representation Relating to Compensation of Former DoD Officials
NOV 2011
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2018)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237120.
(2) The small business size standard is $36,500,000.
(3) The small business size standard…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.